DELHI
HIMACHALPRADESH
UTTAR PRADESH
N E P A L
C H I N A
I N D I A
C H I N A
PAKISTAN
C H I N A
B A N G L A D E S H
M Y A N A M A R
Lucknow
Patna
Gangtok
Itanagar
Dispur
Imphal
Aizawl
Agartala
Calcutta
ShilongBIHAR
WESTBENGAL
ARUNACHALPRADESH
ASSAM
MANIPUR
MEGHALAYA
NAGALAND
MIZORAMTRIPURA
SIKKIM
JAMMU & KASHMIR
Srinagar
Shimla
MINISTRY OF NON-CONVENTIONAL ENERGY SOURCES
Government of India
A Report on
July 2001
GEF
MAIN REPORTVolume I -
UNDP-GEF HILLY HYDRO PROJECT
A REPORT ON ZONAL PLAN - Activity
A .Report on
ZONAL PLAN - Activity Block
Volume I -MAIN REPORT
ALTERNATE HYDRO ENERGY CENTRE
Indian Institute of Technology(Formerly known as University of Roorkee)
in collaboration with
Department of Earth Sciences,Centre for Remote Sensing,
and
National Institute of Hydrology, Roorkee
April 2002
DDIISSCCLLAAIIMMEERR
TThhee ddaattaa uusseedd iinn tthhiiss rreeppoorrtt hhaass bbeeeenn ggeenneerraatteedd ffrroomm SSuurrvveeyy ooff IInnddiiaann TTooppoosshheeeettss.. SSoommee ddaattaa hhaass aallssoo bbeeeenn ccoolllleecctteedd bbyy tthhee ddiiffffeerreenntt aaggeenncciieess dduurriinngg pprreeppaarraattiioonn ooff tthhee rreeppoorrtt.. EEvveerryy ccaarree hhaass bbeeeenn ttaakkeenn ttoo eennssuurree tthhaatt tthhee ddaattaa iiss ccoorrrreecctt,, ccoonnssiisstteenntt aanndd ccoommpplleettee aass ffaarr aass ppoossssiibbllee..
TThhee ccoonnssttrraaiinnttss ooff ttiimmee aanndd rreessoouurrcceess aavvaaiillaabbllee,, hhoowweevveerr ddoo nnoott pprreecclluuddee tthhee ppoossssiibbiilliittyy ooff eerrrroorrss,, oommiissssiioonnss eettcc.. iinn tthhee ddaattaa aanndd ccoonnsseeqquueennttllyy iinn tthhee rreeppoorrtt pprreeppaarraattiioonn..
UUssee ooff tthhee ccoonntteennttss ooff rreeppoorrtt ccaann bbee mmaaddee wwiitthh dduuee ppeerrmmiissssiioonn ffrroomm tthhee MMiinniissttrryy ooff NNoonn--ccoonnvveennttiioonnaall EEnneerrggyy SSoouurrcceess,, GGoovveerrnnmmeenntt ooff IInnddiiaa..
ACRONYMS
MNES
AHEC
Ministry of Non-conventionalEnergy Sources
Alternate Hydro Energy Centre
UNOP
SOl
United Nation Development Programme
Survey of India
National Remote Sensing AgencyNRSA
OOP
GEF
kW
MW
Department of Power
Global Environment Facility
SHP
NGO
Kilo Watt
Mega Watt
Small Hydropower
UPJVN
NEDA
Non-Government Organisation
Uttar Pradesh Jal Vidyut Nigam Ltd.
HimUrja
Non-Conventional Energy Development Agency
Himachal Pradesh Government Agency
Bihar State Hydrpower Corporation Ltd.
Meghalaya Non-Conventional Renewable Energy Development Agency
Assam Science and Technology Environment Council
BHPC
MNREDA
ASTEC
CEA Central Electricity Authority
Central Water CommissionCWC
NHPC National Hydro Power Corporation Ltd.
North Eastern Electric Power Company Limited
National Atlas and Thematic Mapping Organisation
NEEPCO
NATMO
UJVN
UPSEB
Uttaranchal Jal Vidyut Nigam Ltd.
Uttar Pradesh State Electricity Board.
Uttaranchal Renewable Energy Development Agency.
West Bengal State Electricity Board
West Bengal Non-Conventional Renewable Energy Development
UREDA
WBSEB
WBREOA
Agency
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC. DES. CRS& NIH, India
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
Report is presented in three volumes
Vol I: Main Report Vol II: Thematic Maps Vol III: Regional Flow Duration Models
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India i
VVoolluummee –– II :: MMaaiinn RReeppoorrtt PARTICULARS PAGE NO. SECTION 1 : THE HILLY HYDRO PROJECT IN GEF PORTFOLIO 1 SECTION 2 : ZONAL PLAN ACTIVITY BLOCK 7 2.1 INTRODUCTION 7 2.2 SOURCES OF INFORMATION 7 2.3 METHODOLOGY 8 2.3.1 Identification of Potential Sites 8 2.3.2 Computation of Available Head 10 2.3.3 Development of Regional and Sub Regional Flow 10 duration curves for ungauged catchments 2.3.4 Hydro Power Potential 10 2.3.5 Application of geographic information system for 10 potential small hydro sites, earthquake epicentre plotting and clusters identification (vol 2) 2.3.6 Methodology 10 2.4 PREPARATION OF STATE GEOLOGICAL MAPS (VOL 2) 11 2.5 PREPARATION OF VEGETATION COVER MAPS (VOL 2) 11 SECTION 3 : SMALL HYDRO POWER POTENTIAL 13 ANNEXURE I : SHP CLUSTER MAPS
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India ii
VVoolluummee –– IIII :: TThheemmaattiicc MMaappss PARTICULARS PAGE NO. CHAPTER-1 : Geological Studies 1. Explanation of Geological Maps 1 Geological Maps 1. Jammu & Kashmir 5 2. Himachal Pradesh 6 3. Uttar Pradesh 7 4. Bihar State 8 5. Arunachal Pradesh 9 6. Assam 10 7. Manipur 11 8. Meghalaya 12 9. Mizoram 13 10. Nagaland 14 11. Sikkim 15 12. Tripura 16 13. West Bengal 17 CHAPTER-2 : Seismological Studies 18 Seismic Map of India 21 Seismological Maps 1. Jammu & Kashmir 22 2. Himachal Pradesh 23 3. Uttar Pradesh 24 4. Bihar State 25 5. Arunachal Pradesh 26 6. Assam 27 7. Manipur 28 8. Meghalaya 29 9. Mizoram 30 10. Nagaland 31 11. Sikkim 32 12. Tripura 33 13. West Bengal 34
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India iii
CHAPTER-3 : Vegetation Studies 1. Geographic Area, Recorded Forest Cover and Actual Forest Cover of various States 35 2. Reserved/Protected/Unclassified Forest area 36 3. District wise Forest cover 37 4. Comparative Forest cover (1989-1995 assessment) 41 5. Recorded Forest cove (1987) 42 Vegetation Maps 1. Jammu & Kashmir 43 2. Himachal Pradesh 44 3. Uttar Pradesh 45 4. Bihar State 46 5. Arunachal Pradesh 47 6. Assam 48 7. Manipur 49 8. Meghalaya 50 9. Mizoram 51 10. Nagaland 52 11. Sikkim 53 12. Tripura 54 13. West Bengal 55
VVoolluummee –– IIIIII :: RReeggiioonnaall FFllooww DDuurraattiioonn MMooddeellss
PARTICULARS PAGE NO. Preface
Acknowledgement
1.0 Introduction 1
1.1 Overview 1 1.2 Scope of Study 2
2.0 Review 4 3.0 Data for the Study 7
3.1 Data Requirement 7 3.2 Data Availability 7
4.0 Methodology 11
4.1 Flow Duration Curves for a Gauged Catchment 11 4.2 Effect of Time Interval on Flow Duration Curve 11 4.3 Plotting of Non-Dimensional Flows 13 4.4 Development of Regional Flow Duration Model 17
5.0 Analysis and Results 22
5.1 Model Development 22 5.2 Model Adequacy 32
6.0 Estimation of Dependable Flows for Ungauged Catchments 46 7.0 Discussion 47
7.1 Data Availability 47 7.2 Model Development 48 7.3 Model Application 48
8.0 Conclusions and Recommendations 49
8.1 Conclusions 49 8.2 Recommendations 50
REFERENCES 51 APPENDIX I 53 APPENDIX II 59 APPENDIX III 65 APPENDIX IV 145
iv UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India i
CCOONNTTEENNTT PARTICULARS PAGE NO. SECTION 1 1.1 THE HILLY HYDRO PROJECT IN GEF PORTFOLIO 1 1.2 OBJECTIVES AND SCOPE OF THE PROJECT 1 1.3 TARGET BENEFICIARIES 2 1.4 ACTIVITIES 2 1.4.1 Survey and Assessment 3 1.4.2 Zonal Plan 3 1.4.3 Technology Selection 4 1.4.4 Water Mill 4 1.4.5 Load Development / Low Wattage Appliances 4 1.4.6 Project Execution 4 1.4.7 Environment Assessment 5 1.4.8 Training 5 1.4.9 People’s Participation 6 1.4.10 Master Plan 6 SECTION 2 2.1 INTRODUCTION 1 2.2 SOURCES OF INFORMATION 1 2.3 METHODOLOGY 8 2.3.1 Identification of Potential Sites 8 2.3.2 Computation of Available Head 10 2.3.3 Development of Regional and Sub Regional Flow 10 duration curves for ungauged catchments (vol.3) 2.3.4 Hydro Power Potential 10
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India ii
PARTICULARS PAGE NO. 2.3.5 Application of geographic information system for 10 potential small hydro sites, earthquake epicentre plotting and clusters identification (Vol. 2) 2.3.6 Methodology 10 2.4 PREPARATION OF STATE GEOLOGICAL MAPS (VOL 2) 11 2.5 PREPARATION OF VEGETATION COVER MAPS (VOL 2) 11 Table 2.1 Information/Data Collected 8 Table 2.2 Forest Cover 12 Table 3.1 State wise status of Small Hydro Power Sites 13 Table 3.2 State wise number of sites with respect to Priority 14 Table 3.3 District wise SHP Potential in Different Himalayan States 15-19
Jammu & Kashmir, Himachal Pradesh, Uttaranchal, Jharkhand, Arunachal Pradesh, Assam, Manipur, Meghalaya, Mizoram, Nagaland, Sikkim, Tripura and West Bengal
Table 3.4 Number of Sites in North region with respect to Installed 19
and Head Range Table 3.5 Number of sites in North Easter region with respect to 20
Installed Capacity and Head Range Table 3.6 Number of Sites (Total) with respect to Installed Capacity 20
and Head Range Table 3.7 Number of Sites with respect to Installed Capacity and 21-25
Head Range Jammu & Kashmir, Himachal Pradesh, Uttar Pradesh, Jharkhand, Arunachal Pradesh, Assam, Manipur, Meghalaya, Mizoram, Nagaland, Sikkim, Tripura and West Bengal
Table 3.8 Details of SHP Sites Identified in
Jammu & Kashmir 26-35 Himachal Pradesh 36-58 Uttar Pradesh 59-74 Bihar 75-76 Arunachal Pradesh 77-101 Assam 102-105 Manipur 106-109
Meghalaya 110-113 Mizoram 114-116 Nagaland 117-120 Sikkim 121-123 Tripura 124 West Bengal 125-127
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India 1
SECTION 1 1.1 THE HILLY HYDRO PROJECT IN GEF PORTFOLIO The Project "Optimizing Development of Small Hydel Resources in the Hilly Regions of India” was approved by the Global Environment Facility(GEF) in 1994 to assist the Government of India in the optimum utilization of small hydel resources in the Himalayan and sub-Himalayan regions under its Technical Assistance programme. The project was approved with a total outlay of Rs.45 crores (US $ 15 million) and is shared through GEF inputs of US $ 7.5 million and Government of India inputs of Rs.22.48 crores. The execution of the Project was started in 1995 by Ministry of Non-conventional Energy Sources and monitored by UNDP. The Hilly Hydro proposal, was the first project from India to be included in the GEF portfolio. The project sought assistance to achieve:
• Reduction in global warming through use of a renewable, perennial, non-fossil fuel based energy source, namely small hydro energy.
• Protection of biodiversity in the Himalayan and sub-Himalayan regions, by
reducing deforestation. This will be achieved by providing electricity through locally available small hydel resources for cooking, heating, agricultural and commercial loads (besides lighting), thus replacing wood, and the adoption of irrigation-based cultivation instead of `burn and shift' cultivation.
* In addition, by creating enhanced job opportunities locally, due to availability
of electricity generated through local small hydel projects, the projects will also reduce population migration from those remote rural areas to urban centres, consequently reducing pollution in urban areas.
1.2 OBJECTIVES AND SCOPE OF THE PROJECT In order to achieve the above broad goals, the UNDP-GEF Hilly Hydro Project had envisaged the following objectives/ out puts:
• A national strategy and a master plan with detailed investment proposals will be prepared for the development of small hydro projects, for the entire Himalayan and sub-Himalayan regions.
• Twenty small hydro demonstration projects, commercially viable, set-up and commissioned at various selected sites. These will serve as model projects for replication throughout the hilly regions of India and possibly the world. Proven economical designs based on the latest available technologies, modified to suit local conditions, as well as methodology and approaches, for execution of small hydro projects, will be developed and made available.
• 100 watermills in different regions will be upgraded and developed with new technology, with add-on multipurpose devices for electricity generation etc. These will serve as prototypes for upgrading the remaining watermills in these regions.
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India 2
• Institutional and human resource capabilities, from local to national levels, needed for the execution/implementation of the project and for sustainable development of the Small hydel sector in hilly regions will be developed.
• Management and ownership models, through village-level elected bodies, co-operatives, NGOs, people's groups etc. will be developed, so that those demonstration units could be taken over by selected local agencies for operation, maintenance and overall management, including collection of revenues.
• Energy produced by these demonstration projects and upgraded watermills will be used for cooking, heating etc., thus saving wood, with consequent reduction in deforestation. Low Wattage cooking, heating and storage appliances will be developed, in association with the private sector, with improved designs and lower costs. People in remote villages will be trained in the use of these appliances by social marketing personnel and NGOs.
• The capabilities of three selected institutions of three different regions will be developed and upgraded to a considerable extent in the field of testing, training and applied research, as well as in the provision of consultancy and information services for small hydro projects..
• A revolving fund will be operationalised towards the end of the project to
provide soft loans for private participation in such projects. 1.3 TARGET BENEFICIARIES The target beneficiaries are the people who live in the remote villages in the hilly regions, mostly tribal, poor and illiterate. The intended benefit will be shared with the people by the identified implementing agencies and institutions, which will be associated with the planning, design, construction, operation and maintenance of these small hydel projects as well as provision of testing facilities, information and consultancy services etc., for these small hydel project, in full consultation with the people to be affected by such projects. In addition, there are some special considerations about the project as per followings:
a) Environmental protection and natural resources management. b) Poverty alleviation and grass root participation in development. c) Women in Development. d) Transfer and adaptation of technology for development. e) Technical cooperation amongst developing countries. f) Management Capability Development.
1.4 ACTIVITIES
The UNDP-GEF Hilly Hydro Project is implemented in 13 Himalayan and Sub-Himalayan States namely Jammu & Kashmir, Himachal Pradesh, Uttar Pradesh, Bihar, West Bengal, Assam, Arunachal Pradesh, Meghalaya, Mizoram, Manipur, Nagaland, Sikkim and Tripura. The work of the Project has been divided into a total of 87 activities, which are categorized in 10 Activity Blocks. These activity blocks are:
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India 3
(i) Survey and Assessment (ii) Zonal Plan (iii) Technology Selection (iv) Water Mill (v) Load Development/ Low Wattage Appliances (vi) Project Execution (vii) Environment Assessment (viii) Training (ix) People’s Participation (x) Master Plan
These activity blocks were allotted to five National Consulting groups, who were
advised by three International Consulting Companies. 1.4.1 Survey and Assessment
The survey and assessment activity in the project was envisaged to assess the capabilities, infrastructure and status of small hydro development in all the participating States. The information on small hydro power development in all the participating States was collected through intensive interaction with the State Power Departments/ SEBs, State Nodal Agencies for Renewable Energy, Agencies connected with the development of SHP, NGOs, Technical Institutions etc. Information regarding Energy Scenario in the States, status of small hydro power development, structure in the State to implement the SHP projects, projects under execution and survey, institutional capabilities etc. were compiled for all the 13 participating States. The study formed the bases of implementing the UNDP-GEF Hilly Hydro Project . 1.4.2 Zonal Plan
The Zonal Plan activity of the project envisages assessment of Zone wise potential of small hydro power development and identification of potential sites (up to 3 MW) by using latest techniques of remote sensing, computer modeling etc. The responsibility of under taking this work was given to Alternate Hydro Energy Center, University of Roorkee, Roorkee. The International consultant for this activity is M/s. Mead & Hunt, USA. The work of zonal plan has been done by AHEC with the active involvement of National Institute of Hydrology, Department of Earth Sciences and Center for Remote Sensing of University of Roorkee.
The exercise of assessing potential and identification of potential sites was started by collecting base information from the States. About 600 topographical maps of survey of India for the Himalayan Region were scanned. The Maps prepared by National Thematic Mapping Organisation, Calcutta were also utilised. With this information, catchment areas have been delineated and watershed boundaries are drawn. Discharge data of various catchments have been collected and are used for the development of Regional and Sub-Regional flow duration curves. Remote sensing data are also used for determining various parameters for the study. Information regarding earthquake epicenters, vegetation cover, geology and seismology have also being incorporated to arrive at potential sites for small hydro. The zonal plan has also taken into consideration, the study conducted by Central Electricity Authority on identification of potential sites up to 15 MW. The study has identified 2162 SHP potential sites with 3827 MW potential at 75% dependability.
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India 4
This report is the outcome of the zonal plan activity block. 1.4.3 Technology Selection
The Technology Selection activity envisaged survey of World literature and experience for selecting the most appropriate technology mix for use in the demonstration projects selected under the project. A comprehensive technology survey was under taken as part of this activity and appropriate technologies with new and cost effective ideas of civil, mechanical, electrical, transmission and distribution works in respect of all the demonstration sites have been identified. These technologies are now being used in the demonstration projects under execution as part of the project.
1.4.4 Water Mill
The Water Mill activity block aims at development of improved designs of water mills for mechanical and electricity generation. The activity envisages installation of 100 improved water mills. New designs of water mills for mechanical as well as electricity generation have been developed and tested at AHEC. 110 water mills with new designs including two electricity generating units have been installed in Uttar Pradesh (30), Himachal Pradesh (20), J&K (10) and Arunachal Pradesh (50). On the spot training was provided by the installation teams to all the beneficiaries. A training programme was organised at AHEC involving local bodies, NGOs, water mill owners etc. The response from these installations have been quite encouraging. Two manufacturing facilities, one at Saharanpur (U.P.) and one at Guwahati (Assam) have been created to manufacture the water mills based on new designs. 1.4.5 Load Development/ Low Wattage Appliances
Uniform load development is one of the most critical elements in the decentralized power projects for their improved plant load factor and economic viability. The project envisaged development of low wattage appliances for distribution of load and testing them in some existing SHP projects so that these experiences can be utilized directly in the demonstration projects after their commissioning.
Based on the International experience and World wide survey, various low wattage appliances such as low wattage water heating system, low wattage electric cooking system, night storage heaters for room heating, load limiters and load limiter managers, dual tariff energy meters etc. were developed through local manufacturers. The low wattage appliances were tested at three locations where the power is provided through small hydro power stations in de-centralised manner. These project locations are Jankichatti in U.P., Nindighagh in Bihar and Bazgo in J&K. The testing of devices and exposure regarding their use was done by involving local NGOs. The experience with these devices has been mixed. While the low wattage water heaters have been very well received by the users, the report about low wattage cookers are not encouraging. 1.4.6 Project Execution
The work in this activity is divided into two parts. Part-I relates to the preparation of various model documents required for the implementation of demonstration projects
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India 5
and could be useful in setting up similar hydel projects in the participating States. Model tender documents have been prepared and are also used for inviting tenders for all the demonstration projects.
The project envisages setting up of 20 small hydro demonstration projects.
Following 20 demonstration projects are being implemented with the technologies selected as part of technology selection activity:
S.No. Project State Capacity Developer 1. Soneprayag U.P. 500 KW UPJVN 2. Bikuriagad U.P 500 KW NEDA 3. Gangotri-II U.P 100 KW NEDA 4. Kanvashram U.P 100KW NEDA 5. Lingti H.P 400 KW HIMURJA 6. Kothi H.P 200 KW HIMURJA 7. Juthed H.P 100 KW HIMURJA 8. Solang H.P 1000KW A.Power Himalayas 9. Raskat H.P 800 KW Indu Sree Power 10. Titang H.P 800 KW Sai Eng. Foundation 11. Purthi H.P 100 KW HIMURJA 12. Sural H.P 100 KW HIMURJA 13. Jalimghagh-II Bihar 200 KW BHPC 14. Nindighagh-II Bihar 200 KW BHPC 15. Yakla Sikkim 100 KW Indian Army 16. Kalmoni Assam 100 KW MKB Pvt.Ltd 17 Nazirakhat Assam 10 KW ASTEC 18. Umlei Meghalaya 100 KW MNREDA 19. Pussimbing West Bengal 200 KW Sycotta Tea Estate 20. Chamong West Bengal 150 KW Bio Tea Estate 1.4.7 Environment Assessment
The project envisages preparation of Environment Management Plan (EMP) for mitigating adverse environment impact, if any due to execution of small hydro power projects. After the spot survey of about 10 sites a check list has been prepared to assess the environment impact of small hydro power projects to be set up as part of the project. Detailed base-line study of the sites have been conducted for the selected demonstration projects. The Environment management plan for the demonstration projects have been prepared and is being implemented. 1.4.8 Training One of the project objectives is to develop the institutional and human resource capabilities from local to national levels, as necessary for execution/implementation of the hydel projects and for sustainable development of the Small Hydel sector in the hilly regions. The officials at the national and state levels should be able to handle independently the planning, design, construction, maintenance, operation and management of the small hydro projects. Training programmes on various aspects of small hydro design, development, survey and investigation etc. and water mills were
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India 6
organised. In all over 200 Technical Officers from various State Agencies, NGOs, local bodies etc. have been trained. 1.4.9 People’s Participation In this activity block, management and ownership models, through village-level elected bodies, co-operatives, NGOs, peoples’ groups etc., are to be developed. A modal management and ownership modal has been developed and is tried in an ongoing project at Jankichatti, U.P.. The Jankichatti SHP project has been taken over by local body in the project area for operation and maintenance, and overall management including collection of revenue and expenditure. Based on this experience and at two other project locations, a suitable management methodology for participation of people/ beneficiary has been developed. 1.4.10 Master Plan
The preparation of Master Plan has been envisaged in the project incorporating national strategy, with detailed investment proposals for optimum utilisation of small hydel resources of the Himalayan and sub-Himalayan regions. A strategy is to be drawn after a review of the existing environment, legal, economic and policy framework for the development of SHP projects in these regions. The Master Plan has been prepared and envisages implementation of about 1,200 MW capacity small hydro projects in a period of about 15 years. The major input in preparing the master plan is the out put of Zonal Plan where potential sites have been identified with different priorities. State wise strategies have also been proposed to expedite development of SHP in the 13 participating States.
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India 7
ZONAL PLAN - ACTIVITY BLOCK SECTION 2 2.1 INTRODUCTION For most of the Himalayan communities in India, firewood is the primary source of energy for cooking and heating. This form of energy is damaging to the environment as carbon emissions from firewood directly contributes to global warming effects. The high price of other sources of energy with additional in this scenarios may be the transportation/transmission costs to remote communities, however, does not provide many viable options. Small hydro only possible alternative for reducing fire wood consumption, deforestation process and carbon emissions and improving global environment at comparatively lower costs. Small hydropower is definitely cleaner and environmentally acceptable form of energy than firewood, diesel etc. In addition, it promotes community self-sufficiency by locating the power source nearby, rather than depending on external supplies. Small hydropower is a renewable resource and has a long life span and lower annual operation and maintenance costs than many other sources of energy. There have always been various speculations about the small hydro potential in the Himalayas. However, no scientific or systematic attempts have been made to assess the full potential available. In this project for the first time such an attempt has been made to fully assess the overall small hydro potential in the Himalayas. About 600 topographical maps of Survey of India (SOI) of 1:50,000 scale were used and 2162 potential small hydro sites were identified in thirteen different states of the Himalayan region. This study also demonstrates the methodology for zonal plan preparation in small hydro sector. The field data from each participating state was collected through mail and visit. The data was compiled, reviewed and assessed together with broad potential of sector with already identified and surveyed sites. By and large all the existing stations are government owned barring few isolated locations specially in plantation industry or some Non Government Organisation (NGO) based stations. 2.2 SOURCES OF INFORMATION
* State Nodal Agencies for renewable energy in states
* State Electricity Boards, Deptt. of Power of states
* Central Government MNES, CEA, CWC, NHPC & NEEPCO
* Individuals having background in such data calculation
* Survey of India including Digital Mapping Centre
* Forest Survey of India
* Indian Institute of Remote Sensing, Dehradun
* Regional Centre for Remote Sensing, Dehradun
* NATMO, Calcutta
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India 8
Table 2.1: Information/Data Collected from State State Agencies / Departments
Jammu & Kashmir
PDC PDD Planning Deptt.
Himachal Pradesh
HPSEB HimUrja Planning Deptt.
Uttar Pradesh NEDA UPLJVN UPSEB Irrigation planning Deptt.
Sikkim Power Deptt. Plg. Deptt
West Bengal WBREDA WBSEB Plg. Deptt.
Bihar BHPC Plg. Deptt
Arunachal Pradesh
Power Deptt. RWD Plg. Deptt.
Meghalaya Power Deptt. MSEB Plg. Deptt.
Manipur Electricity Deptt. Plg. Deptt. Science & Technology Deptt.
Nagaland Power Deptt. Plg. Deptt. Science & Technology Deptt.
Mizoram Electricity & Power Deptt. Plg. Deptt.
Tripura Power Deptt. S&T Plg. Deptt.
Central Govt. MNES CEA CWC NEEPCO
NHPC WAPCOS SOI FSI
IIRS RCRS NATMO
Individuals Experienced personnel working in the area
2.3 METHODOLOGY 2.3.1 Identification of Potential Sites The information regarding the possible locations of hydro sites were first attempted to be collected from various State Government Offices. Some States have already identified a few potential small hydro sites and could furnish this information, while most States did not provide any information. The Survey of India (SOI) topographic maps (1: 50,000) scale of the Himalayan region of the country were utilised to identify potential small hydro sites. Potential sites, which were earlier, identified by state agencies, were also verified during this process. Figure 1 illustrates schematic representation of potential catchment delineation methodology followed in the project. In order to identify potential catchments (figures 2 and 3) for small hydropower generation, the following criteria was adopted:
Survey of Indiatopographical maps
(scale: 1:50,000)
Geologicalmaps
Forest covermaps
Seismic ZoningMap
Delineationof potentialcatchments
based onset criteria
Generation of potentialcatchments drawings
containing informationderived from SOI
toposheets
DigitizationEarthquakeepicentraldata from
USGS
Cluster plottingpotential sites
Overlay plotting ofclusters of potentialsites on geological
forest, seismiczoning maps
UN
DP
-GE
FH
illyH
ydro
Pro
ject-
ZonalP
lan
AH
EC
,DE
S,C
RS
&N
IH,In
dia
Figure 1: Schematic representation of potential catchment delineation methodology followed in the project.
El 3000m
El 2600mDiversion weir
El 2600m
Powerhouse El 2280m
El 2800m
78° 25'
78° 25'
31°
40'
1. Reference Toposheet : 53 I/62. Name of Stream :3. Name of River Basin : SATLUJ4.Catchment Area(sqkm) : 8.85. Length of main Channel: 9.5 km6. Catchment Perimeter : 21.0 km7. Elevation above mean sea level
- Heighest point : 5092 m- Meeting point : 2360 m- Longitude : 78° 26'- Latitude : 31° 40'
8. Snow fed/ Glacier fed/
KANAM
rain fed
UNDP/GEF HILLY HYDROINDIA PROJECT
STATE H.P.ZONAL PLAN
DISTRICT KINNAUR
CATCHMENT
Ref: AHEC/DES/CED/NIH
KANAM
Scale : 1: 50,000
Catchment Boundary
Figure 2: Shows delineation of potential catchment on Survey of India toposheet (source scale 1:50,000).
UN
DP
-GE
FH
illyH
ydro
Pro
ject-
ZonalP
lan
AH
EC
,DE
S,C
RS
&N
IH,In
dia
El 3000m
El 2600mDiversion weir
El 2600m
Powerhouse El 2280m
El 2800m
78° 25'
78° 25'
31°
40'
1. Reference Toposheet : 53 I/62. Name of Stream :3. Name of River Basin : SATLUJ4.Catchment Area(sqkm) : 8.85. Length of main Channel: 9.5 km6. Catchment Perimeter : 21.0 km7. Elevation above mean sea level
- Heighest point : 5092 m- Meeting point : 2360 m- Longitude : 78° 26'- Latitude : 31° 40'
8. Snow fed/ Glacier fed/
KANAM
rain fed
UNDP/GEF HILLY HYDROINDIA PROJECT
STATE H.P.ZONAL PLAN
DISTRICT KINNAUR
CATCHMENT
Ref: AHEC/DES/CED/NIH
KANAM
Scale : 1: 50,000
Catchment Boundary
Labrang
Kanam
Gothan Lungpa
Kanam
4488
5092
SATLUJ
Figure 3: Illustrates potential delineated catchment and other relevant information derived from Survey of India toposheet.
UN
DP
-GE
FH
illyH
ydro
Pro
ject-
ZonalP
lan
AH
EC
,DE
S,C
RS
&N
IH,In
dia
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India 9
1. Catchment should have an area of at least about 10 km2 2. Channel should be perennial in nature (in SOI toposheets perennial
channels/streams are marked with blue colour) 3. Main channel should have a length of about 7-8 km, and 4. Availability of head should be at least 20 m. Once the above basic criteria were satisfied, all potential catchments in all the thirteen Himalayan and sub Himalayan states (Jammu & Kashmir, Himachal Pradesh, Uttar Pradesh, Bihar, West Bengal, Assam, Arunachal Pradesh, Manipur, Meghalaya, Mizoram, Nagaland, Sikkim and Tripura) were delineated using SOI toposheets. During delineation process the following information associated with individual catchments were also extracted from the toposheets: (a) SOI toposheets references
(b) Name of the stream as mentioned in the SOI toposheet
(c) Name of the river basin
(d) Catchment area (in km2) measured using Planimeter
(e) Length of main channel (in km) measured using Rotometer
(f) Catchment perimeter (in km) measured using Planimeter
(g) Highest point elevation of the catchment (in meters as above mean sea level)
(h) Elevation at stream meeting point with the major river (in meters - above
mean sea level)
(i) Stream meeting point with the main river Latitude and Longitude (in degree
and minutes).
(j) Information about the snow/glacier/rain fed nature of the catchment (it is
possible to identify glaciers and snow covered areas in the SOI toposheets).
(k) Name of the state in which the potential catchment is situated.
(l) Name of the district in which the potential catchment is situated.
(m) Major contour lines crossing the stream near the main river meeting points
were also marked in order to extract information regarding available head for
power generation.
(n) Major road network available near the potential site.
(o) Locations of villages and town were also marked in all drawings to have an
idea about the load/power consumption.
(p) Latitude and longitude grid on all sides of the drawing were also marked as
given in SOI toposheets.
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India 10
After delineation of all potential catchments of all thirteen Himalayan states, information (a to p as mentioned above) related with individual catchment were entered in a Spreadsheet Programme (Lotus 1-2-3) for presentation and for future use. Details of all individual sites identified in this project are provided in Annexure I. 2.3.2 Computation of Available Head One of the major factors for the assessment of a potential small hydro site is the head available in the catchment. To compute this information, the points on the main channel where the elevation contours cross the channel were marked on the catchment drawing. In each catchment, lower two-third length of the channel was considered for the determination of head (drop), since this part of the channel carries maximum discharge. The information on available head was used to evaluate its hydropower potential. 2.3.3 Development of Regional and Sub Regional Flow duration curves for
ungauged catchments (vol 3) The discharge data for various streams (varying length and quality) were collected from various sources in the 13 hilly states for gauged small streams. Discharge data of only 102 catchments could be collected. Based on gauged stream date, flow duration estimates have been prepared for ungauged streams. 2.3.4 Hydro Power Potential For each catchment, hydropower potential has been computed. These are on 50%,75% and 90% dependability of discharge and are given in Annexure for each state. 2.3.5 Application of geographic information system for potential small hydro sites,
earthquake epicentre plotting and clusters identification (vol 2) Generally, it is understood that the initial development of small hydro by private investors will not start at isolated locations. Instead, a more rapid development can take place if many potential sites, located near each other are developed in a cluster. In order to have such information about potential small hydro sites having cluster characteristics, Geographic Information System (GIS) was used. 2.3.6 Methodology 1. As mentioned above all potential sites were identified using Survey of India (SOI)
topographical maps of 1:50,000 scale. After recording various information and preparation of drawings of all identified sites, all attribute data of each site were entered in spreadsheet program (Lotus 1-2-3). Later on, the location co-ordinates (i.e. latitude and longitude in decimal degree) were used in plotting using ILWIS GIS (ILWIS ver. 1.41, developed by ITC, The Netherlands) as described below:
a. Using ILWIS, information about State and District boundaries, Rivers (all blue lines
or perennial channels as shown in SOI maps of 1:1,000,000) Road and Railway networks (if present in the state) and location of major cities of all thirteen states were digitized using Graphtec KD 4610 digitizer.
b. Using the above digitized files (segments and point files) of all states; identified
potential sites were plotted again using ILWIS.
c. All thirteen states' plots were converted into segment files (DXF format) and then imported to AutoCAD (Release 12 for Windows) to make necessary and uniform colour coding.
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India 11
d. After getting every state file in the same colour scheme (i.e. river in blue, road in red etc.) these DXF format files were imported in Corel Draw (ver 5.0) for annotation and printing purposes, because neither ILWIS nor AutoCAd supports good choice and control over annotation and printing.
e. At every step, efforts were made to keep a check on accuracy in order to control
error propagation.
f. Same procedure was also adopted for earthquake epicentre location (available from USGS) plotting using above described procedure. A sorting procedure was adopted on earthquake epicentre data in order to annotate only those sites, which had magnitude of more then 7.0. One extra plotting was performed on these earthquake epicentre location map, i.e. the boundaries of Seismic Zoning Map of India of different states were also plotted.
g. A third set of plots of all thirteen states was also prepared (a combined map of
identified potential sites + earthquake epicentre locations). It is important to note that the basic information about potential catchments was gathered from SOI 1:50,000 toposheets. However, for their location plotting and cluster identification SOI 1:1,000,000 maps were digitized and used as a base map for further analysis, and earthquake epicentre and geological maps preparation. The major advantages of having all information in digital format and in GIS spatial database is that these maps can be printed on desired scale depending on output devices. To have overall control of scale and related information, a scale bar has been provided on all coloured drawings. For only presentation purposes, all these colour drawings (including potential small hydro sites, earthquake epicentre, geological information and vegetation cover maps) were printed on A-4 size sheets. However, the basic information was available at 1:1,000,000 in the digital format. 2.4 PREPARATION OF STATE GEOLOGICAL MAPS (VOL 2) Geological maps of all thirteen Himalayan states were prepared on SOI (1:1,000,000) map using information available from published maps of Geological Survey of India (Calcutta), Geological Society of India (Bangalore) and literature. All geological and structural boundaries were digitized using Corel Draw 5.0 Software and colour coded to have better interpretability. 2.5 PREPARATION OF VEGETATION COVER MAPS (VOL 2) Forest cover maps of all thirteen states were acquired from Forest Survey of India (FSI), Dehradun. FSI has generated these forest cover maps using remote sensing data (mainly geocoded False Colour Composites) of 1993-95. All the supplied maps from FSI were then digitised and later used for further plotting using identified potential sites. Further, the forest/vegetation cover information has been compiled as detailed below (based on FSI 1995 assessment) (table 1.2): 1. Geographic area, recorded forest cover and actual forest cover of various states (in
Sq km). 2. Reserved/protected/unclassified Forest Area (in sq km). 3. District wise Forest Cover (in sq km) 4. Comparative Forest Cover (1989-1995 Assessment). 5. Recorded Forest Cover (1987)
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India 12
Table 2.2: Geographical area, recorded forest cover and actual forest cover of various states (in sq km) (source: The State of Forest Report : 1995 - Forest survey of India, Dehradun).
S. No.
States/UTs Geog. Area
Recorded forest area
% of Reco. forest to Geog. area
Actual Forest
% of Actual forest to Geog. area
% of Actual to Recorded forest area
1. Arunachal Pradesh
83621 51540 61.64 68621 81.9 133.14
2 Assam 78438 30708 39.15 24061 30.7 78.35
3 Bihar 173877 29226 16.81 26561 15.3 90.88
4 Himachal Pradesh
55673 35407 63.69 12501 22.4 35.31
5. Jammu & Kashmir
222235 20182 9.08 20433 9.2 101.24
6. Manipur 22327 15154 67.87 17558 78.6 115.86
7 Meghalaya 22429 9496 42.34 15714 70.1 165.48
8 Mizoram 21081 15935 75.59 18576 88.1 116.57
9 Nagaland 16579 8629 52.04 14291 86.2 165.62
10 Sikkim 7096 2650 37.34 3127 44.1 118.00
11 Tripura 10486 6292 60.01 5538 52.8 88.00
12 Uttar Pradesh 294411 51663 17.54 33986 11.5 65.78
13 West Bengal 88752 11879 13.38 8276 9.3 69.67
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India 13
SMALL HYDRO POWER POTENTIAL SECTION 3 3.1 Under the present study a total of 2162 sites have been identified in the thirteen
Himalayan states. The total potential estimated for these sites is 3827 MW. In north states (J&K, H.P., U.P. and Bihar) total 1158 SHP sites have been identified, which have a potential of 1834 MW. In north eastern states total 1004 SHP sites have been identified and the potential is 1992 MW. Table 3.1 represents the state wise status of SHP potential.
Table 3.1 State wise status of Small Hydro Power Sites.
S.NO. STATE NO. OF SITES POWER POTENTIAL (kW)
75% Dependability
NORTH
1 Jammu & Kashmir 261 749397
2 Himachal Pradesh 458 763988
3 Uttar Pradesh 404 315473
4 Bihar 35 6036
TOTAL 1158 1834894
NORTH EAST
1 Arunachal Pradesh 549 1778151
2 Assam 72 23864
3 Manipur 81 43618
4 Meghalaya 64 34432
5 Mizoram 52 9642
6 Nagaland 69 27053
7 Sikkim 61 58076
8 Tripura 9 161
9 West Bengal 47 17234
TOTAL 1004 1992231
G. TOTAL 2162 3827125
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India 14
Table 3.2 presents the state wise number of sites with respect to priority of works.
The potential SHP sites identified have been categorised as per following priorities.
Priority 1. Habitat, Accessible 2. Habitat, Poor Accessibility 3. Habitat, Extremely Difficult Accessibility
4. No Habitat, No Accessibility 5. Details are not available
Table 3.2 State wise number of sites with respect to priority
S.No STATE Priority of Sites Total
1 2 3 4 5
North
1 Jammu & Kashmir
134 16 6 105 261
2 Himachal Pradesh
336 16 18 88 458
3 Uttar Pradesh 207 15 7 21 154 404
4 Bihar 31 4 35
Total 708 15 39 45 351 1158
North East
1 Arunachal Pradesh
118 31 82 63 255 549
2 Assam 38 24 7 3 72
3 Manipur 44 2 24 4 7 81
4 Meghalaya 34 1 6 23 64
5 Mizoram 4 1 1 26 20 52
6 Nagaland 14 16 11 7 21 69
7 Sikkim 35 1 1 24 61
8 Tripura 6 3 9
9 West Bengal 38 9 47
Total 331 51 149 108 365 1004
G.Total 1039 66 188 153 716 2162
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India 15
Table 3.3 shows the district wise SHP potential in different Himalayan states.
Table 3.3 : District wise SHP Potential in Different Himalayan States Jammu & Kashmir
S.No. District No. of Sites Potential (kW)
1. Anantnag 41 88131
2. Baramula 11 25907
3. Kathua 13 16939
4. Ladakh 84 336197
5. Mirpur 1 275
6. Muzaffarabad 7 26410
7. Punch 9 9790
8. Riasi 5 11141
9. Udhampur 90 234607
Total 261 749397
Himachal Pradesh
S.No. District No. of Sites Potential (kW)
1. Chamba 128 233973
2. Kangra 26 38013
3. Kinnaur 55 130559
4. Kullu 72 98536
5. Lahul Spiti 78 149173
6. Mandi 22 20064
7. Shimla 69 83181
8. Sirmour 8 10489
Total 458 763988
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India 16
Uttaranchal
S.No. District No. of Sites Potential (kW)
1. Almora 58 34723
2. Chamoli 111 17895
3. Dehradun 12 4501
4. Garhwal 26 11113
5. Nainital 10 4986
6. Pithoragarh 46 35437
7. Tehri Garhwal 64 42341
8. Uttarkashi 77 64474
Total 404 315473
Jharkhand
S.No. District No. of Sites Potential (kW)
1. Dhanbad 2 88.99
2. Giridh 3 177.30
3. Hazaribagh 4 257.70
4. Palamu 4 470.70
5. Ranchi 11 2944.62
6. Singhbhum 11 2096.35
Total 35 6036
Arunachal Pradesh
S.No. District No. of Sites Potential (kW) 75%
1. Changlang 8 14390
2. Dibang 43 153339
3. E. Kameng 59 212914
4. E. Siang 54 168789
5. Lohit 58 226502
6. L. Subansiri 129 356437
7. Tawang 5 33417
8. Tirap 14 31542
9. U. Subansiri 46 166006
10. W. Kameng 84 271919
11. W. Siang 49 144567
Total 549 1778151
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India 17
Assam S.No. District No. of Sites Potential (kW)
1. Chachar 2 2535
2. Darrang 1 101
3. Dibrugarh 4 1081
4. Garo Hills 1 121
5. Kamrup 1 238
6. Karbi Anglong 30 8126
7. Mikir Hills 1 321
8. Nowgaon 6 1765
9. NC Hills 22 9322
10. Sibsagar 1 18
11. Somitpur 3 236
Total 72 23864
Manipur
S.No. District No. of Sites Potential (kW)
1. Chandel 11 3369
2. Churachandpur 14 6653
3. Imphal 1 147
4. Lamenglong 1 259
5. Senapati 13 3227
6. Tamenglong 19 5488
7. Ukhrul 22 25302
Total 81 43618
Meghalaya
S.No. District No. of Sites Potential (kW)
1. E. Garo hills 1 534
2. E. Khasi hills 22 16557
3. Jantia hills 3 1966
4. Ribhoi 1 245
5. W. Garo hills 18 4063
6. W. Khasi hills 19 11067
Total 64 34432
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India 18
Mizoram
S.No. District No. of Sites Potential (kW)
1. Aizwal 34 5158
2. Chhimtuipui 8 2707
3. Lunglei 10 1777
Total 52 9642
Nagaland
S.No. District No. of Sites Potential (kW)
1. Khomia 20 14377
2. Mokokchong 10 1497
3. Mon 6 567
4. Phek 12 7289
5. Tuesang 12 2569
6. Wokha 3 342
7. Zunhebrto 6 412
Total 69 27053
Sikkim
S.No. District No. of Sites Potential (kW)
1. East 12 5127
2. North 20 38997
3. North South 2 529
4. South 20 6449
5. West 7 6973
Total 61 58076
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India 19
Tripura S.No. District No. of Sites Potential (kW)
1. N. Tripura 1 8.18
2. W. Tripura 6 95.17
3. S. Tripura 2 57.34
Total 9 161
West Bengal
S.No. District No. of Sites Potential (kW)
1. Darjiling 47 17234
Total 47 17234
Table 3.4 to Table 3.6 shows the region wise number of sites with respect to installed capacity and head range. Table 3.4 : Number of Sites in North region with respect to Installed Capacity
and Head Range
Capacity kW No. of Sites Identified
Head Range (m)
< 30 31-50 51-100 101-300 > 300
NO. OF SITES
0-50 9 9
51-100 16 14 2
101-500 248 36 92 77 43
501-1000 281 2 81 67 120 11
1001-3000 442 23 107 261 51
above 3000 162 1 14 110 37
Total 1158 61 199 265 534 99
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India 20
Table 3.5 Number of Sites in North Eastern region with respect to Installed Capacity and Head Range
Capacity kW No. of Sites Identified
Head Range (m)
< 30 31-50 51-100 101-300 > 300
NO. OF SITES
0-50 66 57 5 4
51-100 92 46 26 19 1
101-500 188 73 32 50 28 5
501-1000 80 1 23 25 30 1
1001-3000 299 17 115 156 11
above 3000 279 9 62 172 36
Total 1004 177 112 275 387 53
Table 3.6 Number of Sites (Total) with respect to Installed Capacity and Head
Range
Capacity kW No. of Sites Identified
Head Range (m)
< 30 31-50 51-100 101-300 > 300
NO. OF SITES
0-50 75 66 5 4
51-100 108 60 28 19 1
101-500 436 109 124 127 71 5
501-1000 361 3 104 92 150 12
1001-3000 741 40 222 417 62
above 3000 441 10 76 282 73
Total 2162 238 311 540 921 152
Table 3.7 shows the state wise number of sites with respect to installed capacity and head range.
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India 21
Table 3.7 Number of Sites with respect to Installed Capacity and Head Range in Himalayan States
Jammu & Kashmir Capacity kW No. of Sites
Identified Head Range (m)
< 30 31-50 51-100 101-300 > 300
NO. OF SITES
0-50 0
51-100 0
101-500 4 4
501-1000 32 1 15 9 7
1001-3000 129 1 48 78 2
above 3000 96 1 5 67 23
Total 261 5 17 62 152 25
Himachal Pradesh
Capacity kW No. of Sites Identified
Head Range (m)
< 30 31-50 51-100 101-300 > 300
NO. OF SITES
0-50
51-100
101-500 45 6 18 12 9
501-1000 131 1 36 24 66 4
1001-3000 227 19 33 133 42
above 3000 55 5 38 12
Total 458 7 73 74 246 58
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India 22
Uttar Pradesh Capacity kW No. of Sites
Identified Head Range (m)
< 30 31-50 51-100 101-300 > 300
NO. OF SITES
0-50 -- -- -- -- -- --
51-100 5 3 2 -- -- --
101-500 186 15 73 64 34 --
501-1000 117 -- 30 33 47 7
1001-3000 85 -- 3 25 50 7
Above 3000 11 -- -- 4 5 2
Total 404 18 108 126 136 16
Bihar
Capacity kW No. of Sites Identified
Head Range (m)
< 30 31-50 51-100 101-300 > 300
NO. OF SITES
0-50 9 9
51-100 11 11
101-500 13 11 1 1
501-1000 1 1
1001-3000 1 1
above 3000
Total 35 31 1 3
Arunachal Pradesh
Capacity kW No. of Sites Identified
Head Range (m)
< 30 31-50 51-100 101-300 > 300
NO. OF SITES
0-50
51-100
101-500 7 7
501-1000 25 2 20 2 1
1001-3000 250 16 104 130
above 3000 267 8 57 168 34
Total 549 9 44 163 299 34
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India 23
Assam Capacity kW No. of Sites
Identified Head Range (m)
< 30 31-50 51-100 101-300 > 300
NO. OF SITES
0-50 24 24
51-100 23 19 4
101-500 22 8 7 6 1
501-1000 3 2 1
1001-3000
above 3000
Total 72 51 11 8 2
Manipur
Capacity kW No. of Sites Identified
Head Range (m)
< 30 31-50 51-100 101-300 > 300
NO. OF SITES
0-50 9 6 3
51-100 16 9 4 3
101-500 41 19 7 13 2
501-1000 8 1 1 4 2
1001-3000 3 1 2
Above 3000 4 3 1
Total 81 35 15 24 7
Meghalaya
Capacity kW No. of Sites Identified
Head Range (m)
< 30 31-50 51-100 101-300 > 300
NO. OF SITES
0-50
51-100 1 1
101-500 31 22 8 1
501-1000 20 7 6 7
1001-3000 12 2 3 7
above 3000
Total 64 23 9 17 15
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India 24
Mizoram Capacity kW No. of Sites
Identified Head Range (m)
< 30 31-50 51-100 101-300 > 300
NO. OF SITES
0-50 14 10 1 3
51-100 16 7 2 7
101-500 18 8 1 5 4
501-1000 2 1 1
1001-3000 2 1 1
above 3000
Total 52 26 4 17 5
Nagaland
Capacity kW No. of Sites Identified
Head Range (m)
< 30 31-50 51-100 101-300 > 300
NO. OF SITES
0-50 6 4 1 1
51-100 21 5 11 5
101-500 29 11 9 5 4
501-1000 6 4 2
1001-3000 5 1 3 1
above 3000 2 1 1
Total 69 20 22 19 8
Sikkim
Capacity kW No. of Sites Identified
Head Range (m)
< 30 31-50 51-100 101-300 > 300
NO. OF SITES
0-50 1 1
51-100 3 1 1 1
101-500 29 2 7 20
501-1000 11 1 9 1
1001-3000 14 5 9
above 3000 3 1 2
Total 61 4 9 35 13
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India 25
Tripura
Capacity kW No. of Sites Identified
Head Range (m)
< 30 31-50 51-100 101-300 > 300
NO. OF SITES
0-50 9 9
51-100
101-500
501-1000
1001-3000
Above 3000
Total 9 9
West Bengal
Capacity kW No. of Sites Identified
Head Range (m)
< 30 31-50 51-100 101-300 > 300
NO. OF SITES
0-50
51-100 7 4 3
101-500 32 2 14 12 4
501-1000 5 2 2 1
1001-3000 3 2 1
above 3000
Total 47 6 19 16 6
Table 3.32 to 3.44 shows the state wise details of SHP sites in 13 Himalayan states.
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
1
Table 3.8 : Details of SHP Sites Identified in Jammu & Kashmir
S.No. STATE
DISTRICT CATCHMENT RTS
STM
BSN
A SqKm
L Km
P Km
Zh m
Zl m
LAT LON FED HEAD Dependable Discharge Power
75% 50% 75% 50%
1 J&K ANANTNAG 43K/14 KANDAI KOL KANDAI KOL 29.4 2.4 26.2 3756 74 56 33 36.5 RAIN FED 40 1.88 3.08 564 925
2 J&K ANANTNAG ARMIUN NAR 43N/8 46.6 11 32.3 5116 2360 75 16 34 5.5 SNOW FED 200 1.93 3.17 2898 4758
3 J&K ANANTNAG ARU W.LIDDAR 75 05 34 06 120 2.72 4.38 2448 3941
4 J&K ANANTNAG ASTAR NAR 43J/11,15 ERIN NAR 77.9 10.5 42.4 4518 74 45 34 24 S,R FED 200 1.99 3.27 2990 4908
5 J&K ANANTNAG BAJANAI N 43O/5 41.4 9.8 26.8 4446 75 23 33 47.5 S,R FED 160 1.92 3.15 2302 3779
6 J&K ANANTNAG BONNIYAR II HAPT KHAI 74 12 43 23 70 1.78 2.87 935 1505
7 J&K ANANTNAG BONNIYAR III HAPT KHAI 74 11 43 02 70 1.86 2.99 977 1572
8 J&K ANANTNAG BRAHAMSARI NAR 43J/15 46.7 11.4 30.4 5148 74 18 34 52.5 S,R FED 280 1.93 3.17 4058 6662
9 J&K ANANTNAG BRING BRING 75 21 33 34 120 2.30 3.70 2070 3333
10 J&K ANANTNAG CHANDANWARI LIDDAR 75 20 34 05 440 0.68 1.09 2244 3613
11 J&K ANANTNAG CHHITRAR NAR 43J/15 ERIN NAR 56.8 8.6 32.3 5148 74 47.5 34 26 S,R FED 240 1.96 3.21 3520 5778
12 J&K ANANTNAG DARA N 43J/16 30 9.5 25.8 3757 74 55 34 11 RAIN FED 300 1.88 3.09 4233 6949
13 J&K ANANTNAG DATIWAS ERIN N. 75 45 34 27 420 1.23 1.98 3875 6238
14 J&K ANANTNAG DHANDAPWARI W.LIDDAR 75 13 34 10 240 0.84 1.35 1512 2434
15 J&K ANANTNAG ERIN ERIN N. 75 48 34 25 260 0.82 1.32 1599 2574
16 J&K ANANTNAG HAPAT NAR 43O/5 MARTAND C 58.5 10.1 31.3 4268 75 17.5 33 48.5 RAIN FED 120 1.96 3.22 1763 2894
17 J&K ANANTNAG HARWAT NALA 43N/8 EAST LADDER EAST LADDER
56.1 11.3 33.1 4793 2800 75 25 34 4.75 SNOW FED 160 1.95 3.21 2345 3849
18 J&K ANANTNAG KALAI NAR 43O/2,6 BRING R 20.6 4.4 18.4 2885 75 20.9 33 34 RAIN FED 140 1.84 3.02 1931 3170
19 J&K ANANTNAG KALWAN W.LIDDAR 75 15 34 06 80 2.60 4.19 1560 2512
20 J&K ANANTNAG LASHPATRI I NACHANI 75 14 34 20 120 0.82 1.32 738 1188
21 J&K ANANTNAG LASHPATRI II NACHANI 75 15 34 20 115 0.83 1.34 716 1153
22 J&K ANANTNAG LASHPATRI III NACHANI 75 16 34 19 155 1.03 1.66 1197 1928
23 J&K ANANTNAG LIDRU LIDDAR 75 10 34 03 171 3.60 5.80 4617 7433
24 J&K ANANTNAG MAINPAL NALA 43N/8 EAST LADDER EAST LADDER
25.8 9 25 4910 2250 75 20.5 34 2.5 SNOW FED 280 1.86 3.06 3915 6427
25 J&K ANANTNAG MUNDRI MUNDRI 74 18 34 08 100 0.89 1.43 668 1075
26 J&K ANANTNAG MUNWARSAR NALA 43N/4&N/8 WEST LADDER WEST LADDER
14.6 6.1 18.4 4233 2270 75 17.5 34 3.5 SNOW FED 280 1.80 2.96 3783 6209
27 J&K ANANTNAG NILAGARAR 43N/7 SIND R SIND R 41.4 11.9 31.5 5235 2725 75 20 34 17.5 SNOW FED 200 1.92 3.15 2878 4724
28 J&K ANANTNAG NUSE NAR 43O/2,3 KANDAL KOL 42.7 7.6 28.1 3909 75 1 33 32.5 RAIN FED 40 1.92 3.16 577 947
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
2
S.No. STATE
DISTRICT CATCHMENT RTS
STM
BSN
A SqKm
L Km
P Km
Zh m
Zl m
LAT LON FED HEAD Dependable Discharge Power
75% 50% 75% 50%
29 J&K ANANTNAG PASHAT NAR 43N/3&N/4 SIND R SIND R 17.6 8.6 20.2 4695 2180 75 9 34 16 SNOW FED 200 1.82 2.99 2733 4486
30 J&K ANANTNAG RAMAN RAMAN 75 10 34 23 80 1.75 2.82 1050 1691
31 J&K ANANTNAG RANGWAR RANGWAR 75 56 34 18 240 0.41 0.66 738 1188
32 J&K ANANTNAG REMBIARA REMBIARA 74 40 33 40 180 1.20 1.93 1620 2608
33 J&K ANANTNAG SALANAI SALANAI 75 51 34 30 235 0.40 0.64 705 1135
34 J&K ANANTNAG SAREWALA SAREWALA 74 34 34 47 160 2.19 3.53 2628 4231
35 J&K ANANTNAG SHISHARARA NAG LIDDAR 75 15 34 10 740 0.20 0.32 1110 1787
36 J&K ANANTNAG SON GRAR 43N/3&N/4 SIND R SIND R 12.6 7.9 18.4 4767 2380 75 12.5 34 17.5 SNOW FED 400 1.79 2.93 5356 8792
37 J&K ANANTNAG SONAMARG NAR 43N/7 SIND R SIND R 20.9 8.3 19.6 4764 2680 75 18 34 18 SNOW FED 280 1.84 3.02 3866 6345
38 J&K ANANTNAG SURA PHARAN NACHANI 75 43 34 18 168 0.71 1.14 895 1440
39 J&K ANANTNAG VISHAU VAISHAV 74 44 33 35 95 1.10 1.77 784 1262
40 J&K ANANTNAG YANGA REMBIARA 74 35 33 37 140 0.80 1.29 840 1352
41 J&K ANANTNAG -- 43N/4 SIND R SIND R 46.1 10.9 29.2 4608 2040 75 2.5 34 13.5 SNOW FED 200 1.93 3.17 2896 4755
42 J&K BARAMULA BADOGAM NAR 43N/2 KISHANGANGA KISHANGANGA
56.4 17.9 39.2 4712 2639 75 3.5 34 33 SNOW FED 80 1.95 3.21 1173 1925
43 J&K BARAMULA BO-NAR 43J/10,11 MADMATTI 78.9 16.2 40.7 3881 74 39 34 28.5 S,R FED 80 1.99 3.27 1197 1965
44 J&K BARAMULA GISHAT NAR 43J/10 KISHAN GANGA R
26.6 8.7 24 4024 74 40.5 34 40 S,R FED 200 1.87 3.07 2802 4599
45 J&K BARAMULA GORAI N 43J/10 KISHAN GANGA R
95.76 15.2 42.4 4003 74 42 34 38 S,R FED 80 2.02 3.31 1211 1988
46 J&K BARAMULA GUND NAR 43N/3 SIND R SIND R 20 7.2 20.7 4558 2100 75 5.5 34 15.5 RAIN FED 240 1.84 3.01 3305 5425
47 J&K BARAMULA KHAPURI NALA 43J/14 KISHAN GANGA R
11.3 2.3 13.7 4444 74 47 34 39 S,R FED 240 1.77 2.91 3193 5240
48 J&K BARAMULA KISAR NALA 43J/14 KISHAN GANGA R
31.7 8.7 24.2 4209 74 49 34 38 S,R FED 320 1.89 3.10 4531 7437
49 J&K BARAMULA NARUAB NALA 43N/2 KISHANGANGA KISHANGANGA
58.1 16.1 36.2 4672 2772 75 10.5 34 32 SNOW FED 80 1.96 3.21 1175 1929
50 J&K BARAMULA NILNA N 43J/14 KISHAN GANGA R
57.6 9.6 39 4378 74 55 34 36.5 S,R FED 200 1.96 3.21 2936 4819
51 J&K BARAMULA RAMAN N. 43 N/3 RAMAN N. RAMAN N. 83 14.7 43.1 4781 3100 75-10-00 34-27-15 GF 80 2.00 3.28 1201 1971
52 J&K BARAMULA SUKIAL GAH 43J/14 KISHAN GANGA R
10.9 3.3 12.4 4051 74 53 34 39 S,R FED 240 1.77 2.91 3186 5229
53 J&K KATHUA BALAK DA NAL 43P/13&P/14 SEWA R SEWA R 32.6 13.9 24.2 3240 2000 75 43 32 48 RAIN FED 40 1.89 3.10 567 931
54 J&K KATHUA BATOLUAN KHAD 43P/14 RAVI R RAVI R 17.8 9.5 19.6 1150 850 75 50.5 32 32 RAIN FED 40 1.82 2.99 547 898
55 J&K KATHUA BHINI R. 43 P/9,10 BHINI R. BHINI R. 130.3 17.2 50.3 2670 75-40-40 32-39-00 RF 60 2.06 3.38 925 1519
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
3
S.No. STATE
DISTRICT CATCHMENT RTS
STM
BSN
A SqKm
L Km
P Km
Zh m
Zl m
LAT LON FED HEAD Dependable Discharge Power
75% 50% 75% 50%
56 J&K KATHUA BIYALLI NALA 43 P/9,13 SEMA R. 123 10.6 46.2 3783 75 48 32 47 RAIN FED 160 2.05 3.36 2459 4036
57 J&K KATHUA DALE DA NAL 43P/14 RAVI R RAVI R 16.3 7.4 21.7 2290 538 75 52.5 32 34 RAIN FED 40 1.81 2.98 544 893
58 J&K KATHUA DEBI NALA 43P/9&P/10 BHINI R BHINI R 48.7 8.9 27.8 2670 1218 75 42.5 32 42.5 RAIN FED 100 1.94 3.18 1453 2385
59 J&K KATHUA DUNDA NALA 43P/9 UJH R UJH R 23.2 6.7 20.9 2820 75 47.5 32 36 RAIN FED 120 1.85 3.04 1667 2737
60 J&K KATHUA GHOR KHAD 43P/14 RAVI R RAVI R 8.7 7.3 17 2290 578 75 36.5 32 54 RAIN FED 80 1.75 2.87 1047 1719
61 J&K KATHUA NAINI KHAD 43P/14 RAVI R RAVI R 6.1 5.2 12.9 2127 753 72 55 32 38 RAIN FED 160 1.71 2.80 2050 3366
62 J&K KATHUA OAD NALA 43P/10 BHINI R BHINI R 8.2 4.2 13.7 2053 600 74 37.5 32 38 RAIN FED 140 1.74 2.86 1827 2998
63 J&K KATHUA PANJAB NALA 43P/10 BHINI R BHINI R 13.7 7.8 17.6 1276 1078 75 33.5 32 32.5 RAIN FED 20 1.79 2.95 269 442
64 J&K KATHUA SAL NALLAH 43 P/9 UJH R. 23.2 6.7 20.9 2820 75 47 32 36 RAIN FED 120 1.85 3.04 1667 2737
65 J&K KATHUA SICHAR NALA 43P/10 BHINI R BHINI R 18 4.5 18.5 2557 1067 75 41.5 32 41.5 RAIN FED 140 1.82 2.99 1915 3144
66 J&K LADAKH 52B/5&B/6 INDUS R INDUS R 41.9 6.2 26.8 4788 76 22 34 38 SNOW FED 200 2.79 4.00 4189 6001
67 J&K LADAKH ACHINA LUNGPA 52B/9,10,14 INDUS R INDUS R 64.9 12.4 35 5490 76 38 34 30.5 SNOW FED 40 2.86 4.10 859 1231
68 J&K LADAKH BOZGOH 52F/7,8 INDUS R INDUS R 106.00 23 55 5720 3084 77 2 34 13 S,G FED 120 2.95 4.22 2653 3800
69 J&K LADAKH BUKDANG 52F/1,B/13 SHYOK R SHYOK R 105.00 14 0 5718 2980 77 2 34 48 S,G FED 200 2.95 4.22 4419 6330
70 J&K LADAKH BYAKLUNG 52F/6 SHYOK R SHYOK R 36.75 9 24 6183 3080 77 25 34 39 S,G FED 280 2.77 3.97 5821 8338
71 J&K LADAKH CHANG CHENMO R. 52 J/7,11 CHANG CHENMO R.
SHYOK R. 253.01 17.2 64.3 6314 3800 78-20-00 34-17-00 GF 160 3.10 4.44 3720 5329
72 J&K LADAKH CHANGMAR 52F/1 SHYOK R SHYOK R 41.25 6 25 6038 2990 77 7 34 46 S,G FED 400 2.79 4.00 8371 11991
73 J&K LADAKH CHHANGMAR 52F/5,6 SHYOK R SHYOK R 49.25 12.5 34 6161 3125 77 21 34 41 S,G FED 200 2.82 4.04 4229 6057
74 J&K LADAKH CHILUNG 52C/1,5 RINGDOM RINGDOM 55.50 9 0 5840 4080 76 19 33 56 S,G FED 200 2.84 4.07 4258 6100
75 J&K LADAKH CHUMIK 52E/12,16 SHYOK R SHYOK R 19.25 6 20 6550 4620 77 48 35 3 S,G FED 160 2.67 3.82 3204 4589
76 J&K LADAKH CHUMTHANG 52F/6,7 INDUS R INDUS R 171.50 20 58 6534 4020 78 21 33 22 S,G FED 120 3.03 4.34 2728 3907
77 J&K LADAKH DENYAL 52C/10 DODA R DODA R 42.50 9 30 6135 3755 76 40 33 38 S,G FED 100 2.80 4.00 2096 3003
78 J&K LADAKH GAIK 52K/2 INDUS R INDUS R 43.50 10.5 26 6935 3790 77 9 33 33 S,G FED 360 2.80 4.01 7557 10825
79 J&K LADAKH GARKHUN 52B/5&B/6 INDUS R INDUS R 27.3 8.3 21.6 5103 2630 76 25.5 34 38 SNOW FED 160 2.72 3.90 3269 4683
80 J&K LADAKH GOMPE 52C/15 LUNGNAK R LUNGNAK R 26.25 8 21 6184 3614 76 54 33 28 S,G FED 100 2.72 3.89 2039 2920
81 J&K LADAKH GRAGRA BAR 52B/5&B/6 INDUS R INDUS R 40.2 7 29.1 5343 76 20.5 34 39.5 SNOW FED 240 2.79 3.99 5015 7184
82 J&K LADAKH GUNBE 52F/5,6 SHYOK R SHYOK R 45.25 12 27.5 5770 3120 77 19 34 41 S,G FED 120 2.81 4.02 2525 3617
83 J&K LADAKH HANDANG 52C/10 DODA R DODA R 32.75 7 27.5 6280 3760 76 36 33 41 S,G FED 100 2.75 3.94 2065 2958
84 J&K LADAKH IGU 52G/13 INDUS R INDUS R 123.50 20 50 5961 3390 77 46 33 54 S,G FED 80 2.97 4.26 1784 2556
85 J&K LADAKH KHANDI LUNGPA 52 B/4 KHANDI LUNGPA
PHU LUNGPA 47.5 9.3 32 5795 3825 76-04-30 34-14-00 GF 200 2.81 4.03 4220 6045
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
4
S.No. STATE
DISTRICT CATCHMENT RTS
STM
BSN
A SqKm
L Km
P Km
Zh m
Zl m
LAT LON FED HEAD Dependable Discharge Power
75% 50% 75% 50%
86 J&K LADAKH KHORMU 52F/2,6 SHYOK R SHYOK R 26.75 9 19 5713 3090 77 16 34 42 S,G FED 400 2.72 3.90 8163 11693
87 J&K LADAKH KINIMENT 52F/1 CHUCHIK CHUCHIK 13.50 3 16 6530 3640 77 11 34 51 S,G FED 360 2.62 3.75 7061 10114
88 J&K LADAKH KUKTSO LUNGPA 52B/3 SURU R SURU R 42.4 8.2 27.2 5562 2760 76 7 34 29.5 SNOW FED 200 2.79 4.00 4192 6005
89 J&K LADAKH KULUM 52G/13 INDUS R INDUS R 41.75 12 29 5417 3395 77 48 33 50 S,G FED 320 2.79 4.00 6702 9599
90 J&K LADAKH KUMDOK 52K/2,3,6 INDUS R INDUS R 161.50 27 0 6163 3795 78 9 33 31 S,G FED 400 3.02 4.33 4531 6490
91 J&K LADAKH KUNZANG LUNGPA 52J/3,7 KUNZANG LUNGPA
SHYOK R. 154 23.4 55.8 6285 3777 78-17-30 15-22-00 GF 200 3.01 4.31 4518 6472
92 J&K LADAKH KUSHAL 52C/10 DODA R DODA R 15.75 7.5 15 5625 3715 76 35 33 41 S,G FED 140 2.64 3.78 2771 3969
93 J&K LADAKH LAIDOH LUNGPA 52B/11 INDUS R INDUS R 36.9 8.6 26.4 5499 76 41 34 27 SNOW FED 80 2.77 3.97 1663 2383
94 J&K LADAKH LIKIR 52F/3,4,7 INDUS R INDUS R 75.50 20 40 5738 3090 77 10 34 14 S,G FED 20 2.89 4.14 2168 3105
95 J&K LADAKH LUMUR 52C/10 DODA R DODA R 16.25 7 15.5 5408 3770 76 36 33 41 S,G FED 100 2.64 3.79 1983 2840
96 J&K LADAKH MALAKSHE 52F/1 SHYOK R SHYOK R 60.75 7.5 37.5 6167 2985 77 2 34 48 S,G FED 200 2.85 4.09 4281 6132
97 J&K LADAKH MARKHA 52G/5 MARKHA R MARKHA R 24.00 9 24 5985 3785 77 25 33 53 S,G FED 200 2.70 3.87 4056 5810
98 J&K LADAKH MARTSELANG 52G/9 INDUS R INDUS R 185.00 20 44 5899 3337 77 45 33 55 S,G FED 40 3.04 4.36 913 1308
99 J&K LADAKH MUJ BAR 52B/5&B/6 INDUS R INDUS R 22.9 5.8 20.7 5373 76 16.5 34 41.5 SNOW FED 320 2.70 3.86 6472 9271
100 J&K LADAKH NIMU 52F/7,8 INDUS R INDUS R 74.50 19 45 5780 3150 77 20 34 11 S,G FED 200 2.89 4.14 4332 6205
101 J&K LADAKH NUNGMA 52G/14 INDUS R INDUS R 51.25 10 25.5 5995 3625 78 1 33 39 S,G FED 200 2.83 4.05 4239 6071
102 J&K LADAKH NYOMA 52K/11,12 INDUS R INDUS R 76.50 20 42 6195 4170 78 39 33 11 S,G FED 120 2.89 4.14 2603 3729
103 J&K LADAKH PHAKRU 52F/15 SHYOK R SHYOK R 37.50 40 0 5840 3420 77 56 34 19 S,G FED 40 2.77 3.97 832 1192
104 J&K LADAKH PHARKA 52F/11,12 SHYOK R SHYOK R 223.25 25 78 5921 3200 77 44 34 27 S,G FED 200 3.08 4.41 4617 6613
105 J&K LADAKH PHARLUNG 52K/3 INDUS R INDUS R 102.75 15 43.5 6335 3920 78 12 33 26 S,G FED 200 2.94 4.21 4413 6322
106 J&K LADAKH PHE 52C/10,14 DODA R DODA R 63.75 15 30 5798 3620 76 42 33 36 S,G FED 200 2.86 4.10 4293 6149
107 J&K LADAKH PHOCHE 52G/5 MARKHA R MARKHA R 35.00 10 29 6121 3640 77 23 33 55 S,G FED 160 2.76 3.96 3317 4751
108 J&K LADAKH PHUKPOCHHE 52F/9 SHYOK R SHYOK R 77.75 15 46 6152 3197 77 30 34 49 S,G FED 200 2.89 4.15 4342 6220
109 J&K LADAKH PUNAMIK 52F/9 NUBRA R NUBRA R 35.50 12 32.5 6195 3200 77 32 34 47 S,G FED 400 2.77 3.96 8299 11887
110 J&K LADAKH PURCHHUNG N. 52 K/6 PURCHHUNG N. PURYOK TOKPO
31.9 9.5 23.9 6170 78-21-40 33-42-10 GF 160 2.75 3.94 3299 4725
111 J&K LADAKH RANG LUNGPA 52B/11 SANGELONGMA SANGELONGMA
41.9 9.5 27.2 5250 76 34 34 21 SNOW FED 40 2.79 4.00 838 1200
112 J&K LADAKH RAZAM 52C/15 DODA R DODA R 14.50 5 19 6157 3545 76 52 33 30 S,G FED 200 2.63 3.76 3939 5642
113 J&K LADAKH RIBIL PHU 52 K/4,8 RIBIL PHU RALDONG N. 272.73 14.6 73.6 6185 4400 78-22-00 33-14-00 GF 200 3.11 4.46 4671 6690
114 J&K LADAKH SABU 52F/12 INDUS R INDUS R 72.50 18 42 5780 3215 77 35 34 6 S,G FED 120 2.88 4.13 2595 3717
115 J&K LADAKH SACHI 52C/9,10 DODA R DODA R 43.75 10 26.5 5802 3730 76 33 33 43 S,G FED 100 2.80 4.01 2520 3610
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
5
S.No. STATE
DISTRICT CATCHMENT RTS
STM
BSN
A SqKm
L Km
P Km
Zh m
Zl m
LAT LON FED HEAD Dependable Discharge Power
75% 50% 75% 50%
116 J&K LADAKH SAMBRA NALA 52B/11 SANGELONGMA SANGELONGMA
19 4.4 19.1 5256 76 31 34 25.5 SNOW FED 120 2.67 3.82 2401 3439
117 J&K LADAKH SARAN LUNGPA 52B/15 INDUS R INDUS R 52.8 14.7 35 5738 76 53 34 19 SNOW FED 120 2.83 4.05 2548 3649
118 J&K LADAKH SARCHE 52B/5&B/6 INDUS R INDUS R 20.8 6 18.8 4328 76 19 34 40.2 SNOW FED 240 2.68 3.84 4827 6914
119 J&K LADAKH SASPOL 52F/3,4,7 INDUS R INDUS R 80.00 20 52 5795 3090 77 10 34 15 S,G FED 80 2.90 4.15 6089 8723
120 J&K LADAKH SATI 52F/11,14,15 SHYOK R SHYOK R 110.75 17 46 6639 3190 77 44 34 29 S,G FED 280 2.96 4.23 4433 6349
121 J&K LADAKH SHALA 52F/11,15 SHYOK R SHYOK R 62.50 13 35 5921 3270 77 45 34 22 S,G FED 200 2.86 4.09 4288 6142
122 J&K LADAKH SHAMLUNG 52F/6 SHYOK R SHYOK R 23.75 9 20 6019 3061 77 21 34 40 S,G FED 400 2.70 3.87 8107 11613
123 J&K LADAKH SHOMA 52J/3,F/15 SHYOK R SHYOK R 96.00 37 0 6250 3490 78 1 34 19 S,G FED 100 2.93 4.20 2198 3148
124 J&K LADAKH SHUBUK 52J/3 SHYOK R SHYOK R 40.50 10 0 6265 3540 78 5 34 17 S,G FED 400 2.79 3.99 8362 11978
125 J&K LADAKH SHYOK R. 52 J/4,F/16 SHYOK R. SHYOK R. 286.6 27.3 64.5 6085 3765 78-06-00 34-08-05 GF 80 3.12 4.47 1874 2684
126 J&K LADAKH SILMA LUNGPA 52B/5&B/6 INDUS R INDUS R 56.6 12.5 35.2 4687 76 20.5 34 39.5 SNOW FED 360 2.84 4.07 7674 10992
127 J&K LADAKH SPANGTING 52F/4 INDUS R INDUS R 28.75 10 22.5 5653 3060 77 7 34 14 S,G FED 280 2.73 3.91 5738 8220
128 J&K LADAKH STARGA 52E/1,2,5 SHYOK R SHYOK R 6.25 7.5 18.5 5857 3010 77 11 34 44 S,G FED 100 2.50 3.58 1876 2687
129 J&K LADAKH STHALUNG 52K/11,12 INDUS R INDUS R 129.75 25 55 6175 4185 78 35 33 13 S,G FED 80 2.98 4.27 1789 2563
130 J&K LADAKH SUMDO 52F/2 SHYOK R SHYOK R 12.50 6 14 5495 2980 77 12 34 44 S,G FED 380 2.60 3.73 7420 10629
131 J&K LADAKH SUMMER RONG 52F/5,6 SHYOK R SHYOK R 27.00 9 21 5830 3125 77 25 34 40 S,G FED 360 2.72 3.90 7351 10530
132 J&K LADAKH SUNHR 52F/1,5 CHUCHIK CHUCHIK 26.50 8 20 5890 3200 77 10 34 49 S,G FED 400 2.72 3.90 8159 11687
133 J&K LADAKH TARANG LUNGPA 43 N/16,52 B/4 TARANG LUNGPA
SUDMO LUNGPA
42.6 12 28 5460 74-58-15 34-13-00 GF 200 2.80 4.00 4193 6007
134 J&K LADAKH TARANG LUNGPA 52 B/4 TARANG LUNGPA
TARANG LUNGPA
22.9 5.7 18.4 5452 76-00-00 34-12-00 GF 280 2.70 3.86 5663 8112
135 J&K LADAKH TARCHIT 52G/14 INDUS R INDUS R 43.75 10.5 22 5983 3570 77 58 33 43 S,G FED 200 2.80 4.01 4200 6016
136 J&K LADAKH TECHA 52C/14 DODA R DODA R 18.50 9 17 5757 3550 76 52 33 31 S,G FED 120 2.66 3.82 2397 3434
137 J&K LADAKH TSIGAR 52F/3,4 INDUS R INDUS R 74.00 11 31 5794 3010 77 5 34 15 S,G FED 120 2.89 4.13 2598 3721
138 J&K LADAKH TUGLA N. 52 G/13,14,K/1,2 TUGLA N. INDUS R. 230.9 25.1 62.3 6060 3531 77-58-15 33-43-45 GF 120 3.08 4.42 2775 3975
139 J&K LADAKH TUMEL LUNGPA 52B/2,5,6 SHINGO R SHINGO R 84 9.6 37 5373 2760 76 9 34 33 SNOW FED 80 2.91 4.17 1745 2499
140 J&K LADAKH TUNGRI 52C/14 DODA R DODA R 62.00 16 36 5813 3570 76 47 33 31 S,G FED 120 2.86 4.09 2571 3683
141 J&K LADAKH UDMEBRAK 52F/5,6 SHYOK R SHYOK R 63.00 12.5 39.5 6140 3065 77 16 34 42 S,G FED 400 2.86 4.10 8579 12289
142 J&K LADAKH URBIS LUNGPA 52B/11 INDUS R INDUS R 26.4 9.3 22.2 5499 76 44.8 34 25.2 SNOW FED 40 2.72 3.89 816 1168
143 J&K LADAKH WAKHA RONG 52 B/6,7,10,12 WAKHA RONG NAKHA RONG
308.3 26.4 78.9 5600 3708 76-25-40 34-21-30 GF 100 3.14 4.49 2352 3369
144 J&K LADAKH WARISH 52E/4,F/1,A/16 CHUCHIK CHUCHIK 119.50 12 0 6086 3225 77 10 34 50 S,G FED 240 2.97 4.25 5343 7653
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
6
S.No. STATE
DISTRICT CATCHMENT RTS
STM
BSN
A SqKm
L Km
P Km
Zh m
Zl m
LAT LON FED HEAD Dependable Discharge Power
75% 50% 75% 50%
145 J&K LADAKH WARSHI 52 E/8 NUBRA R. WARSHI 102.3 7.5 50.5 6186 3420 77 20 35 40 S,G FED 200 2.03 3.33 3039 4989
146 J&K LADAKH YUQMAL LUNGPA 52B/7&B/11 SANGELONGMA CHU
SANGELONGMA CHU
33.1 7.7 24.5 5226 76 34 34 21 SNOW FED 80 2.75 3.95 1653 2368
147 J&K LEH KYARO 52 G/13 KYARO INDUS 107.3 14.1 46.6 5860 77-48-50 33-54-00 GF 160 2.95 4.23 3540 5070
148 J&K LEH RAMCHUNG N. 52 F/8 RAMCHUNG INDUS 37.1 8.2 25.2 5367 3222 77-24-50 34-07-00 GF 160 2.77 3.97 3328 4767
149 J&K LEH WAKHA RONG 52 B/8 WAKHA RONG WAKHA RONG
90.2 12.7 39.9 5600 3890 76-27-50 34-14-30 GF 120 2.92 4.18 2628 3764
150 J&K MIRPUR SIALA KAS 43K/3 BAHABAN R BAHABAN R 19.9 5.2 19 1655 74 3.5 33 18 RAIN FED 20 1.84 3.01 275 452
151 J&K MUZAFFARABAD 43J/4 JHELUM R 12.6 4.5 15.9 3093 74 11.5 34 14.5 S,R FED 440 1.79 2.93 5892 9671
152 J&K MUZAFFARABAD BOSLAN N 43J/8 JHELUM R 11.7 4.9 14.2 2578 74 17.5 34 12 RAIN FED 400 1.78 2.92 5332 8752
153 J&K MUZAFFARABAD KHUNJRI N 43J/4 URI N URI N 27.7 5.46 20.4 3528 74 4 34 4 S,R FED 240 1.87 3.07 3370 5532
154 J&K MUZAFFARABAD LIMBAR N 43J/4 JHELUM R 39.5 9.7 26.1 4095 74 9.5 34 10.5 S,R FED 80 1.91 3.14 1148 1884
155 J&K MUZAFFARABAD MALANGAN N 43J/4 JHELUM R 94.7 14.4 40.6 4398 74 7 34 8 S,R FED 280 2.02 3.31 4235 6952
156 J&K MUZAFFARABAD NARIL N 43J/5 KISHAN GANGA R
56.1 10.9 34.1 5169 74 22 34 50 S,R FED 240 1.95 3.21 3517 5774
157 J&K MUZAFFARABAD VIJI NAR 43J/10,11 MADMATTI 51.4 9.1 33.1 3893 74 42 34 29.5 RAIN FED 200 1.94 3.19 2916 4786
158 J&K PUNCH DHARA NA KAS 43K/2 MENDHAR R MENDHAR R 43.7 7.2 26.5 2072 74 9 33 36 RAIN FED 60 1.92 3.16 866 1422
159 J&K PUNCH JAMIAN DA NALA 43K/5 30 1.2 36.4 4592 74 18 33 52.5 RAIN FED 100 1.88 3.09 1411 2316
160 J&K PUNCH NAR 43K/2 NAIL N NAIL N 43.5 9.2 26.8 1744 74 4.5 33 32 RAIN FED 60 1.92 3.16 866 1421
161 J&K PUNCH NARIAN NALA 43K/5 30.3 7.3 22.5 4350 74 18 33 54 RAIN FED 200 1.88 3.09 2824 4635
162 J&K PUNCH SARULI N 43K/3 KHORBAN R KHORBAN R 15.6 2.98 14.9 1511 74 6 33 21 RAIN FED 20 1.81 2.97 271 445
163 J&K PUNCH SINDARA N 43K/2 SURAN R SURAN R 14.4 4.4 11.3 2163 74 12 33 44 RAIN FED 100 1.80 2.95 1350 2216
164 J&K PUNCH -- 43K/2 MENDHAR R MENDHAR R 18.8 7.5 18.3 1672 74 1 33 41 RAIN FED 40 1.83 3.00 549 901
165 J&K PUNCH -- 43K/2 PHUGEL N PHUGEL N 17.2 4.3 16 2086 74 5.5 33 40 RAIN FED 100 1.82 2.99 1364 2240
166 J&K PUNCH -- 43K/3 KHORBAN R KHORBAN R 42.6 9.8 26.7 1710 74 8 33 22 RAIN FED 20 1.92 3.15 288 473
167 J&K RIASI BACHALA N 43K/15 GULABGARH N GULABGARH N
17.8 4.8 17 4073 74 54 33 24 RAIN FED 200 1.82 2.99 2735 4489
168 J&K RIASI BATOI N 43K/15 ANS R ANS R 36.5 10.9 24.6 3266 74 50 33 19.5 RAIN FED 200 1.90 3.13 2856 4688
169 J&K RIASI PONAN N 43K/15 ANS R ANS R 39.4 12.9 30.3 4404 74 47 33 22.5 RAIN FED 80 1.91 3.14 1148 1884
170 J&K RIASI SHIKARI N 43K/15 ANS R ANS R 15.8 6.5 17.2 2472 74 50 33 20 SNOW FED 200 1.81 2.97 2715 4456
171 J&K RIASI SUMBAR N 43O/3 CHENAB R 28.5 6.3 21.3 3431 75 8.5 33 16 S,R FED 120 1.88 3.08 1688 2771
172 J&K UDHAMPUR 43O/8 TAWI R 26 7.2 20.5 2487 75 17.5 33 2 S,R FED 80 1.87 3.06 1119 1837
173 J&K UDHAMPUR BANGAN RINAI 75 58 33 40 90 4.58 7.37 3092 4977
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
7
S.No. STATE
DISTRICT CATCHMENT RTS
STM
BSN
A SqKm
L Km
P Km
Zh m
Zl m
LAT LON FED HEAD Dependable Discharge Power
75% 50% 75% 50%
174 J&K UDHAMPUR BAP TAWI 75 22 32 57 100 2.08 3.35 1560 2512
175 J&K UDHAMPUR BHINB R 43O/12 CHENAB R 13.3 6.5 16.3 3427 75 42.5 33 9 RAIN FED 160 1.79 2.94 2149 3528
176 J&K UDHAMPUR BILKHAI TAIJ N. 75 49 33 49 75 2.18 3.51 1226 1974
177 J&K UDHAMPUR BIMAN BEMA N. 75 38 33 14 230 3.27 5.26 5641 9082
178 J&K UDHAMPUR BRANCHLI KHAD 43O/4 CHENAB R 18 5.1 17.5 2424 75 8 33 12.5 S,R FED 220 1.82 2.99 3010 4941
179 J&K UDHAMPUR BUDNARNYGAR TAIJ N. 76 45 33 50 60 1.65 2.66 743 1195
180 J&K UDHAMPUR CHAKWA N 43O/8 CHENAB R 32.3 11.9 26.9 2704 75 21 33 9 S,R FED 100 1.89 3.10 1417 2327
181 J&K UDHAMPUR CHENAGAL NAR 43O/6 AHLAN N 14.1 5.5 16.5 3701 75 22 33 32.5 S,R FED 200 1.80 2.95 2696 4426
182 J&K UDHAMPUR CHENANI II TAWI 75 10 32 57 50 3.00 4.83 1125 1811
183 J&K UDHAMPUR CHERJI GAD 43O/15 CHENAB R 52 12.5 33.2 4684 75 51 33 2 RAIN FED 160 1.95 3.19 2334 3831
184 J&K UDHAMPUR CHHATRU CHHATRU N. 75 36 33 25 100 4.03 6.49 3023 4866
185 J&K UDHAMPUR CHHITI GAD 43O/8 CHANDRA BHAGAR
9.5 5.8 13.4 2779 75 22 33 8 S,R FED 100 1.76 2.88 1316 2161
186 J&K UDHAMPUR CHILGAR N 43O/12,16 CHENAB R 70.7 12.1 35 2818 75 39.5 33 8.5 RAIN FED 200 1.98 3.25 2972 4879
187 J&K UDHAMPUR CHIRANG 52C/6,7 BHUZAS N BHUZAS N 58.25 39 0 5980 3100 76 24 33 26 S,G FED 200 2.85 4.08 4270 6117
188 J&K UDHAMPUR CHISHOT 52C/3,7 CHANDRA R CHANDRA R 34.50 5 28 6230 2320 76 16 33 23 S,G FED 200 1.90 3.11 2846 4672
189 J&K UDHAMPUR CHOPAR TAWI 75 26 32 54 70 1.00 1.61 525 845
190 J&K UDHAMPUR DALLA RAGONE BUD 75 55 33 24 90 5.68 9.14 3834 6173
191 J&K UDHAMPUR DAMBAR CHHATRU N. 75 35 33 27 120 2.04 3.28 1836 2956
192 J&K UDHAMPUR DAMNI ANS 74 49 33 20 60 3.59 5.78 1616 2601
193 J&K UDHAMPUR DEWAK N 43O/8 TAWI R 15 6.1 18.1 2806 75 18 33 1.5 S,R FED 100 1.80 2.96 1353 2221
194 J&K UDHAMPUR DHATUWAL KHAD 43O/4 CHENAB R 10.6 5.2 17.9 2726 75 15 33 14 RAIN FED 200 1.77 2.90 2650 4350
195 J&K UDHAMPUR DOBAR DOBAR N. 76 16 33 07 180 2.62 4.22 3537 5695
196 J&K UDHAMPUR DUBDALAU N 43O/3 MOHU MANGAT N
85.5 11.7 40.4 4261 75 7 33 26 RAIN FED 40 2.00 3.29 601 987
197 J&K UDHAMPUR DUNWAR I BARKOL 75 41 33 28 320 1.93 3.11 4632 7458
198 J&K UDHAMPUR DUNWAR II BARKOL 75 41 33 27 240 1.98 3.19 3564 5738
199 J&K UDHAMPUR GAGAR N 43O/3 BICHLARI R 12.4 5.9 16 3281 75 12 33 27 RAIN FED 120 1.78 2.93 1605 2635
200 J&K UDHAMPUR GAHAN N 43O/15,16 CHENAB R 55 12.4 30.2 4299 75 48 33 13 RAIN FED 200 1.95 3.20 2928 4806
201 J&K UDHAMPUR HAADALAU PATKOJ 75 32 34 01 120 3.97 6.39 3573 5753
202 J&K UDHAMPUR HALAN NAR 43O/6,7 SANDRAN R 20 5.8 18.9 3588 75 17 33 31 SNOW FED 40 1.84 3.01 551 904
203 J&K UDHAMPUR HAMURE BHUT N. 76 19 33 24 90 2.85 4.59 1924 3097
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
8
S.No. STATE
DISTRICT CATCHMENT RTS
STM
BSN
A SqKm
L Km
P Km
Zh m
Zl m
LAT LON FED HEAD Dependable Discharge Power
75% 50% 75% 50%
204 J&K UDHAMPUR HANSER 52C/3,4 CHANDRA R CHANDRA R 40.25 7.5 26 5029 1800 76 8 33 16 S,G FED 200 1.92 3.14 2873 4716
205 J&K UDHAMPUR HOLOT RHAZUN N. 76 19 33 25 200 0.96 1.55 1440 2318
206 J&K UDHAMPUR HUQPET BHUT N. 75 36 34 24 120 1.84 2.96 1656 2666
207 J&K UDHAMPUR KABAN 52C/3,4,7,8 CHANDRA R CHANDRA R 113.25 17 51.5 6062 1835 76 14 33 13 S,G FED 200 2.04 3.35 3058 5020
208 J&K UDHAMPUR KAIUCHA RAI BUD 75 48 33 25 240 0.89 1.43 1602 2579
209 J&K UDHAMPUR KALLAR ANS 74 58 33 17 115 10.20 16.42 8798 14164
210 J&K UDHAMPUR KALNAG R 43O/15 CHENAB R 14.9 6.7 17.7 3355 75 46 33 17.3 RAIN FED 200 1.80 2.96 2705 4441
211 J&K UDHAMPUR KANDERI N 43O/8 CHENAB R 39.4 9.5 26.2 2950 75 25.2 33 8 S,R FED 100 1.91 3.14 1435 2355
212 J&K UDHAMPUR KANDI ANS 74 30 33 23 120 0.94 1.51 846 1362
213 J&K UDHAMPUR KARAOLE NAL 43O/7,8 CHENAB R 35 13.2 30.8 3467 75 16 33 13 RAIN FED 200 1.90 3.12 2849 4676
214 J&K UDHAMPUR KARBUDURUN NAR 43O/6 AHLAN N 34.4 9.4 25.8 4328 75 23 33 31 S,R FED 200 1.90 3.11 2846 4671
215 J&K UDHAMPUR KESHWAN N 43O/11 CHENAB R 91 16.1 39.9 4072 75 44 33 19.8 RAIN FED 200 2.01 3.30 3018 4954
216 J&K UDHAMPUR KHADROT N 43O/11,12 UDAINPUR N 19.8 7.1 20.5 3744 75 34 33 17.5 RAIN FED 200 1.83 3.01 2752 4518
217 J&K UDHAMPUR KIAR KIAR N. 75 58 33 31 220 3.35 5.39 5528 8899
218 J&K UDHAMPUR KOHAG 52C/3 CHANDRA R CHANDRA R 83.00 11.5 36 6108 1611 76 3 33 20 S,G FED 200 2.00 3.28 3001 4927
219 J&K UDHAMPUR KOLEN KANTH N. 75 54 33 23 170 1.78 2.87 2270 3654
220 J&K UDHAMPUR KOTHI N 43O/12 CHENAB R 17.4 7.5 18.1 2861 75 33 33 8 RAIN FED 200 1.82 2.99 2731 4483
221 J&K UDHAMPUR KRUR NALA 43P/9 UJH R UJH R 30.1 6.1 23.5 4100 2040 75 37 32 48 RAIN FED 360 1.88 3.09 5081 8340
222 J&K UDHAMPUR KULSHI N 43O/12 CHENAB R 6 4.9 12.9 2618 75 40.1 33 9 RAIN FED 80 1.71 2.80 1024 1681
223 J&K UDHAMPUR KUNAU KALNAI 75 55 33 26 100 6.23 10.03 4673 7523
224 J&K UDHAMPUR LADU GAD 43O/16 KAGHUE GAD 56.3 10.6 30 3360 75 54.8 33 2.3 RAIN FED 120 1.95 3.21 1759 2887
225 J&K UDHAMPUR LANGINAI N 43O/5 LIDDAR R 58.1 16.3 37.6 4712 75 19 33 57.5 S,R FED 240 1.96 3.21 3525 5786
226 J&K UDHAMPUR MACHAL BHUT N. 76 23 34 20 220 2.41 3.88 3977 6402
227 J&K UDHAMPUR MAINGA KHAD 43O/4 PAINTHAL R 149.4 12.2 53.7 2741 75 7 33 7 S,R FED 40 2.07 3.40 622 1021
228 J&K UDHAMPUR MANDIAL KHAD 43O/4 CHENAB R 41.3 9.9 28.9 2909 75 6 33 12 RAIN FED 100 1.92 3.15 1439 2362
229 J&K UDHAMPUR MANHOJSAR PATKOJ 75 33 34 02 80 3.34 5.38 2004 3226
230 J&K UDHAMPUR MAU I BHUT N. 76 16 33 22 70 3.41 5.49 1790 2882
231 J&K UDHAMPUR MAU II BHUT N. 76 15 33 22 120 3.63 5.84 3267 5260
232 J&K UDHAMPUR MISLAI N 43O/16 KAL NAI 24.1 7.5 20.8 4250 75 58 33 8 RAIN FED 200 1.86 3.05 2785 4572
233 J&K UDHAMPUR NACHHAR N 43O/4,8 CHENAB R 47.3 9.3 28.7 2741 S,R FED 160 1.93 3.17 2321 3810
234 J&K UDHAMPUR NAI GAD 43O/15 CHENAB R 51.4 8.7 31.3 4606 75 53 33 22 RAIN FED 280 1.94 3.19 4082 6700
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
9
S.No. STATE
DISTRICT CATCHMENT RTS
STM
BSN
A SqKm
L Km
P Km
Zh m
Zl m
LAT LON FED HEAD Dependable Discharge Power
75% 50% 75% 50%
235 J&K UDHAMPUR PAINTHAL KHAD 43 O/4 PAINTHAL KHAD
PAINTHAL R. 149.41 12.9 55.26 2688 700 75-06-15 33-07-15 RF 120 2.07 3.40 1866 3063
236 J&K UDHAMPUR PARANU NIRU 75 34 33 24 70 7.80 12.56 4095 6593
237 J&K UDHAMPUR PHALA NIRU 75 36 33 21 120 7.40 11.91 6660 10723
238 J&K UDHAMPUR PIRA N 43O/4,8 CHENAB R 15.2 4.9 17 4201 75 18 33 10.5 RAIN FED 300 1.81 2.96 4063 6669
239 J&K UDHAMPUR POGUL GAD 43O/3,7 BICHLARI R 150.1 18.5 52.6 4089 75 12 33 20 S,R FED 120 2.07 3.40 1866 3064
240 J&K UDHAMPUR RAJHANI KALNAI 76 33 33 26 192 1.84 2.96 2650 4266
241 J&K UDHAMPUR RAJPURI BHARALI 74 20 33 25 144 1.00 1.61 1080 1739
242 J&K UDHAMPUR RAUN PUHALI BHUT N. 76 14 33 21 70 4.13 6.65 2168 3491
243 J&K UDHAMPUR RAZIUND BARINI 75 48 33 32 220 1.81 2.91 2987 4808
244 J&K UDHAMPUR RIKINWAS WARWAN 75 30 33 57 55 5.83 9.39 2405 3872
245 J&K UDHAMPUR SANSARI SANSARI N. 76 28 33 09 320 1.36 2.19 3264 5255
246 J&K UDHAMPUR SARAL ANS 74 41 33 21 140 2.58 4.15 2709 4361
247 J&K UDHAMPUR SARKUND WARWAN 75 35 33 43 50 12.27 19.75 4601 7408
248 J&K UDHAMPUR SARNUN KIAR N. 75 51 33 34 120 3.17 5.10 2853 4593
249 J&K UDHAMPUR SEYE N 43O/12 NIRU R 16.2 6.8 17.2 2380 75 39 33 3 RAIN FED 200 1.81 2.98 2719 4463
250 J&K UDHAMPUR SHAH KOL 43O/7 SANORAN R 30.7 6 21.9 3759 2089 75 20.5 33 29 S,R FED 80 1.88 3.09 1130 1856
251 J&K UDHAMPUR SHAHERAN SAINTHAL 75 07 33 07 60 3.34 5.38 1503 2420
252 J&K UDHAMPUR SHALGADDI N 43O/3,7 BICHLARI R 12.78 4 15.2 3143 75 12 33 23.5 RAIN FED 200 1.79 2.93 2680 4400
253 J&K UDHAMPUR SINIWAL NALA 43P/13 SEWA R SEWA R 49.7 9.6 29.1 3633 1950 75 48 32 45.5 RAIN FED 40 1.94 3.18 582 955
254 J&K UDHAMPUR SURWE KHAD 43O/4 PAINTHAL R 16.1 7.2 17.2 2314 75 5 33 8 S,R FED 160 1.81 2.97 2174 3569
255 J&K UDHAMPUR SUXHNAI WARWAN 75 31 34 08 120 4.16 6.70 3744 6028
256 J&K UDHAMPUR SWAR KIAR N. 75 48 33 32 120 3.94 6.34 3546 5709
257 J&K UDHAMPUR TAN KHAD 43O/8 TAWI R 31.2 7.4 23.8 2950 75 20 33 1.5 S,R FED 100 1.89 3.10 1414 2322
258 J&K UDHAMPUR TANALI NAL 43O/7,8 CHENAB R 18.5 8.6 21.4 2815 75 17.5 33 12.5 S,R FED 200 1.83 3.00 2741 4499
259 J&K UDHAMPUR TASHIPURA TAIJ N. 75 58 33 46 75 2.44 3.93 1373 2210
260 J&K UDHAMPUR UALAN WARWAN 75 42 33 42 220 1.75 2.82 2888 4649
261 J&K UDHAMPUR WARSHI 52E/8 NUBRA R NUBRA R 102.30 7.5 0 6186 3420 77 20 35 4 S,G FED 120 2.03 3.33 1824 2994
749397
1154432
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
1
Himachal Pradesh
S.No. STATE DISTRICT CATCHMENT RTS STM BSN A Sq Km
L Km
P Km
Zh m
Zl m
LON LAT FED HEAD Dependable Discharge Power
90% 75% 50% 90% 75% 50%
1 H.P. CHAMBA BAKANWAL 52 D/5 CHENAB 14.80 4.50 16.0 5297 2163 76° 26' 32° 58' S,G,R 400 0.32 0.49 0.82 950 1463 2468
2 H.P. CHAMBA BALIJ 52 D/6 BALIJ N. RAVI 53.1 9.1 28.4 4597 1400 76-23-00 32-32-00 RF 120 0.96 1.48 2.49 864 1330 2245
3 H.P. CHAMBA BALIJ KA NALA 52 D/7 RAVI 44.30 8.00 23.0 3446 1200 76° 19' 32° 28' R 160 0.82 1.26 2.13 984 1516 2557
4 H.P. CHAMBA BALSIO 52 D/1,5 RAVI 212.50 19.00 56.0 5321 1360 76° 9' 32° 53' S,G,R 80 3.20 4.93 8.31 1920 2956 4987
5 H.P. CHAMBA BANJHALWAL 52 D/5 CHENAB 39.50 12.00 27.5 5252 2200 76° 25' 32° 58' S,G,R 320 0.74 1.14 1.93 1782 2744 4630
6 H.P. CHAMBA BEND 52 D/2 RAVI 13.80 8.00 17.5 2890 1240 76° 10' 32° 30' R 320 0.30 0.46 0.77 715 1101 1858
7 H.P. CHAMBA BHUAR 52 D/3 RAVI 24.30 9.00 19.5 4029 1200 76° 14' 32° 28' R 160 0.49 0.75 1.27 584 900 1518
8 H.P. CHAMBA BHUILA 52 D/11,15 RAVI 75.50 12.50 38.0 5656 2500 76° 42' 32° 28' S,G,R 120 1.30 2.01 3.39 1173 1806 3047
9 H.P. CHAMBA BHUILA-II 52 D/11,15 BHUJIA N. BUDHIL N. 73.8 13.9 39.3 5656 2500 76-42-30 32-27-30 RF 200 1.28 1.97 3.32 1916 2951 4978
10 H.P. CHAMBA BHUJIA 52 D/11,15 BHUJIA N. BUDHIL NADI
72.5 15.6 39.4 5656 2500 76-43-00 32-26-30 RF 240 1.26 1.94 3.27 2264 3486 5883
11 H.P. CHAMBA BRAGUNA 52 D/2,6,7 RAVI 47.00 10.00 29.0 3893 200 76° 17' 32° 28' R 120 0.86 1.33 2.24 777 1197 2019
12 H.P. CHAMBA CHAKKA 43 P/13, 52 D/3 BEAS 70.00 10.00 31.5 2858 820 76° 0' 32° 23' R 80 1.22 1.88 3.17 732 1127 1902
13 H.P. CHAMBA CHALATU 52 D/11,15 RAVI 62.80 10.00 34.0 5702 2600 76° 43' 32° 28' S,G,R 160 1.11 1.71 2.88 1333 2052 3462
14 H.P. CHAMBA CHANDAL 43 P/13, 52 D/1 RAVI 15.00 7.00 15.0 3542 1700 76° 0' 32° 45' R 160 0.32 0.49 0.83 384 592 999
15 H.P. CHAMBA CHANJU 52 D/2,6 RAVI 211.00 16.50 57.5 5685 1400 76° 15' 32° 44' R 80 3.18 4.90 8.26 1908 2938 4957
16 H.P. CHAMBA CHASAG 52 D/9 CHENAB 206.00 13.00 46.5 6443 2616 76° 33' 32° 59' S,G,R 40 3.11 4.80 8.09 934 1439 2427
17 H.P. CHAMBA CHATRI 52 D/2 RAVI 50.80 10.00 26.0 3827 823 76° 7' 32° 45' R 120 0.92 1.42 2.40 831 1280 2160
18 H.P. CHAMBA CHATRI 52 D/2 RAVI 49.00 13.00 29.0 3327 823 76° 7' 32° 45' R 120 0.90 1.38 2.33 806 1241 2093
19 H.P. CHAMBA CHENAB 52 D/9 CHENAB 55.50 9.00 38.5 6443 2400 76° 34' 32° 59' S,G,R 160 1.00 1.54 2.59 1197 1843 3110
20 H.P. CHAMBA CHIRCHIND 52 D/7 RAVI 78.00 11.00 37.0 4692 1360 76° 25' 32° 27' R 50 1.34 2.06 3.48 503 774 1306
21 H.P. CHAMBA CHOBIA 52 D/10,11 RAVI 109.30 12.00 42.0 5857 2000 76° 36' 32° 27' S,G,R 120 1.80 2.77 4.67 1617 2490 4201
22 H.P. CHAMBA CHULAN 52 D/11,12 SUNDARI N. RAVI 65.5 11.3 35.3 4581 2024 76-40-30 32-16-30 RF 200 1.15 1.77 2.99 1728 2660 4489
23 H.P. CHAMBA CHURPUT 52 D/9,13 CHENAB 21.30 6.00 17.0 5575 3000 76° 47' 32° 51' S,G,R 400 0.43 0.67 1.13 1303 2006 3385
24 H.P. CHAMBA DARE DH 52 D/9 CHENAB 20.50 5.50 18.0 4096 2560 76° 36' 32° 46' S,G,R 600 0.42 0.65 1.09 1891 2911 4912
25 H.P. CHAMBA DARE DI 43 P/14, 52 D/2 RAVI 30.50 7.00 24.5 2482 600 75° 59' 32° 36' R 160 0.59 0.91 1.54 712 1096 1849
26 H.P. CHAMBA DARJEYANG 52 D/13 CHENAB 22.00 6.00 21.0 5808 3680 76° 53' 32° 54' S,G,R 280 0.45 0.69 1.16 938 1445 2437
27 H.P. CHAMBA DEHAR 52 D/3,4 RAVI 26.30 13.00 25.0 1242 480 76° 3' 32° 14' R 20 0.52 0.80 1.36 78 120 203
28 H.P. CHAMBA DHADIUND 52 C/4,D/1 TARAILA BAIRA N. 132 18 55.8 5014 1350 76-09-00 32-54-00 RF 240 2.12 3.26 5.50 3809 5865 9896
29 H.P. CHAMBA DHARAUL 52 D/10,11 HAL N. BUDHIL 24.1 10.8 25.4 5723 2280 76-39-00 32-28-00 RF 840 0.48 0.74 1.26 3046 4690 7914
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
2
S.No. STATE DISTRICT CATCHMENT RTS STM BSN A Sq Km
L Km
P Km
Zh m
Zl m
LON LAT FED HEAD Dependable Discharge Power
90% 75% 50% 90% 75% 50%
30 H.P. CHAMBA DHEDA 52 C/8,12 CHENAB 120.00 15.50 44.5 5321 2000 76° 22' 33° 5' S,G,R 200 1.95 3.00 5.06 2922 4500 7592
31 H.P. CHAMBA DIGORI 43 P/13 DHUNDHI DA NAL
SUIL 42.4 10.8 30.1 3916 1800 75-55-00 32-49-25 RF 180 0.79 1.22 2.05 1066 1641 2769
32 H.P. CHAMBA DJOHAL 52 D/5,9 CHENAB 16.50 5.00 17.0 6027 1920 76° 27 32° 53' S,G,R 280 0.35 0.54 0.90 731 1125 1899
33 H.P. CHAMBA DUDHIL 52 D/10,11,14,15 RAVI 110.00 16.00 46.0 6058 2720 76° 43' 32° 28' S,G,R 120 1.81 2.78 4.69 1626 2503 4224
34 H.P. CHAMBA DUK RUNDA 53 D/1 RAVI 19.30 4.00 15.0 3572 1400 76° 11' 32° 47' S,R 240 0.40 0.61 1.04 718 1105 1865
35 H.P. CHAMBA DUNALI 52 D/7 RAVI 59.00 15.00 44.0 4243 1240 76° 20' 32° 28' R 80 1.05 1.62 2.73 631 972 1640
36 H.P. CHAMBA DURGHED 53 D/3 RAVI 16.50 6.50 17.0 3626 1200 76° 13' 32° 28' R 240 0.35 0.54 0.90 626 965 1627
37 H.P. CHAMBA GANGPU 52 D/13 CHENAB 26.80 4.00 22.0 5784 3320 76° 52' 32° 50' S,G,R 240 0.53 0.82 1.38 954 1470 2480
38 H.P. CHAMBA GAROTU 52 C/8,12 CHENAB 47.50 15.00 37.0 6162 2200 76° 26' 33° 0' S,G,R 200 0.87 1.34 2.26 1307 2013 3396
39 H.P. CHAMBA GEHRA 52 D/7 RAVI 16.30 6.00 16.0 3936 1284 76° 20' 32° 27' R 120 0.34 0.53 0.89 310 477 805
40 H.P. CHAMBA GHARENI 52 D/3 RAVI 46.00 15.00 47.5 3626 600 76° 4' 32° 17' R 40 0.85 1.30 2.20 254 391 661
41 H.P. CHAMBA GHOI 52 D/11 RAVI 37.30 10.00 30.5 5113 2200 76° 37' 32° 27' S,G,R 200 0.71 1.09 1.84 1060 1632 2753
42 H.P. CHAMBA GHORDHAR 52 D/9 CHENAB 35.50 10.00 23.0 5560 3036 76° 45' 32° 50' S,G,R 160 0.68 1.04 1.76 812 1251 2110
43 H.P. CHAMBA GUMBA 52 D/13 CHENAB 78.00 9.00 34.0 5669 3776 76° 54' 32° 57' S,G,R 120 1.34 2.06 3.48 1206 1857 3134
44 H.P. CHAMBA GUNUN 52 D/7 BALIENI N. RAVI 61.8 17.9 41.9 4588 1200 76-18-30 32-27-30 RF 360 1.10 1.69 2.85 2957 4553 7682
45 H.P. CHAMBA GUWARI-I 52 D/2 CHATRI NAL
SEUL N. 48.5 13.2 29.5 3327 823 76-07-00 32-43-45 RF 160 0.89 1.37 2.31 1065 1640 2766
46 H.P. CHAMBA GWAR 52 D/6,7 BALIJ N. RAVI 109.7 14.8 44.4 4759 1200 76-20-00 32-29-00 RF 360 1.80 2.77 4.68 4866 7492 12642
47 H.P. CHAMBA GWERI 52 D/6 CHANJU N. SEUL N. 141.8 21.3 55.4 5685 997 76-16-00 32-43-00 RF 160 2.25 3.47 5.85 2703 4161 7021
48 H.P. CHAMBA HAL 52 D/10,11 RAVI 23.50 5.00 23.0 5723 2400 76° 39' 32° 27' S,G,R 320 0.47 0.73 1.23 1135 1748 2950
49 H.P. CHAMBA HAREDH 53 D/2,3 RAVI 19.30 6.00 18.0 3015 1000 76° 10' 32° 30' R 200 0.40 0.61 1.04 598 921 1554
50 H.P. CHAMBA HARSAR 52 D/6 CHENAB 68.50 6.00 28.0 5993 2457 76° 28' 32° 44' S,G,R 160 1.20 1.84 3.11 1437 2213 3733
51 H.P. CHAMBA HOLI 52 D/7,11,12 RAVI 50.50 8.00 27.5 4797 1800 76° 33' 32° 20' R 50 0.92 1.42 2.39 345 531 895
52 H.P. CHAMBA HOLI 52 D/7,11,12 HOLI N. RAVI 48.3 10.4 28.5 4797 1800 76-33-30 32-18-30 RF 320 0.88 1.36 2.30 2122 3267 5513
53 H.P. CHAMBA HUL 52 D/2,6 RAVI 72.00 14.00 37.0 3613 1040 76° 10' 32° 35' R 40 1.25 1.93 3.25 375 578 975
54 H.P. CHAMBA JAMBU 52 C/12,16 D/9,13 CHENAB 143.30 15.00 56.5 6443 3068 76° 37' 33° 2' S,G,R 120 2.27 3.50 5.90 2046 3149 5314
55 H.P. CHAMBA JAULI 52 D/3,7 RAVI 17.50 9.00 19.5 4178 1200 76° 15' 32° 28' S,R 50 0.37 0.56 0.95 137 211 357
56 H.P. CHAMBA JOINER 52 D/1,5 RAVI 119.80 19.00 50.0 5051 160 76° 8' 32° 48' S,G,R 40 1.95 3.00 5.05 584 899 1516
57 H.P. CHAMBA JOINER-I 52 D/1,5 JOINER SEUL N. 89.6 16.6 42.8 5166 1160 76-12-30 32-50-30 RF 200 1.51 2.33 3.93 2268 3492 5892
58 H.P. CHAMBA JOINER-II 52 D/1,5 JOINER SEUL N. 99 18.6 46.2 5166 1160 76-11-30 32-50-30 RF 160 1.65 2.54 4.28 1978 3046 5140
59 H.P. CHAMBA JUNDHABAL 52 D/1,2 TAREL N. SIUL N. 26.2 8.9 22 3059 1280 76-02-30 32-44-15 RF 120 0.52 0.80 1.35 468 720 1216
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
3
S.No. STATE DISTRICT CATCHMENT RTS STM BSN A Sq Km
L Km
P Km
Zh m
Zl m
LON LAT FED HEAD Dependable Discharge Power
90% 75% 50% 90% 75% 50%
60 H.P. CHAMBA KALA 52 D/11 RAVI 40.30 10.00 24.5 4932 1800 76° 33' 32° 20' S,G,R 120 0.76 1.16 1.96 680 1047 1767
61 H.P. CHAMBA KALM 52 D/3 RAVI 55.00 9.50 17.5 2723 920 76° 0' 32° 26' R 120 0.99 1.52 2.57 891 1372 2314
62 H.P. CHAMBA KAMIL 52 D/1,2,5,6 RAVI 112.50 8.00 28.0 5236 1200 76° 15' 32° 44' S,R 40 1.84 2.84 4.79 553 851 1436
63 H.P. CHAMBA KANWHAR 52 D/5 CHENAB 32.50 7.00 27.0 5093 2000 76° 27' 32° 55' S,G,R 280 0.63 0.97 1.63 1316 2027 3420
64 H.P. CHAMBA KARCH 52 D/2 CHENAB 23.30 5.50 20.0 6302 2640 76° 34' 32° 45' S,G,R 160 0.47 0.72 1.22 564 868 1464
65 H.P. CHAMBA KARPAT 52 D/9,13 CHENAB 31.80 5.00 23.5 6172 2860 76° 45' 32° 49' S,G,R 200 0.62 0.95 1.60 923 1421 2397
66 H.P. CHAMBA KARU 52 D/5,9 CHENAB 72.00 10.50 34.0 6302 2400 76° 26' 26° 52' S,G,R 280 1.25 1.93 3.25 2626 4043 6822
67 H.P. CHAMBA KARYUNI 52 C/8 CHENAB 17.00 6.00 16.0 4854 2200 76° 26' 33° 3' S,R 200 0.36 0.55 0.93 536 825 1392
68 H.P. CHAMBA KATHIARI 52 D/3 GHERENI NAL
GHERENI NAL
53.4 11.1 28.8 3626 1100 76-07-00 32-22-30 RF 120 0.96 1.49 2.51 868 1337 2256
69 H.P. CHAMBA KHANJAR 52 D/13 CHENAB 21.00 5.00 23.0 5731 3440 76° 52' 32° 53' S,G,R 240 0.43 0.66 1.11 772 1189 2006
70 H.P. CHAMBA KHARED 52 D/2 RAVI 46.80 9.00 26.5 2325 805 76° 5' 32° 43' R 40 0.86 1.32 2.23 258 397 670
71 H.P. CHAMBA KHINAR 52 D/11,15 RAVI 21.50 5.50 17.0 4561 2268 76° 45' 32° 18' S,G,R 280 0.44 0.67 1.14 920 1416 2389
72 H.P. CHAMBA KIHAN 43 P/13 RAVI 23.30 5.00 18.0 3759 1760 75° 57' 32° 46' R 80 0.47 0.72 1.22 282 434 732
73 H.P. CHAMBA KIRI 53 D/2,6 RAVI 52.00 7.00 26.0 3640 1000 76° 14' 32° 35' R 80 0.94 1.45 2.45 566 871 1469
74 H.P. CHAMBA KOLRI 52 D/2 RAVI 54.80 8.00 28.0 2768 760 76° 5' 32° 37' R 120 0.99 1.52 2.56 888 1367 2307
75 H.P. CHAMBA KOTSERI 52 D/3 GHERENI NAL
BHED KHAD
70.8 16.3 38.5 3626 518 76-05-00 32-20-00 RF 250 1.23 1.90 3.20 2311 3558 6003
76 H.P. CHAMBA KUGTI 52 D/14 RAVI 55.50 7.00 32.5 5798 3000 76° 53' 32° 37' S,G,R 200 1.00 1.54 2.59 1496 2304 3887
77 H.P. CHAMBA KUNDI 52 C/4,D/1 TARAILA BAIRA N. 131.5 18 53.8 5014 1350 76-09-00 32-53-30 RF 80 2.11 3.25 5.48 1266 1949 3288
78 H.P. CHAMBA KUNDI 52 D/2,6 RAVI 87.80 14.00 33.5 4597 1320 76° 4' 32° 36' S,R 80 1.49 2.29 3.86 891 1372 2315
79 H.P. CHAMBA KUNKALI 52 D/11 RAVI 15.50 5.50 15.0 5274 200 76° 38' 32° 17' S,G,R 320 0.33 0.51 0.86 791 1218 2055
80 H.P. CHAMBA KURHED 52 D/11,12 RAVI 43.80 8.00 26.0 4499 1800 76° 37' 32° 18' R 280 0.81 1.25 2.11 1706 2626 4431
81 H.P. CHAMBA LANGERA 43 P/13 DODU DA NAL
SUIL 22.3 6.9 20.1 3613 2160 75-52-00 32-52-00 RF 260 0.45 0.70 1.17 881 1357 2290
82 H.P. CHAMBA LUJAI 52 C/8,12 CHENAB 161.50 23.50 62.0 5801 2034 76° 22' 33° 7' S,G,R 200 2.52 3.88 6.55 3782 5823 9825
83 H.P. CHAMBA LUNED 52 D/3 RAVI 16.00 8.00 18.5 2754 1200 76° 9' 32° 17' R 80 0.34 0.52 0.88 203 313 528
84 H.P. CHAMBA MAHAL 52 C/8,12 CHENAB 105.30 17.50 45.0 6142 2200 76° 25' 33° 4' S,G,R 200 1.74 2.68 4.52 2609 4017 6778
85 H.P. CHAMBA MAHLON 43 P/13 SHIKRU DA NAL
SUIL 23 7.2 19.6 3759 1720 75-57-00 32-46-45 RF 200 0.46 0.71 1.21 696 1072 1809
86 H.P. CHAMBA MAKKAN 52 D/1 RAVI 126.80 12.00 36.0 3888 1200 76° 2' 32° 49' S,R 40 2.04 3.15 5.31 613 944 1593
87 H.P. CHAMBA MAKKAN-III 43 P/13,52 D/1 MAKKAN N. BARIA N. 129.2 18.3 47 3916 1160 76-08-00 32-49-30 RF 160 2.08 3.20 5.40 2493 3838 6476
88 H.P. CHAMBA MALANI 52 D/6,7 BALIJ N. RAVI 93.4 13.5 41 4759 1200 76-22-00 32-29-55 RF 120 1.57 2.41 4.07 1411 2172 3665
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
4
S.No. STATE DISTRICT CATCHMENT RTS STM BSN A Sq Km
L Km
P Km
Zh m
Zl m
LON LAT FED HEAD Dependable Discharge Power
90% 75% 50% 90% 75% 50%
89 H.P. CHAMBA MALIN 52 D/1 RAVI 64.50 13.00 34.0 4362 1320 76° 9' 32° 52' S,R 120 1.14 1.75 2.95 1023 1575 2657
90 H.P. CHAMBA MANSA 52 C/4,D/1 ANGARED N.
TARAILA N. 43.7 6.2 29.6 4385 1960 76-09-30 32-58-00 RF 160 0.81 1.25 2.11 973 1498 2527
91 H.P. CHAMBA MEHLED 52 D/3 RAVI 27.80 8.50 21.0 3262 1240 76° 11' 32° 28' R 80 0.55 0.84 1.42 328 506 853
92 H.P. CHAMBA MUJAR 52 D/5,9 CHENAB 13.50 5.00 16.0 5105 2213 76° 27' 32° 55' S,G,R 280 0.29 0.45 0.76 614 945 1595
93 H.P. CHAMBA NAMGHAR 52 D/9,13 CHENAB 17.30 6.00 17.5 5838 2800 76° 43' 32° 47' S,G,R 320 0.36 0.56 0.94 870 1340 2261
94 H.P. CHAMBA NAREN 52 D/1,5 RAVI 12.80 5.50 16.0 4006 1359 76° 13' 32° 46' S,R 240 0.28 0.43 0.73 503 774 1305
95 H.P. CHAMBA OI NALA 52 D/11 RAVI 21.50 7.50 20.0 4494 1400 76° 32' 32° 21' S,R 120 0.44 0.67 1.14 394 607 1024
96 H.P. CHAMBA PALBO 52 D/13 CHENAB 16.30 8.50 20.0 5731 3400 76° 52' 32° 50' S,G,R 240 0.34 0.53 0.89 620 954 1610
97 H.P. CHAMBA PANCHPUL 43 P/14,15 RAVI 96.00 17.00 40.0 1875 440 75° 50' 32° 31' R 80 1.61 2.47 4.17 963 1483 2502
98 H.P. CHAMBA PAPHITA 52 C/12 CHENAB 185.00 17.50 57.5 6142 3068 76° 37' 33° 2' S,G,R 120 2.84 4.37 7.37 2553 3931 6633
99 H.P. CHAMBA PATNED 43 P/14, 52 D/2 RAVI 17.00 6.00 17.0 2377 1000 76° 2' 32° 41' R 120 0.36 0.55 0.93 321 495 835
100 H.P. CHAMBA PHER 52 D/11 RAVI 28.80 6.00 22.5 5184 2400 76° 42' 32° 19' S,R 240 0.56 0.87 1.47 1016 1564 2639
101 H.P. CHAMBA PIMO 52 D/13 CHENAB 33.30 2.50 25.5 5932 3820 76° 51' 32° 59' S,G,R 240 0.64 0.99 1.66 1152 1774 2994
102 H.P. CHAMBA RAULA 52 D/11 RAVI 24.50 4.50 17.0 5274 2400 76° 42' 32° 18' S,G,R 200 0.49 0.76 1.27 736 1133 1911
103 H.P. CHAMBA SACH 52 C/4,D/1 SACH SACH 42 7.9 26 5014 1660 76-11-00 32-57-30 RF 80 0.78 1.21 2.03 470 724 1221
104 H.P. CHAMBA SADUN 52 D/7 BALENI KA BALENI KA 45 13.1 33.8 4588 1200 76-17-30 32-25-30 RF 400 0.83 1.28 2.16 2495 3841 6481
105 H.P. CHAMBA SAL 52 D/2,6 RAVI 166.50 22.00 55.0 4597 1320 76° 10' 32° 35' R,S 50 2.59 3.99 6.73 971 1495 2522
106 H.P. CHAMBA SALADIRI 43 P/14, 52 D/2 RAVI 64.30 10.00 31.5 2967 707 76° 2' 32° 39' R 40 1.13 1.75 2.94 340 524 883
107 H.P. CHAMBA SALUN 52 D/7,11 RAVI 116.00 14.00 46.0 4797 1592 76° 30' 32° 22' S,R 40 1.89 2.91 4.91 568 874 1474
108 H.P. CHAMBA SAL-II 52 D/2,6 SAL N. RAVI 271.99 29 71.6 4597 800 76-07-00 32-33-30 RF 80 3.96 6.10 10.30 2379 3662 6179
109 H.P. CHAMBA SAREDI KHAD 52 D/2,6 SAREDI KHAD
SAL N. 74.9 13.2 40.1 4597 1375 76-15-00 32-35-30 RF 60 1.29 1.99 3.36 582 897 1513
110 H.P. CHAMBA SER 52 D/1,5 JOINER SEUL N. 104.8 19.2 47.1 5166 1120 76-10-30 32-50-00 RF 40 1.73 2.67 4.50 520 800 1350
111 H.P. CHAMBA SEUL 43 P/3 RAVI 153.30 13.50 58.5 3916 1720 75° 56' 32° 47' S,R 50 2.41 3.71 6.26 904 1391 2348
112 H.P. CHAMBA SHERUN 52 D/9,10 CHENAB 30.50 4.00 22.8 5993 2320 76° 33' 32° 46' S,G,R 320 0.59 0.91 1.54 1424 2192 3699
113 H.P. CHAMBA SIA 52 D/10,11 RAVI 12.50 4.50 16.0 5723 2600 76° 42' 32° 28' S,G,R 520 0.27 0.42 0.71 1067 1642 2771
114 H.P. CHAMBA SUNDRALI 52 D/11,12 RAVI 116.00 9.00 34.5 4581 2000 76° 41' 32° 17' S,R 80 1.89 2.91 4.91 1135 1748 2949
115 H.P. CHAMBA SUP 52 D/10,11 RAVI 21.00 7.00 19.0 4864 1840 76° 32' 32° 27' R 520 0.43 0.66 1.11 1673 2577 4347
116 H.P. CHAMBA TARAILA 53 D/1 RAVI 166.50 10.50 52.0 4762 1400 76° 9' 32° 53' S,G,R 120 2.59 3.99 6.73 2330 3588 6053
117 H.P. CHAMBA TAREL 52 D/1 RAVI 25.80 8.00 18.0 3059 1271 76° 4' 32° 44' R 120 0.51 0.79 1.33 462 711 1200
118 H.P. CHAMBA TAREL N. 52 D/1,2 TAREL N. SIUL NADI 26.1 8.7 23.2 3059 1280 76-02-00 32-45-00 RF 120 0.52 0.80 1.35 466 718 1212
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
5
S.No. STATE DISTRICT CATCHMENT RTS STM BSN A Sq Km
L Km
P Km
Zh m
Zl m
LON LAT FED HEAD Dependable Discharge Power
90% 75% 50% 90% 75% 50%
119 H.P. CHAMBA THANARI 52 D/11 RAVI 21.50 5.00 15.0 5656 2200 76° 38' 32° 28' S,G,R 200 0.44 0.67 1.14 657 1011 1707
120 H.P. CHAMBA THARANG 52 D/13 CHENAB 29.30 7.00 23.0 6076 3640 76° 53' 32° 53' S,G,R 120 0.57 0.88 1.49 516 794 1340
121 H.P. CHAMBA THATI N. 52 D/13 THATI N. MIYAR NADI
9.1 4.9 13 5648 3480 76-53-15 32-53-45 RF 640 0.21 0.32 0.54 997 1534 2589
122 H.P. CHAMBA TIKRI KHOS 52 D/3 GHERENI NAL
BHED KHAD
61.9 13.1 32.4 3265 518 76-06-30 32-22-00 RF 200 1.10 1.69 2.85 1645 2533 4274
123 H.P. CHAMBA TULANG 52 D/7,11 RAVI 16.30 6.00 17.0 4722 2000 76° 32' 32° 21' S,R 360 0.34 0.53 0.89 930 1432 2415
124 H.P. CHAMBA TUNDAH 52 D/6,7,10 RAVI 295.80 13.00 64.5 5857 1200 76° 27' 32° 29' S,G,R 80 4.26 6.56 11.08 2558 3939 6646
125 H.P. CHAMBA TUNTHIARA 52 D/5 CHENAB 22.00 5.00 19.0 5236 2400 76° 26' 32° 51' S,G,R 200 0.45 0.69 1.16 670 1032 1741
126 H.P. CHAMBA ULDHAMPU 52 D/13 CHENAB 34.50 3.50 25.0 6019 3520 76° 52' 32° 53' S,G,R 200 0.66 1.02 1.72 990 1525 2573
127 H.P. CHAMBA UR 52 D/9 CHENAB 59.00 8.00 38.0 6302 2600 76° 38' 32° 45' S,G,R 160 1.05 1.62 2.73 1262 1944 3279
128 H.P. CHAMBA URGUS- 52 D/9,13 CHENAB 50.50 5.00 26.0 6443 3200 76° 48' 32° 52' S,G,R 160 0.92 1.42 2.39 1103 1698 2865
129 H.P. KANGRA 53 A/5 BEAS R. 25.8 7.4 20.8 1099 450 76-17-30 31-49-00 RF 20 0.51 0.79 1.33 77 118 200
130 H.P. KANGRA BRAHL 52 D/3,7 RAVI 95.30 13.00 35.0 4038 1120 76° 9' 32° 17' R 40 1.60 2.46 4.14 479 737 1243
131 H.P. KANGRA BUNER 52 D/8,12 BEAS 54.80 10.00 27.0 4798 1200 76° 30' 32° 9' S,R 50 0.99 1.52 2.56 370 570 961
132 H.P. KANGRA GAJ 52 D/7,8 BEAS 88.50 5.50 30.0 4610 1200 76° 17' 32° 15' R 50 1.50 2.30 3.89 561 864 1457
133 H.P. KANGRA GANUNU 53 A/9 BEAS 25.80 11.00 25.0 1084 580 76° 36' 31° 35' R 20 0.51 0.79 1.33 77 118 200
134 H.P. KANGRA HAROTI 52 D/12, 53 A/9 BEAS 41.00 13.00 28.0 1388 520 76° 34' 31° 53' R 20 0.77 1.18 1.99 115 177 299
135 H.P. KANGRA IKU 52 D/8 BEAS 40.00 22.50 30.5 4788 1000 76° 25' 32° 9' R 60 0.75 1.16 1.95 338 520 878
136 H.P. KANGRA JANED KHAD 52 D/8,53 A/5 JANED KHAD
NEOGAL KHAD
47.6 11.27 29.4 1063 820 76-26-30 31-57-30 RF 60 0.87 1.34 2.27 393 605 1021
137 H.P. KANGRA KALIHEN 52 D/15,16, H/3,4 RAVI 235.50 17.50 62.5 5296 2480 76° 48' 32° 19' S,G,R 80 3.50 5.39 9.09 2099 3232 5453
138 H.P. KANGRA KHAULI 52 D/3,7 RAVI 35.80 9.50 25.0 3732 1600 76° 13' 32° 17' R 80 0.68 1.05 1.77 409 630 1063
139 H.P. KANGRA KUARSI 52 D/7 KUARSI KUARSI 52.5 11.3 31.2 4692 1592 76-29-00 32-22-00 RF 60 0.95 1.46 2.47 428 659 1111
140 H.P. KANGRA LAMBADAG 52 D/16 BEAS 234.30 20.00 60.0 5494 1880 76° 51' 32° 3' S,G,R 40 3.48 5.36 9.05 1045 1609 2714
141 H.P. KANGRA LUNI 53 D/12 BEAS 134.80 34.00 48.0 4581 1053 76° 40' 32° 4' R 80 2.16 3.32 5.60 1293 1991 3359
142 H.P. KANGRA MANJHI 52 D/8 BEAS 76.00 28.00 50.0 4670 780 76° 17' 32° 10' R 40 1.31 2.02 3.40 393 605 1021
143 H.P. KANGRA MANUNI 52 D/8 BEAS 68.00 24.00 53.0 2867 629 76° 15' 32° 5' R 40 1.19 1.83 3.09 357 550 927
144 H.P. KANGRA NEOGAL 52 D/8,12 BEAS 178.00 36.30 66.0 4578 790 76° 27' 32° 2' R 50 2.74 4.22 7.13 1029 1584 2673
145 H.P. KANGRA NIKORA 52 D/15 RAVI 12.00 3.50 12.5 4749 2520 76° 48' 32° 19' S,R 240 0.26 0.41 0.69 475 732 1234
146 H.P. KANGRA OWA St I 52 D/12 BEAS 47.00 6.00 55.0 3873 790 76° 37' 32° 0' R 40 0.86 1.33 2.24 259 399 673
147 H.P. KANGRA OWA St II 52 D/12 BEAS 57.00 3.00 55.0 3873 790 76° 37' 32° 0' R 40 1.02 1.57 2.65 306 472 796
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
6
S.No. STATE DISTRICT CATCHMENT RTS STM BSN A Sq Km
L Km
P Km
Zh m
Zl m
LON LAT FED HEAD Dependable Discharge Power
90% 75% 50% 90% 75% 50%
148 H.P. KANGRA OWA St III 52 D/12 BEAS 110.00 14.50 55.0 3873 790 76° 37' 32° 0' R 40 1.81 2.78 4.69 542 834 1408
149 H.P. KANGRA RASOI SIMANA 52 D/12,16 UHL R. UHL R. 55.5 10.1 29.7 4922 76-46-30 32-10-30 RF 300 1.00 1.54 2.59 2244 3456 5831
150 H.P. KANGRA RAVI 52 D/5, H/3 RAVI 217.50 14.00 61.0 6200 2760 76° 50' 32° 20' S,G,R 160 3.26 5.03 8.48 3918 6032 10178
151 H.P. KANGRA SHAH 52 D/15 RAVI 134.50 7.00 47.0 5934 2800 76° 50' 32° 21' S,G,R 80 2.15 3.31 5.59 1291 1987 3353
152 H.P. KANGRA THAMSAR 52 D/15,16 RAVI 26.30 5.00 22.0 5067 2520 76° 48' 32° 19' S,G,R 360 0.52 0.80 1.36 1408 2169 3659
153 H.P. KANGRA THANGAR 52 D/16 THANGAR UHL 39.4 10.2 33.7 5194 1820 76-52-00 32-09-00 RF 120 0.74 1.14 1.92 667 1027 1732
154 H.P. KANGRA UHI 52 D/2,16 BEAS 144.30 18.00 51.0 5078 2200 76° 45' 32° 5' S,G,R 240 2.29 3.52 5.94 4116 6337 10692
155 H.P. KINNAUR BRUA 53 I/3 BASPA 38.00 12.00 43.5 5141 1898 78° 11' 31° 28' R 400 0.72 1.11 1.87 2154 3317 5596
156 H.P. KINNAUR CHANGO 51 I/5,6 SATLUJ 50.30 12.00 29.0 5820 2800 78° 26' 31° 46' S,R 240 0.92 1.41 2.38 1649 2538 4283
157 H.P. KINNAUR CHAUNDA 53 E/14 SATLUJ 15.30 5.50 16.0 3978 1345 77° 52' 31° 33' R 360 0.33 0.50 0.85 880 1355 2286
158 H.P. KINNAUR CHERANG 53 I/6 I/7 SATLUJ 22.00 6.00 24.0 6473 2300 78° 24' 31° 35' R 400 0.45 0.69 1.16 1340 2064 3482
159 H.P. KINNAUR DUBA 53 I/6 I/7 SATLUJ 38.50 8.50 31.7 6473 2360 78° 21' 31° 34' R 160 0.73 1.12 1.89 871 1342 2264
160 H.P. KINNAUR DULING 53 I/2 I/3 SATLUJ 48.80 12.00 31.3 5124 1580 78° 6' 31° 32' R 200 0.89 1.37 2.32 1338 2060 3477
161 H.P. KINNAUR GARA 53 I/6 I/7 SATLUJ 25.80 7.00 30.2 6080 2520 78° 29' 31° 33' R 400 0.51 0.79 1.33 1539 2370 3998
162 H.P. KINNAUR GEKOD LUNGPA 53 I/0 SATLUJ 40.50 10.50 27.5 5890 4000 78° 42' 31° 37' S,G,R 80 0.76 1.17 1.97 455 701 1183
163 H.P. KINNAUR GINAM 53 I/6,10 SATLUJ 17.80 4.50 15.5 5480 2120 78° 26' 31° 36' S,G,R 200 0.37 0.57 0.97 558 858 1448
164 H.P. KINNAUR GOR 53 I/7 BASPA 20.50 4.30 22.3 6080 2980 78° 20' 31° 24' G 320 0.42 0.65 1.09 1008 1553 2620
165 H.P. KINNAUR GYAMTHING 53 I/10,14 SATLUJ 122.00 13.50 50.0 5850 4080 78° 42' 31° 37' S,R 40 1.98 3.04 5.13 593 913 1540
166 H.P. KINNAUR HOJIS 53 I/10,14 SATLUJ 116.30 20.00 52.0 6288 2405 78° 34' 31° 45' S,G,R 200 1.90 2.92 4.93 2844 4379 7389
167 H.P. KINNAUR HURBA 53 I/3 I/7 BASPA 44.80 9.00 32.5 5682 2480 78° 17' 31° 25' S,G,R 200 0.83 1.28 2.15 1242 1913 3228
168 H.P. KINNAUR JANAPA 53 I/7 I/8 BASPA 41.80 6.30 30.3 5930 3395 78° 27' 31° 21' S,G,R 320 0.78 1.20 2.03 1872 2882 4863
169 H.P. KINNAUR KANAM 53 I/6 SATLUJ 8.80 9.50 21.0 5092 2360 78° 32' 31° 40' R 320 0.20 0.31 0.52 484 745 1257
170 H.P. KINNAUR KANDRU 53 E/14 SATLUJ 12.00 6.00 14.0 4336 1520 77° 59' 31° 34' R 240 0.26 0.41 0.69 475 732 1234
171 H.P. KINNAUR KANGRANG 53 I/2 SATLUJ 16.80 6.00 16.5 4355 2000 78° 3' 31° 34' S,G,R 280 0.35 0.54 0.92 742 1143 1929
172 H.P. KINNAUR KASHANG 53 I/2 I/6 SATLUJ 131.00 20.70 62.5 5806 2000 78° 20' 31° 35' S,G,R 320 2.10 3.24 5.46 5046 7769 13108
173 H.P. KINNAUR KHARGOLA 53 I/7 BASPA 33.25 6.25 26.5 6080 2680 78° 19' 31° 24' G 280 0.64 0.98 1.66 1343 2067 3488
174 H.P. KINNAUR KHAYO 53 I/10 SATLUJ 37.80 5.50 30.0 6248 3605 78° 37' 31° 37' S,G,R 280 0.71 1.10 1.86 1501 2311 3899
175 H.P. KINNAUR KUT 53 E/14 SATLUJ 63.00 14.00 38.0 5194 1220 77° 50' 31° 34' S,R 200 1.11 1.71 2.89 1670 2572 4339
176 H.P. KINNAUR LAMBAR 53 I/6,7,10 SATLUJ 43.30 6.00 33.5 6172 2925 78° 30' 31° 31' S,G,R 360 0.80 1.24 2.09 2171 3343 5641
177 H.P. KINNAUR LISTIGRANG 52 I/2 SATLUJ 56.80 9.00 32.0 5806 2200 78° 3' 31° 35' S,G,R 200 1.02 1.57 2.64 1527 2351 3966
178 H.P. KINNAUR MANGSA 53 I/7 BASPA 10.30 4.50 6.2 5635 3160 78° 23' 31° 22' G 320 0.23 0.36 0.60 555 854 1441
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
7
S.No. STATE DISTRICT CATCHMENT RTS STM BSN A Sq Km
L Km
P Km
Zh m
Zl m
LON LAT FED HEAD Dependable Discharge Power
90% 75% 50% 90% 75% 50%
179 H.P. KINNAUR MARDUNG 52 L/8, 53 I/5 SPITI 31.30 7.50 24.0 5836 3200 78° 27' 32° 31' S,R 200 0.61 0.93 1.58 910 1401 2364
180 H.P. KINNAUR MELAM 53 I/2 I/3 SATLUJ 53.80 15.50 34.3 5261 1600 78° 4' 31° 31' R 120 0.97 1.50 2.52 874 1346 2270
181 H.P. KINNAUR NARADU 53 I/7 BASPA 20.50 5.00 24.3 5712 3400 78° 26' 31° 21' S,G,R 240 0.42 0.65 1.09 756 1165 1965
182 H.P. KINNAUR NARGANI 53 I/3,4,7,8 RUPIN 184.30 32.50 63.3 5520 2080 78° 6' 31° 15' R 40 2.83 4.35 7.35 848 1306 2204
183 H.P. KINNAUR PABBAR 53 I/3 TONS 86.50 15.50 42.5 5130 2560 78° 0' 31° 19' R 160 1.47 2.26 3.81 1760 2709 4571
184 H.P. KINNAUR PANGI 53 I/2,6 SATLUJ 48.50 9.00 28.0 5050 2320 78° 17' 31° 35' R 200 0.89 1.37 2.31 1331 2049 3458
185 H.P. KINNAUR PANGRANG 53 I/10 SATLUJ 17.00 3.50 17.0 6248 3000 78° 33' 31° 38' S,G,R 400 0.36 0.55 0.93 1071 1650 2784
186 H.P. KINNAUR PANWI 53 E/14,15, I/2,3 SATLUJ 58.80 15.50 34.5 5236 1560 78° 1' 31° 33' S,R 200 1.05 1.61 2.72 1573 2422 4087
187 H.P. KINNAUR RALDANG 53 I/6 SATLUJ 25.50 6.50 21.5 6056 2200 78° 22' 31° 35' S,G,R 200 0.51 0.78 1.32 762 1173 1979
188 H.P. KINNAUR RAURA 53 I/2 SATLUJ 68.50 10.50 34.3 5252 1760 78° 8' 31° 30' S,G,R 160 1.20 1.84 3.11 1437 2213 3733
189 H.P. KINNAUR ROKTI 53 I/3,7 BASPA 61.00 13.50 37.0 5029 2560 78° 16' 31° 25' S,R 200 1.08 1.67 2.81 1624 2501 4220
190 H.P. KINNAUR ROPA 53 I/1,5,6,9,10 SATLUJ 640.00 63.50 113.0 5693 2365 78° 32' 31° 43' S,G,R 80 8.33 12.83 21.65 4999 7698 12988
191 H.P. KINNAUR ROTHEN LUNGA 53 I/10 SATLUJ 50.00 10.00 30.0 5890 3800 78° 38' 31° 37' S,G,R 240 0.91 1.40 2.37 1640 2525 4261
192 H.P. KINNAUR ROVANG 53 I/6,10 SATLUJ 18.50 6.50 20.0 6248 2400 78° 28' 31° 34' S,G,R 440 0.38 0.59 1.00 1268 1953 3295
193 H.P. KINNAUR RUPIN 53 I/3 I/4 TONS 68.00 14.30 41.5 4808 2080 78° 6' 31° 15' R 120 1.19 1.83 3.09 1071 1649 2782
194 H.P. KINNAUR SAILAN 53 E/14 SATLUJ 10.80 6.30 17.3 3979 1240 77° 50' 31° 35' R 560 0.24 0.37 0.63 1012 1558 2628
195 H.P. KINNAUR SHAGCHANG 53 I/6,10 SATLUJ 27.30 6.50 25.0 6095 3200 78° 30' 31° 31' S,G,R 400 0.54 0.83 1.40 1616 2489 4199
196 H.P. KINNAUR SHAILAPYA 53 I/7 BASPA 7.80 3.60 12.5 5545 3380 78° 26' 31° 21' G 280 0.18 0.28 0.47 381 587 991
197 H.P. KINNAUR SHANKVI 53 I/6,10 SATLUJ 18.00 6.00 19.0 6248 300 78° 29' 31° 33' S,G,R 400 0.38 0.58 0.98 1126 1734 2925
198 H.P. KINNAUR SHAUNE 53 I/7 BASPA 59.80 9.70 37.5 5712 3200 78° 23' 31° 23' S,G,R 240 1.06 1.64 2.76 1916 2950 4977
199 H.P. KINNAUR SHAUNG 53 I/3 BASPA 19.75 7.50 19.0 5094 2120 78° 13' 31° 27' S,R 240 0.41 0.63 1.06 732 1127 1902
200 H.P. KINNAUR SHUSHANG 53 I/7 BASPA 15.00 4.50 20.0 6032 3280 78° 24' 31° 21' G 240 0.32 0.49 0.83 577 888 1498
201 H.P. KINNAUR SHYANG 53 I/6 I/7 SATLUJ 36.50 6.00 22.5 5983 1800 78° 16' 31° 31' S,G,R 240 0.69 1.07 1.80 1248 1922 3242
202 H.P. KINNAUR SINGAN 53 I/7 BASPA 12.50 8.70 15.3 4823 2880 78° 17' 31° 25' S,R 240 0.27 0.42 0.71 492 758 1279
203 H.P. KINNAUR SOLDAN 53 E/14, 15 SATLUJ 94.30 13.00 38.0 5240 1400 77° 55' 31° 34' R 200 1.58 2.43 4.11 2371 3650 6159
204 H.P. KINNAUR SORANG 53 E/14 SATLUJ 141.00 24.50 64.0 5625 1295 77° 52' 31° 34' S,G,R 280 2.24 3.45 5.82 4706 7246 12226
205 H.P. KINNAUR TAITI 53 I/1,2,5,6 SATLUJ 417.30 38.00 101.0 5692 2780 78° 24' 31° 39' S,G,R 200 5.75 8.85 14.93 8622 13276 22400
206 H.P. KINNAUR TANGLING 53 I/6, I/7 SATLUJ 54.50 7.50 31.3 6473 1940 78° 16' 31° 32' S,G,R 200 0.98 1.51 2.55 1473 2268 3826
207 H.P. KINNAUR TIKADDA 53 E/14 SATLUJ 17.30 7.00 18.3 4044 1280 77° 51' 31° 35' R 400 0.36 0.56 0.94 1088 1675 2826
208 H.P. KINNAUR WANGAR 53 E/13,14 I/1,2 SATLUJ 281.50 23.00 91.0 5567 2400 78° 2' 31° 37' S,G,R 40 4.08 6.29 10.61 1225 1887 3183
209 H.P. KINNAUR YULING 53 I/5 SATLUJ 13.00 6.00 15.0 4831 2880 78° 26' 31° 47' S,R 200 0.28 0.44 0.74 424 654 1103
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
8
S.No. STATE DISTRICT CATCHMENT RTS STM BSN A Sq Km
L Km
P Km
Zh m
Zl m
LON LAT FED HEAD Dependable Discharge Power
90% 75% 50% 90% 75% 50%
210 H.P. KULU ALAINI 52 H/3,4,7,8 BEAS 146.80 14.50 52.0 6001 1920 77° 12' 32° 13' S,G,R 160 2.32 3.57 6.03 2785 4288 7235
211 H.P. KULU ANI 53 E/6,7 SATLUJ 171.50 17.00 50.0 3652 1000 77° 23' 31° 25' R 80 2.66 4.09 6.90 1594 2454 4141
212 H.P. KULU BAGA 53 E/5 BEAS 16.30 3.50 13.5 3236 1148 77° 16' 31° 46' R 120 0.34 0.53 0.89 310 477 805
213 H.P. KULU BAKAR BIHAR 53 E/9 BEAS 48.00 5.00 25.0 6248 3800 77° 42' 31° 55' S,G,R 120 0.88 1.35 2.28 791 1219 2056
214 H.P. KULU BAKAR KIARA 53 E/9 BEAS 9.80 4.00 13.5 5479 3060 77° 32' 31° 59' S,G,R 440 0.22 0.34 0.58 731 1125 1898
215 H.P. KULU BEAS 52 H/3,7 BEAS 37.50 9.00 28.0 4814 2243 77° 11' 32° 18' S,R 120 0.71 1.09 1.84 639 984 1660
216 H.P. KULU BEAS KUND 52 H/3 BEAS 134.30 13.00 43.5 5932 2320 77° 10' 32° 18' S,G,R 80 2.15 3.31 5.58 1289 1985 3349
217 H.P. KULU BRAHAM GANGA 52 H/8 BEAS 45.00 15.00 26.0 5293 1697 77° 21' 32° 2' S,G,R 200 0.83 1.28 2.16 1247 1920 3240
218 H.P. KULU CHARKERA 53 E/9,10 BEAS 16.30 5.00 17.0 4701 2600 77° 32' 31° 32' S,R 280 0.34 0.53 0.89 723 1113 1879
219 H.P. KULU CHHAKI 52 H/4,8 BEAS 45.50 5.50 26.0 4426 1498 77° 9' 32° 2' S,R 100 0.84 1.29 2.18 630 969 1636
220 H.P. KULU CHHAROR 53 E/1,5 BEAS 32.00 6.50 23.0 3674 1200 77° 11' 31° 55' R 80 0.62 0.95 1.61 371 571 964
221 H.P. KULU DAUNS PAR 53 E/9 BEAS 26.00 3.50 23.5 5840 3700 77° 40' 31° 57' S,G,R 120 0.52 0.80 1.34 465 716 1208
222 H.P. KULU DAWLA 53 E/1 BEAS 34.30 8.50 24.0 2659 1089 77° 10' 31° 51' R 80 0.66 1.01 1.71 394 607 1024
223 H.P. KULU DHAUGI 53 E/5,6 BEAS 16.00 9.00 15.5 3333 1400 77° 18' 31° 47' R 120 0.34 0.52 0.88 305 470 792
224 H.P. KULU DUHANGAN 52 H/4,8 BEAS 93.50 19.50 43.5 6001 1674 77° 12' 32° 12' S,G,R 120 1.57 2.42 4.08 1412 2174 3668
225 H.P. KULU GADHERNI 52 H/4 BEAS 10.50 5.00 13.5 4026 1835 77° 12' 32° 13' R 80 0.24 0.36 0.61 141 217 366
226 H.P. KULU GAHRU 53 E/9,10 BEAS 19.80 5.50 19.0 4752 2380 77° 31' 31° 47' S,R 340 0.41 0.63 1.06 1040 1601 2701
227 H.P. KULU GHATGAR 53 E/6 BEAS 24.30 6.00 17.5 3333 1280 77° 20' 31° 39' R 120 0.49 0.75 1.27 438 675 1139
228 H.P. KULU HALINDI 52 H/3 BEAS 20.30 5.50 17.5 4830 2000 77° 11' 32° 17' S,R 50 0.42 0.64 1.08 156 241 406
229 H.P. KULU HURLA 53 E/1,5 BEAS 196.30 22.50 64.0 5082 1043 77° 11' 31° 44' R 50 2.99 4.60 7.76 1120 1725 2910
230 H.P. KULU JIBHI 53 E/6 TIRTHAN 70.00 17.50 38.0 3620 1280 77° 20' 31° 38' R 120 1.22 1.88 3.17 1098 1691 2853
231 H.P. KULU JIGRAI 53 E/5 PARBATI 40.00 14.50 29.5 4747 2200 77° 27' 32° 0' R 160 0.75 1.16 1.95 901 1387 2340
232 H.P. KULU JIGRAL 53 E/5 BEAS 41.00 13.00 28.0 5425 2213 77° 27' 32° 0' S,G,R 160 0.77 1.18 1.99 920 1417 2391
233 H.P. KULU JIJAR 53 E/7 SATLUJ 28.50 7.00 22.0 2739 920 77° 27' 31° 21' R 120 0.56 0.86 1.45 503 775 1308
234 H.P. KULU JIRAH 52 H/8 BEAS 18.50 6.00 19.0 5003 2213 77° 25' 32° 0' S,G,R 140 0.38 0.59 1.00 404 621 1048
235 H.P. KULU JIWA KOTHARI 53 E/5 BEAS 118.00 28.50 57.5 4768 1344 77° 20' 31° 47' S,G,R 140 1.92 2.96 4.99 2016 3104 5238
236 H.P. KULU KAIS 52 H/4 BEAS 18.00 9.00 20.5 3822 1400 77° 7' 32° 2' R 160 0.38 0.58 0.98 450 693 1170
237 H.P. KULU KAJO 53 E/10,11 SATLUJ 35.00 7.50 20.5 3684 1000 77° 41' 31° 29' R 80 0.67 1.03 1.74 401 618 1042
238 H.P. KULU KALWARI 53 E/6 BEAS 26.00 20.00 30.7 3498 1400 77° 22' 31° 38' R 120 0.52 0.80 1.34 465 716 1208
239 H.P. KULU KAMAND 53 E/6 TIRTHAN 14.00 7.00 15.7 2725 1160 77° 17' 31° 41' R 120 0.30 0.46 0.78 272 418 706
240 H.P. KULU KARTAUL 53 E/5 BEAS 30.00 6.00 23.0 4335 1638 77° 24' 31° 47' R 120 0.58 0.90 1.52 526 810 1367
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
9
S.No. STATE DISTRICT CATCHMENT RTS STM BSN A Sq Km
L Km
P Km
Zh m
Zl m
LON LAT FED HEAD Dependable Discharge Power
90% 75% 50% 90% 75% 50%
241 H.P. KULU KASOL 52 H/8 53 E/5 BEAS 57.50 10.00 32.0 4211 1560 77° 14' 32° 1' S,R 120 1.03 1.58 2.67 926 1425 2405
242 H.P. KULU KHAKNAL 52 H/4 ,8 BEAS 14.00 8.00 19.0 3730 1880 77° 11' 32° 11' R 120 0.30 0.46 0.78 272 418 706
243 H.P. KULU KHERD 53 E/7,11 SATLUJ 16.80 5.00 14.5 3154 1200 77° 33' 31° 26' R 40 0.35 0.54 0.92 106 163 276
244 H.P. KULU KOKI 53 E/6 BEAS 144.00 18.00 49.0 3306 1200 77° 78' 31° 40' R 120 2.28 3.51 5.93 2054 3163 5336
245 H.P. KULU KOTLU 53 E/5,6 BEAS 25.50 5.50 19.5 3662 1600 77° 23' 31° 46' R 120 0.51 0.78 1.32 457 704 1187
246 H.P. KULU KURPAN 53 E/10 KURPAN GAD
SATLUJ 91.4 16.1 42.4 5148 800 77-34-00 31-32-15 RF 120 1.54 2.37 4.00 1384 2132 3596
247 H.P. KULU KYALI 53 E/7,11 SATLUJ 20.80 5.00 16.0 2926 1200 77° 33' 31° 27' R 160 0.43 0.66 1.11 511 786 1327
248 H.P. KULU LAPAH 53 E/5,6 BEAS 24.30 6.50 18.0 3954 1800 77° 26' 31° 47' S,R 80 0.49 0.75 1.27 292 450 759
249 H.P. KULU MAHUL 53 E/1 BEAS 55.50 8.50 28.0 3281 1200 77° 7' 31° 55' R 80 1.00 1.54 2.59 599 922 1555
250 H.P. KULU MALANA 52 H/4,8 BEAS 146.50 19.00 53.5 5229 1379 77° 14' 32° 0' S,G,R 80 2.32 3.57 6.02 1390 2140 3611
251 H.P. KULU MANALSU 52 H/3,4 BEAS 101.50 20.00 45.0 5516 1920 77° 11' 32° 15' S,G,R 160 1.68 2.59 4.38 2022 3113 5252
252 H.P. KULU MANDROI 52 H/4 BEAS 15.30 5.50 15.0 3735 1400 77° 8' 32° 2' R 240 0.33 0.50 0.85 587 903 1524
253 H.P. KULU MARAUR 53 E/9,10 BEAS 14.50 4.00 15.0 5120 2600 77° 32' 32° 47' S,G,R 120 0.31 0.48 0.81 280 431 727
254 H.P. KULU NASHALA 52 H/4 BEAS 13.00 8.00 18.0 3822 1500 77° 8' 32° 5' R 160 0.28 0.44 0.74 340 523 882
255 H.P. KULU NASUN 52 D/16 SARBARI KHAD
SARBARI KHAD
29.5 5.5 20.8 4603 76-59-00 32-03-30 RF 260 0.58 0.89 1.50 1124 1730 2920
256 H.P. KULU OGAN 53 E/10,11 SATLUJ 21.30 5.00 17.5 3600 1400 77° 33' 31° 29' R 120 0.43 0.67 1.13 391 602 1016
257 H.P. KULU PAKHNOJ 52 H/4,8 BEAS 38.80 6.00 26.0 4973 1600 77° 10' 32° 8' S,R 80 0.73 1.13 1.90 439 675 1140
258 H.P. KULU PALACHAN 53 E/6 10 BEAS 96.00 20.00 61.0 4477 1560 77° 26' 31° 38' R 160 1.61 2.47 4.17 1926 2966 5004
259 H.P. KULU PARINI 52 H/4,8 BEAS 14.00 7.50 16.5 4400 1800 77° 11' 32° 13' R 40 0.30 0.46 0.78 91 139 235
260 H.P. KULU PARVATI 53 E/9,13 BEAS 213.00 4.00 58.5 6248 3915 77° 44' 31° 55' S,G,R 40 3.21 4.94 8.33 962 1481 2499
261 H.P. KULU PHOJAL 52 D/16, H/4 BEAS 138.00 13.50 42.5 5161 1400 77° 8' 32° 6' S,R 50 2.20 3.39 5.71 825 1270 2143
262 H.P. KULU RAHLA 52 H/3 SHELASAR N.
BEAS 17.4 5.65 14.2 4814 2920 77-12-00 32-20-00 RF 200 0.36 0.56 0.95 547 842 1420
263 H.P. KULU RAOGI 52 H/4 BEAS 11.80 5.50 15.0 3680 1400 77° 8' 32° 3' R 320 0.26 0.40 0.68 624 961 1622
264 H.P. KULU RASHKAR 52 H/8 PARBATI 9.00 5.50 15.5 4958 1840 77° 22' 32° 1' R 80 0.21 0.32 0.53 123 190 321
265 H.P. KULU RIASA 53 E/5,9 BEAS 18.80 4.50 17.5 4970 2340 77° 31' 31° 47' S,R 480 0.39 0.60 1.01 1403 2160 3645
266 H.P. KULU SAINI 53 E/9,10,13,14 BEAS 240.00 12.00 61.0 6127 2760 77° 34' 31° 48' S,G,R 50 3.56 5.48 9.24 1334 2053 3464
267 H.P. KULU SANJOIN 52 H/4 BEAS 80.00 11.00 35.5 4794 1498 77° 9' 32° 7' S,R 80 1.37 2.11 3.56 822 1266 2136
268 H.P. KULU SARBARI 52 D/16, H/4 BEAS 90.50 11.00 34.0 4603 1800 77° 1' 32° 0' S,R 80 1.53 2.35 3.96 915 1409 2377
269 H.P. KULU SECHI 53 E/10,11 SATLUJ 87.30 24.00 31.5 4689 1320 77° 42' 31° 30' S,R 80 1.48 2.28 3.84 887 1366 2304
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
10
S.No. STATE DISTRICT CATCHMENT RTS STM BSN A Sq Km
L Km
P Km
Zh m
Zl m
LON LAT FED HEAD Dependable Discharge Power
90% 75% 50% 90% 75% 50%
270 H.P. KULU SHAGAR 53 E/5,9 BEAS 20.30 5.50 15.0 4568 2000 77° 28' 31° 47' S,R 160 0.42 0.64 1.08 500 770 1299
271 H.P. KULU SHAKTI 53 E/5,6,9 BEAS 20.50 5.50 17.5 4475 2400 77° 29' 31° 48' S,R 400 0.42 0.65 1.09 1261 1941 3275
272 H.P. KULU SHAT 53 E/1,5 PARBATI 37.00 11.00 27.5 3855 1320 77° 12' 31° 58' R 80 0.70 1.08 1.82 421 648 1094
273 H.P. KULU SHIRI 53 E/1 BEAS 21.80 3.50 17.0 2997 1040 77° 11' 31° 49' R 80 0.44 0.68 1.15 266 409 691
274 H.P. KULU SHIRIR 52 H/4 BEAS 35.50 11.00 24.5 4241 1400 77° 8' 32° 3' S,R 80 0.68 1.04 1.76 406 625 1055
275 H.P. KULU SOLANG 52 H/3 BEAS KHAD BEAS R. 103.4 10.5 41.6 5932 2360 77-09-00 32-19-30 RF 240 1.71 2.64 4.45 3082 4745 8006
276 H.P. KULU SUMUN 53 E/10,11 SATLUJ 17.80 4.50 15.0 3571 1000 77° 37' 31° 27' R 200 0.37 0.57 0.97 558 858 1448
277 H.P. KULU TANANG 53 E/9 BEAS 54.50 4.00 25.0 5479 3200 77° 33' 31° 58' S,G,R 280 0.98 1.51 2.55 2062 3175 5357
278 H.P. KULU TICHU 52 H/8,12 BEAS 127.30 3.00 54.0 6395 2990 77° 30' 32° 3' S,G,R 240 2.05 3.16 5.33 3691 5684 9590
279 H.P. KULU TIRTHAN 52 E/6,10 BEAS 192.50 17.00 63.5 5148 1600 77° 26' 31° 38' S,G,R 80 2.94 4.52 7.63 1762 2713 4577
280 H.P. KULU TOS 52 H/8,12 BEAS 51.00 5.00 32.5 6260 2990 77° 29' 32° 3' S,G,R 160 0.93 1.43 2.41 1112 1713 2890
281 H.P. KULU TUNDABHUJ 53 E/9 BEAS 19.00 5.00 19.0 5550 3285 77° 35' 31° 58' S,G,R 240 0.39 0.61 1.02 708 1090 1839
282 H.P. LAHUL SPITI
BAGRARI 52 D/13 H/1 CHENAB 321.50 13.50 77.0 6310 4200 77° 5' 32° 50' S,G,R 80 4.58 7.06 11.91 2750 4234 7145
283 H.P. LAHUL SPITI
BILING LUNGPA 52 D/14, H/2 CHENAB 109.80 16.50 50.0 6045 3200 77° 1' 32° 34' S,G,R 200 1.80 2.78 4.69 2706 4166 7029
284 H.P. LAHUL SPITI
CHACHI 52 H/2 CHENAB 16.00 4.50 17.0 5682 3600 77° 9' 32° 37' S,R 280 0.34 0.52 0.88 712 1096 1849
285 H.P. LAHUL SPITI
CHHALLO PATH 52 H/1,2 CHENAB 26.80 6.00 24.5 6055 3700 77° 9' 32° 45' S,G,R 360 0.53 0.82 1.38 1432 2204 3719
286 H.P. LAHUL SPITI
CHHAPOR 52 H/2 CHENAB 12.00 3.00 14.5 3132 5765 77° 35' 32° 7' S,G,R 200 0.26 0.41 0.69 396 610 1029
287 H.P. LAHUL SPITI
CHHATRU 52 H/7 CHANDRA 55.80 5.00 31.0 5861 3400 77° 22' 32° 19' S,G,R 160 1.00 1.54 2.60 1203 1852 3124
288 H.P. LAHUL SPITI
CHHUNDI TOKPO 52 L/4,8, 53 I/1,4 SPITI 69.30 14.00 41.5 5989 3400 78° 15' 32° 3' S,G,R 200 1.21 1.86 3.14 1814 2794 4714
289 H.P. LAHUL SPITI
CHUD 52 L/4 SPITI 20.50 6.00 20.0 5853 3600 78° 5' 32° 3' S,G,R 160 0.42 0.65 1.09 504 776 1310
290 H.P. LAHUL SPITI
CHULING 52 D/10,14 CHENAB 11.50 5.70 14.5 5130 2680 76° 43' 32° 41 S,G,R 440 0.25 0.39 0.66 839 1293 2181
291 H.P. LAHUL SPITI
DALI 52 D/13, H/1,2 CHENAB 78.80 5.50 37.5 6045 4000 77° 5' 32° 50' S,G,R 120 1.35 2.08 3.51 1217 1874 3162
292 H.P. LAHUL SPITI
DAMPHUG 52 H/3,7 CHANDRA 25.00 6.50 19.0 5852 3160 77° 14' 32° 25' S,G,R 280 0.50 0.77 1.30 1048 1614 2723
293 H.P. LAHUL SPITI
DEBSA 52 H/16, 53 E/13 SPITI 117.80 13.00 60.0 6507 3345 77° 55' 32° 2' S,G,R 40 1.92 2.95 4.98 575 886 1494
294 H.P. LAHUL SPITI
DHUBAK 52 L/8 SPITI 27.80 7.00 21.0 6237 3233 78° 25' 32° 5' S,G,R 80 0.55 0.84 1.42 328 506 853
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
11
S.No. STATE DISTRICT CATCHMENT RTS STM BSN A Sq Km
L Km
P Km
Zh m
Zl m
LON LAT FED HEAD Dependable Discharge Power
90% 75% 50% 90% 75% 50%
295 H.P. LAHUL SPITI
DHUMUDUR 53 I/1 SPITI 29.80 7.00 26.0 5848 3870 78° 1' 31° 53' S,G,R 160 0.58 0.90 1.51 698 1074 1813
296 H.P. LAHUL SPITI
DUGLI 52 H/7 CHANDRA 83.50 6.50 36.5 5820 3170 77° 16' 32° 23' S,G,R 160 1.42 2.19 3.69 1707 2628 4433
297 H.P. LAHUL SPITI
GALI 52 D/10 CHENAB 41.80 6.00 30.0 6108 2440 76° 44' 32° 45' S,G,R 120 0.78 1.20 2.03 702 1081 1824
298 H.P. LAHUL SPITI
GHAR 52 D/10 ,14 CHENAB 56.30 7.00 32.0 6780 2720 76° 47' 32° 40' S,G,R 200 1.01 1.56 2.62 1515 2333 3936
299 H.P. LAHUL SPITI
GHURGHUR 53 I/1 SPITI 54.80 9.00 34.0 5848 3890 78° 0' 31° 52' S,G,R 80 0.99 1.52 2.56 592 911 1538
300 H.P. LAHUL SPITI
GYUNDI 52 H/11,12,15,16 SPITI 321.00 26.00 77.5 6150 3710 77° 56' 32° 20' S,G,R 40 4.58 7.05 11.89 1373 2114 3567
301 H.P. LAHUL SPITI
HAMTAH 52 H/7,8 CHANDRA 36.00 1.50 25.0 6221 3400 77° 23' 32° 18' S,G,R 280 0.69 1.05 1.78 1439 2215 3737
302 H.P. LAHUL SPITI
HULAT 52 D/10,13,14 CHENAB 39.30 4.50 26.0 5598 2800 76° 42' 32° 45' S,G,R 160 0.74 1.14 1.92 887 1366 2305
303 H.P. LAHUL SPITI
JAHLMA 52 D/14 CHENAB 32.80 6.00 23.0 5970 2735 76° 52' 31° 37' S,G,R 160 0.63 0.97 1.64 758 1168 1970
304 H.P. LAHUL SPITI
JANKAR 52 H/1 CHENAB 106.50 15.00 45.0 6318 3941 77° 7' 32° 48' S,G,R 240 1.76 2.70 4.56 3162 4868 8214
305 H.P. LAHUL SPITI
KAJA 52 L/3,4 SPITI 25.30 6.00 20.0 4955 3400 78° 4' 32° 3' S,R 200 0.50 0.78 1.31 757 1165 1965
306 H.P. LAHUL SPITI
KELAS LUNGPA 52 H/2 CHENAB 46.00 6.00 35.0 6055 3600 77° 10' 32° 43' S,G,R 280 0.85 1.30 2.20 1780 2740 4624
307 H.P. LAHUL SPITI
KHAMENGAR 52 H/16, 53 E/13 SPITI 179.00 9.00 52.0 6526 3845 77° 55' 32° 2' S,G,R 80 2.76 4.24 7.16 1654 2547 4297
308 H.P. LAHUL SPITI
KHE 52 D/10 CHENAB 32.80 5.00 29.0 5740 2680 76° 42' 32° 41' S,G,R 120 0.63 0.97 1.64 569 876 1477
309 H.P. LAHUL SPITI
KIAMO 52 H/15 SPITI 16.00 5.00 18.5 5820 3960 77° 50' 32° 27' S,G,R 280 0.34 0.52 0.88 712 1096 1849
310 H.P. LAHUL SPITI
KIDLU 52 H/16, L/4 SPITI 61.00 8.50 32.0 6011 3600 78° 1' 32° 3' S,G,R 120 1.08 1.67 2.81 975 1501 2532
311 H.P. LAHUL SPITI
KILLUNG 52 H/16, 53 E/13 SPITI 117.50 11.00 41.0 6080 3753 77° 57' 32° 3' S,G,R 40 1.91 2.95 4.97 574 884 1491
312 H.P. LAHUL SPITI
KIRGARANG 52 L/4 SPITI 19.50 3.50 16.0 5415 3520 78° 8' 32° 5' S,R 120 0.40 0.62 1.05 362 558 941
313 H.P. LAHUL SPITI
LARA 52 L/4 SPITI 12.00 3.00 15.0 5201 3680 76° 8' 32° 9' S,R 240 0.26 0.41 0.69 475 732 1234
314 H.P. LAHUL SPITI
LARNETTAR 52 H/7 CHANDRA 54.30 6.00 28.5 6044 3400 77° 26' 32° 18' S,G,R 280 0.98 1.51 2.54 2055 3165 5340
315 H.P. LAHUL SPITI
LINGTI 52 L/3,4,7,8 SPITI 379.80 15.50 73.5 5900 3520 78° 11' 32° 7' S,G,R 40 5.30 8.16 13.76 1589 2447 4128
316 H.P. LAHUL SPITI
LINQAR 52 D/14 CHENAB 30.80 7.00 21.0 5782 3040 76° 55' 32° 37' S,G,R 160 0.60 0.92 1.55 718 1105 1865
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
12
S.No. STATE DISTRICT CATCHMENT RTS STM BSN A Sq Km
L Km
P Km
Zh m
Zl m
LON LAT FED HEAD Dependable Discharge Power
90% 75% 50% 90% 75% 50%
317 H.P. LAHUL SPITI
LOT 52 D/14 CHENAB 19.50 6.00 19.0 5800 2840 76° 57' 32° 36' S,G,R 280 0.40 0.62 1.05 845 1301 2195
318 H.P. LAHUL SPITI
LUMPHU 52 H/7 CHANDRA 30.50 7.00 28.0 5506 3204 77° 15' 32° 24' S,G,R 360 0.59 0.91 1.54 1602 2466 4161
319 H.P. LAHUL SPITI
MANGWAN 52 H/2 CHENAB 22.50 5.50 22.0 5914 2936 77° 3' 32° 34' S,G,R 200 0.46 0.70 1.18 683 1052 1775
320 H.P. LAHUL SPITI
MARSHEN 52 H/2 CHENAB 13.00 5.50 17.0 5478 3259 77° 10' 32° 37' S,R 480 0.28 0.44 0.74 1019 1568 2646
321 H.P. LAHUL SPITI
ME 52 D/10 CHENAB 45.30 5.00 28.0 5783 2640 76° 41' 32° 42' S,G,R 280 0.84 1.29 2.17 1756 2704 4563
322 H.P. LAHUL SPITI
MILANG 52 H/2,6 CHENAB 23.30 5.00 21.0 6150 3400 77° 13' 32° 39' S,G,R 40 0.47 0.72 1.22 141 217 366
323 H.P. LAHUL SPITI
MILANG 52 H/2,6,7 CHENAB 274.00 16.50 75.0 6517 3269 77° 13' 32° 40' S,G,R 50 3.99 6.14 10.36 1496 2304 3887
324 H.P. LAHUL SPITI
MULING 52 D/14,15 CHENAB 47.00 8.00 31.0 6023 3200 76° 58' 32° 32' S,G,R 120 0.86 1.33 2.24 777 1197 2019
325 H.P. LAHUL SPITI
MUNCHI 52 H/2 CHENAB 9.30 3.00 13.5 5859 3200 77° 8' 32° 35' S,G,R 400 0.21 0.33 0.55 635 977 1649
326 H.P. LAHUL SPITI
MUR 52 D/10 CHENAB 30.50 5.00 28.0 5532 2640 76° 40' 32° 43' S,G,R 320 0.59 0.91 1.54 1424 2192 3699
327 H.P. LAHUL SPITI
NALDA 52 D/14 CHENAB 44.50 4.00 29.0 5486 2760 76° 50' 31° 38' S,G,R 240 0.82 1.27 2.14 1482 2282 3851
328 H.P. LAHUL SPITI
NILGAHR 52 D/14,15, H/2,3 CHENAB 67.00 4.00 35.0 6200 2877 77° 0' 32° 30' S,G,R 200 1.17 1.81 3.05 1762 2713 4578
329 H.P. LAHUL SPITI
NU LUNGPA 52 H/15 SPITI 19.80 8.00 20.5 5770 3800 77° 56' 32° 23' R 280 0.41 0.63 1.06 856 1318 2224
330 H.P. LAHUL SPITI
POH 52 L/8 SPITI 21.00 8.00 19.0 5901 3400 78° 19' 32° 3' S,R 200 0.43 0.66 1.11 644 991 1672
331 H.P. LAHUL SPITI
POMARANG 52 L/8, 53 I/5 SPITI 94.30 15.00 44.0 6118 3400 78° 19' 32° 3' S,G,R 200 1.58 2.43 4.11 2371 3650 6159
332 H.P. LAHUL SPITI
PURI 52 H/15, L/3 SPITI 176.30 22.00 63.0 6184 3560 78° 0' 32° 18' S,G,R 80 2.72 4.19 7.07 1632 2514 4241
333 H.P. LAHUL SPITI
ROMKHANGZA 52 H/2 CHENAB 12.00 2.00 5.5 6053 3174 77° 8' 32° 36' S,G,R 400 0.26 0.41 0.69 792 1219 2057
334 H.P. LAHUL SPITI
SAKCHUM 52 H/7,8 CHANDRA 72.30 1.50 33.0 5890 3400 77° 26' 32° 18' S,G,R 240 1.25 1.93 3.26 2259 3478 5868
335 H.P. LAHUL SPITI
SALE 52 C/12 CHENAB 16.50 7.50 20.0 5488 2600 76° 32' 32° 59' S,R 200 0.35 0.54 0.90 522 804 1356
336 H.P. LAHUL SPITI
SALPAT 52 D/10 CHENAB 36.30 5.00 30.0 5993 2600 76° 38' 32° 44' S,G,R 400 0.69 1.06 1.79 2070 3187 5378
337 H.P. LAHUL SPITI
SARCHU 52 H/9 YAMUNA 115.80 10.00 36.0 5828 4251 77° 35' 32° 55' S,G,R 140 1.89 2.91 4.91 1983 3054 5153
338 H.P. LAHUL SPITI
SHANSHA 52 D/14 CHENAB 66.80 9.00 35.0 6135 2775 76° 55' 32° 37' S,G,R 480 1.17 1.80 3.04 4218 6494 10958
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
13
S.No. STATE DISTRICT CATCHMENT RTS STM BSN A Sq Km
L Km
P Km
Zh m
Zl m
LON LAT FED HEAD Dependable Discharge Power
90% 75% 50% 90% 75% 50%
339 H.P. LAHUL SPITI
SHASHIN 52 H/3 CHANDRA 16.80 3.00 20.0 6200 3000 77° 7' 32° 28' S,G,R 400 0.35 0.54 0.92 1061 1633 2755
340 H.P. LAHUL SPITI
SHILA 52 L/3,4 SPITI 196.80 13.00 55.0 6263 3520 78° 3' 32° 15' S,G,R 80 2.99 4.61 7.78 1796 2765 4666
341 H.P. LAHUL SPITI
SHIPTING 52 D/14 CHENAB 50.80 5.50 30.0 6058 3200 76° 58' 32° 32' S,G,R 160 0.92 1.42 2.40 1109 1707 2880
342 H.P. LAHUL SPITI
SIRIA 52 D/13,14 CHENAB 20.50 2.50 17.5 6172 3560 76° 51' 32° 43' S,G,R 200 0.42 0.65 1.09 630 970 1637
343 H.P. LAHUL SPITI
SISSU 52 H/2,3,6,7 CHENAB 107.80 13.00 43.5 6053 3053 77° 7' 32° 29' S,G,R 200 1.78 2.73 4.61 2663 4100 6917
344 H.P. LAHUL SPITI
SISSU 52 H/3 CHANDRA 35.00 5.50 23.0 6069 3024 77° 7' 32° 28' S,G,R 120 0.67 1.03 1.74 602 926 1563
345 H.P. LAHUL SPITI
SUVITA 52 H/11,15 SPITI 45.00 7.00 29.5 6265 3800 77° 45' 32° 27' S,G,R 120 0.83 1.28 2.16 748 1152 1944
346 H.P. LAHUL SPITI
TAKPACHAN 52 H/1,2 CHENAB 25.00 7.00 20.5 5842 3703 77° 8' 32° 1' S,G,R 400 0.50 0.77 1.30 1498 2306 3890
347 H.P. LAHUL SPITI
TANGTI 52 L/4, 53 I/1 SPITI 12.00 4.00 15.0 5925 3600 78° 6' 32° 3' S,G,R 400 0.26 0.41 0.69 792 1219 2057
348 H.P. LAHUL SPITI
THANGA 52 L/8 SPITI 85.00 7.00 35.0 6055 3258 78° 22' 32° 5' S,R 80 1.44 2.22 3.75 867 1334 2251
349 H.P. LAHUL SPITI
THIROT 52 D/13,14 CHENAB 117.50 10.50 40.5 6001 3400 76° 52' 32° 43' S,G,R 120 1.91 2.95 4.97 1722 2651 4473
350 H.P. LAHUL SPITI
THOKPO 52 L/8 SPITI 13.80 4.50 14.0 5757 3233 78° 25' 32° 5' S,R 280 0.30 0.46 0.77 626 964 1626
351 H.P. LAHUL SPITI
THUNG CHHU 52 H/2 CHENAB 19.50 5.50 21.5 5883 3720 77° 9' 32° 44' S,G,R 440 0.40 0.62 1.05 1328 2044 3449
352 H.P. LAHUL SPITI
TINGAL 52 H/2,6 40.50 5.70 27.5 6053 3260 77° 11' 32° 38' S,G,R 240 0.76 1.17 1.97 1366 2103 3548
353 H.P. LAHUL SPITI
TIPTA 52 L/8 SPITI 16.50 6.50 17.5 6327 3186 78° 27' 32° 3' S,R 160 0.35 0.54 0.90 418 643 1085
354 H.P. LAHUL SPITI
TOKPO 52 H/15 SPITI 14.30 5.50 16.5 6075 4200 77° 50' 32° 26' S,G,R 360 0.31 0.47 0.80 830 1278 2156
355 H.P. LAHUL SPITI
TUNGU LUMPA 52 H/7 CHANDRA 26.30 3.00 22.0 5622 3200 77° 18' 32° 22' S,G,R 400 0.52 0.80 1.36 1565 2410 4066
356 H.P. LAHUL SPITI
ULA 52 L/4 SPITI 79.50 6.50 30.0 5685 3560 78° 5' 32° 11' S,R 160 1.36 2.10 3.54 1635 2518 4248
357 H.P. LAHUL SPITI
YAKTA 52 L/8 SPITI 12.50 3.00 15.0 5901 3320 78° 21' 32° 4' S,R 200 0.27 0.42 0.71 410 632 1066
358 H.P. LAHUL SPITI
YANG CHO 52 L/8, 53 I/4 SPITI 51.30 12.50 33.5 6593 3400 78° 1' 32° 2' S,G,R 160 0.93 1.43 2.42 1118 1721 2904
359 H.P. LAHUL&SPITI
THIROT N. 52 D/13,14 THIROT N. CHANDRA BHAGA
155.2 14 56.1 6172 2720 76-50-00 32-42-00 RF 140 2.44 3.75 6.33 2558 3938 6644
360 H.P. MANDI ANNUN 53 E/3 ANNUNKI KI KHAD
SATLUJ R. 69.6 16.7 42.4 3082 592 77-02-30 31-22-00 RF 240 1.21 1.87 3.15 2186 3365 5678
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
14
S.No. STATE DISTRICT CATCHMENT RTS STM BSN A Sq Km
L Km
P Km
Zh m
Zl m
LON LAT FED HEAD Dependable Discharge Power
90% 75% 50% 90% 75% 50%
361 H.P. MANDI ANNUN 53 E/3 SATLUJ 219.80 25.50 66.0 3208 800 77° 3' 31° 18' R 40 3.29 5.07 8.56 988 1522 2568
362 H.P. MANDI ARNODI 53 A/13,14 BEAS 46.30 13.00 30.0 2051 620 76° 50' 31° 50' R 40 0.85 1.31 2.21 256 394 664
363 H.P. MANDI ARTHI 53 A/13 BEAS 27.00 13.50 20.5 2770 860 76° 48' 31° 56' R 40 0.53 0.82 1.39 160 247 416
364 H.P. MANDI AUNI KHAD 53 A/13 AUNI KHAD BEAS 75.7 12.7 39.9 2130 540 76-51-30 31-52-00 RF 40 1.31 2.01 3.39 392 603 1018
365 H.P. MANDI BAJGAR 53 A/13 GAGLI 40.00 14.50 32.7 3122 960 76° 46' 31° 57' R 20 0.75 1.16 1.95 113 173 293
366 H.P. MANDI BAKHLI 53 E/2 BEAS 253.00 35.00 64.5 3019 828 77° 5' 31° 40' R 40 3.72 5.73 9.67 1117 1720 2901
367 H.P. MANDI BEAS 53 E/1,2 BEAS 36.00 23.00 27.0 2773 800 77° 3' 31° 40' R 40 0.69 1.05 1.78 206 316 534
368 H.P. MANDI BEHRI 53 E/2,3 JUNI KHAD BEAS R. 72.2 14.1 35.4 3255 800 77-02-30 31-32-30 RF 120 1.25 1.93 3.26 1128 1737 2931
369 H.P. MANDI CHAINRE 52 E/3,7 SATLUJ 161.00 25.00 60.0 2922 720 77° 17' 31° 16' R 40 2.51 3.87 6.53 754 1162 1960
370 H.P. MANDI CHHATRI 53 E/6,7 SATLUJ 151.30 11.50 45.5 3042 1000 77° 23' 31° 25' R 40 2.38 3.67 6.19 715 1101 1857
371 H.P. MANDI DARI 53 E/2,3 JUNI KHAD BEAS R. 65.99 11.2 32.5 3255 800 77-04-00 31-32-00 RF 80 1.16 1.79 3.01 696 1071 1807
372 H.P. MANDI DEV KI KHAD 53 A/13 BEAS 26.80 6.00 24.0 1442 700 77° 55' 31° 47' R 60 0.53 0.82 1.38 239 367 620
373 H.P. MANDI DULCHI 53 E/1 BEAS 69.50 9.50 35.0 2911 1080 77° 0' 31° 47' R 40 1.21 1.87 3.15 364 560 945
374 H.P. MANDI GOHAR 53 E/2 BEAS 18.80 5.00 19.0 2683 1200 77° 3' 31° 35' R 120 0.39 0.60 1.01 351 540 911
375 H.P. MANDI GURAHAN 53 E/2 BEAS 40.00 17.30 27.5 3047 920 77° 10' 31°42' R 140 0.75 1.16 1.95 788 1214 2048
376 H.P. MANDI KASANI 53 A/13,14 BEAS 17.80 6.00 18.0 1400 663 76° 53' 31° 53' R 40 0.37 0.57 0.97 112 172 290
377 H.P. MANDI RATTI 53 A/14 BEAS 98.50 18.50 46.5 1548 800 76° 54' 31° 36' R 20 1.64 2.53 4.26 246 379 640
378 H.P. MANDI ROOLANG 53 D/16 BEAS 224.00 34.00 66.5 5194 1840 76° 50' 32° 2' S,G,R 40 3.35 5.16 8.70 1005 1547 2610
379 H.P. MANDI SANGROI 53 E/3 SATLUJ 37.30 11.50 26.0 1901 760 77° 4' 31° 16' R 40 0.71 1.09 1.84 212 326 551
380 H.P. MANDI SHUSHANG 53 A/13, E/1 BEAS 30.00 8.50 21.5 3234 1320 76° 56' 31° 54' R 120 0.58 0.90 1.52 526 810 1367
381 H.P. MANDI SUN 53 A/9,13,14 BEAS 212.30 23.00 64.5 2051 600 76° 46' 31° 49' R 20 3.20 4.92 8.31 480 738 1246
382 H.P. SHIMLA ALWANG 53 E/12 GIRI 34.50 9.00 23.0 3031 1640 76° 33' 31° 7' R 120 0.66 1.02 1.72 594 915 1544
383 H.P. SHIMLA BADIVARA 53 E/15,16 MASROT GAD
PABAR R. 92.3 14.9 40.7 4314 1640 77-49-30 31-13-00 RF 40 1.55 2.39 4.03 465 717 1209
384 H.P. SHIMLA BAHLU KATALI 53 F/9 TONS 43.00 11.00 26.0 2540 1314 77° 36' 30° 49' R 40 0.80 1.23 2.08 240 369 623
385 H.P. SHIMLA BANAH SWOL 53 F/5,9 TONS 78.50 35.00 20.0 3506 1314 77° 36' 30° 49' R 80 1.35 2.08 3.50 809 1245 2101
386 H.P. SHIMLA BASARI 53 F/5 GIRI 89.00 18.00 41.5 3447 1200 77° 25' 31° 0' R 40 1.50 2.31 3.90 451 694 1171
387 H.P. SHIMLA BASKALLTI 53 E/12 PABBAR 59.50 12.00 32.0 2796 1480 77° 45' 31° 5' R 80 1.06 1.63 2.75 636 979 1652
388 H.P. SHIMLA BASRU 53 I/4 TONS 15.00 6.00 15.0 4065 2040 78° 6' 31° 13' S,R 160 0.32 0.49 0.83 384 592 999
389 H.P. SHIMLA BATHORA 53 E/7,8 SATLUJ 28.50 8.00 22.0 2862 720 77° 18' 31° 17' R 120 0.56 0.86 1.45 503 775 1308
390 H.P. SHIMLA BHERA 53 E/11 SATLUJ 72.00 11.50 36.0 3890 840 77° 31' 31° 21 R 80 1.25 1.93 3.25 750 1155 1949
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
15
S.No. STATE DISTRICT CATCHMENT RTS STM BSN A Sq Km
L Km
P Km
Zh m
Zl m
LON LAT FED HEAD Dependable Discharge Power
90% 75% 50% 90% 75% 50%
391 H.P. SHIMLA CHAGAUNTI 52 E/8,12 GIRI 98.50 15.00 42.5 3203 1520 77° 30' 31° 7' R 40 1.64 2.53 4.26 492 758 1279
392 H.P. SHIMLA CHAKRED 53 E/8, F/5 GIRI 68.80 18.00 31.5 2731 1040 77° 19' 30° 58' R 160 1.20 1.85 3.12 1442 2221 3747
393 H.P. SHIMLA CHAPALA 53 E/7 SATLUJ 25.00 8.00 18.0 2975 720 77° 20' 31° 18' R 160 0.50 0.77 1.30 599 922 1556
394 H.P. SHIMLA CHEHAR 53 E/12 GIRI 59.30 11.00 38.0 3358 1640 77° 32' 31° 7' R 80 1.06 1.63 2.74 634 976 1647
395 H.P. SHIMLA CHHOTI 53 E/8,12 GIRI 72.30 13.00 40.0 3009 1187 77° 22' 31° 4' R 40 1.25 1.93 3.26 376 580 978
396 H.P. SHIMLA CHICHWARI 53 E/15 SHATUL KHAD
ANDHRA KHAD
47.8 12.7 29.4 5099 2320 77-55-30 31-20-30 RF 200 0.88 1.35 2.28 1314 2024 3415
397 H.P. SHIMLA DEVIDHAR 53 E/15 MASRAT GAD
PABAR 48.68 6.77 28.94 4314 1800 77-48-30 31-16-30 RF 80 0.89 1.37 2.31 534 822 1388
398 H.P. SHIMLA DEYA 53 F/9 NATI 15.00 9.50 17.3 4321 1200 77° 38' 30° 54' R 40 0.32 0.49 0.83 96 148 250
399 H.P. SHIMLA DHURMU 53 E/7 SATLUJ 73.30 11.00 35.0 2578 760 77° 21' 31° 21' R 80 1.27 1.96 3.30 762 1173 1980
400 H.P. SHIMLA DIWDI 53 E/15,I/3 PABAR PABAR 188.7 19 67.7 5141 1995 78-00-00 31-16-40 RF 280 2.89 4.44 7.50 6061 9332 15746
401 H.P. SHIMLA DOGAR 53 E/11 SATLUJ 64.00 17.50 31.7 3090 1280 77° 36' 31° 22' R 40 1.13 1.74 2.93 339 521 880
402 H.P. SHIMLA DOGRA 53 E/11,12 PABAR 128.30 20.00 50.0 3248 1440 77° 45' 31° 9' R 40 2.06 3.18 5.36 619 954 1609
403 H.P. SHIMLA DOGRI 53 E/12 PABBAR 118.00 19.00 47.0 2999 1446 77° 45' 31° 9' R 40 1.92 2.96 4.99 576 887 1496
404 H.P. SHIMLA GANWI 52 E/10,14 SATLUJ 127.50 15.00 46.5 5672 1155 77° 47' 31° 32' S,G,R 100 2.05 3.16 5.33 1540 2371 4001
405 H.P. SHIMLA GHATAGULI 53 E/11 NOGLI 20.00 6.50 17.5 3240 1255 77° 42' 31° 23' R 160 0.41 0.63 1.07 494 760 1282
406 H.P. SHIMLA GHUI 53 E/8 GIRI 24.30 6.00 17.0 2496 1187 77° 22' 31° 4' R 120 0.49 0.75 1.27 438 675 1139
407 H.P. SHIMLA GUMALTI 53 E/16 PABAR 39.00 7.00 25.0 4046 1880 77° 55' 31° 14' R 100 0.73 1.13 1.91 551 848 1431
408 H.P. SHIMLA HAMAL 53 F/9 TONS 103.00 21.30 42.0 2852 1232 77° 37' 30° 56' R 40 1.71 2.63 4.43 512 788 1330
409 H.P. SHIMLA HORL 53 I/3 TONS 40.00 9.00 27.0 3940 1825 78° 4' 31° 12' R 200 0.75 1.16 1.95 1126 1734 2925
410 H.P. SHIMLA JAKHI 53 E/16 PABBAR 30.00 8.50 22.0 3373 1320 77° 47' 31° 5' R 200 0.58 0.90 1.52 877 1351 2279
411 H.P. SHIMLA JAWAL 53 E/15 ANDHRA KHAD
PABAR N. 90 14.7 50.9 4609 1738 77-53-30 31-19-30 RF 130 1.52 2.34 3.94 1480 2278 3844
412 H.P. SHIMLA KASHTA 53 E/16 PABBAR 15.00 6.00 15.7 3324 1400 77° 50' 31° 2' R 160 0.32 0.49 0.83 384 592 999
413 H.P. SHIMLA KATHANG 53 E/16, F/13 PABAR 24.50 4.00 19.5 3151 1160 77° 50' 30° 59' R 100 0.49 0.76 1.27 368 566 956
414 H.P. SHIMLA KHAGNA 53 F/9 TONS 21.00 5.70 20.5 3038 0 77° 34' 30° 56' R 80 0.43 0.66 1.11 257 396 669
415 H.P. SHIMLA KHANALI 53 E/8 GIRI 15.80 9.00 17.0 2351 1180 77° 23' 31° 4' R 160 0.34 0.52 0.87 402 619 1045
416 H.P. SHIMLA KHANETI 53 E/7 SATLUJ 40.30 8.00 28.0 2766 776 77° 27' 31° 27' R 240 0.76 1.16 1.96 1360 2094 3533
417 H.P. SHIMLA KHANYARA 53 E/15 PABBAR 42.00 7.00 18.5 3993 2000 77° 57' 31° 15' R 160 0.78 1.21 2.03 940 1447 2442
418 H.P. SHIMLA KIONGAL 53 E/7 SATLUJ 45.00 10.50 28.7 2975 800 77° 25' 31° 20' R 320 0.83 1.28 2.16 1996 3073 5184
419 H.P. SHIMLA KIYAR 53 E/8 GIRI 107.50 12.50 42.0 3187 1580 77° 25' 31° 8' R 40 1.77 2.73 4.60 531 818 1380
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
16
S.No. STATE DISTRICT CATCHMENT RTS STM BSN A Sq Km
L Km
P Km
Zh m
Zl m
LON LAT FED HEAD Dependable Discharge Power
90% 75% 50% 90% 75% 50%
420 H.P. SHIMLA KOTAR 53 E/15 PABBAR 25.00 14.50 21.0 4308 2320 77° 58' 31° 23' R 200 0.50 0.77 1.30 749 1153 1945
421 H.P. SHIMLA KUNDA 53 E/7 SATLUJ 8.00 4.00 11.0 2114 800 77° 21' 31° 21' R 160 0.19 0.29 0.48 223 343 579
422 H.P. SHIMLA KUNU 53 E/12,16 PABAR 28.80 9.00 23.5 3387 1400 77° 46' 31° 6' 80 0.56 0.87 1.47 339 521 880
423 H.P. SHIMLA KYARNU 53 F/9 TONS 29.00 10.00 26.0 3317 1392 77° 37' 30° 58' R 120 0.57 0.87 1.48 511 787 1328
424 H.P. SHIMLA MACHHAD 53 E/11 SATLUJ 110.00 28.50 59.5 3460 920 77° 34' 31° 23' R 80 1.81 2.78 4.69 1084 1669 2816
425 H.P. SHIMLA MALGI 53 E/7,8 SATLUJ 28.30 7.00 23.5 2861 800 77° 18' 31° 16' R 200 0.56 0.86 1.44 834 1284 2166
426 H.P. SHIMLA MALIA 53 E/15,I/3 PABAR 14 4.3 15 4389 2480 78-00-00 31-18-00 RF 80 0.30 0.46 0.78 181 279 470
427 H.P. SHIMLA MANGLAD 53 E/11,14,15 SATLUJ 103.30 17.00 46.0 4396 1280 77° 45' 31° 31' S,R 80 1.71 2.63 4.44 1026 1580 2666
428 H.P. SHIMLA MARAGALI 53 F/8 MANAS 15.00 7.00 18.0 2949 1124 77° 37' 30° 48' R 320 0.32 0.49 0.83 769 1184 1998
429 H.P. SHIMLA MASHRAN BARHANU 53 F/9 TONS 93.00 25.50 40.0 3462 1360 77° 40' 30° 57' R 40 1.56 2.40 4.06 468 721 1217
430 H.P. SHIMLA MASRAT 53 E/16, 15 PABBAR 62.00 13.50 40.0 4314 1600 77° 55' 31° 12' R 40 1.10 1.69 2.85 329 507 856
431 H.P. SHIMLA NALIA 53 E/16 PABAR 15.50 5.50 18.0 3324 1400 77° 47' 31° 6' R 200 0.33 0.51 0.86 494 761 1285
432 H.P. SHIMLA NAUTI 53 F/9 TONS 82.00 20.30 44.0 3213 1392 77° 36' 30° 58' R 40 1.40 2.16 3.64 420 647 1091
433 H.P. SHIMLA NOGRI 52 E/15 SATLUJ 104.30 13.50 38.0 5236 1800 72° 47' 31° 24' S,R 160 1.73 2.66 4.48 2070 3187 5378
434 H.P. SHIMLA PAKHAL 53 E/16 PABBAR 27.00 9.50 23.5 3373 1600 77° 80' 31° 12' R 120 0.53 0.82 1.39 480 740 1248
435 H.P. SHIMLA PANDOHA 53 E/7 SATLUJ 41.00 10.00 21.0 2545 760 77° 19' 31° 17' R 40 0.77 1.18 1.99 230 354 598
436 H.P. SHIMLA PEJA 53 E/16 PABBAR 33.30 11.00 29.0 3766 1680 77° 51' 31° 13' R 120 0.64 0.99 1.66 576 887 1497
437 H.P. SHIMLA PEKHA 53 E/15,16,I/3,4 PABAR PABAR 226.14 19.1 68.4 5261 77-58-00 31-15-30 RF 60 3.38 5.20 8.77 1520 2340 3948
438 H.P. SHIMLA RANWI 53 E/12,16 PABAR 18.00 6.50 18.0 3273 1529 77° 45' 31° 8' S,R 120 0.38 0.58 0.98 338 520 878
439 H.P. SHIMLA RUPIN 53 I/3, I/4 TONS 68.00 14.30 41.5 4808 2000 78° 6' 31° 15' R 80 1.19 1.83 3.09 714 1099 1855
440 H.P. SHIMLA SALANTI 53 E/12,16 PABAR 43.30 11.50 29.0 3462 1400 77° 46' 31° 6' R 80 0.80 1.24 2.09 483 743 1253
441 H.P. SHIMLA SARTU 53 E/15 NOGRI 41.00 14.00 24.3 4314 1520 77° 45' 31° 24' R 200 0.77 1.18 1.99 1150 1771 2989
442 H.P. SHIMLA SARU 53 I/4, E/16 TONS 29.80 9.00 22.0 4950 1880 78° 4' 31° 13' S,R 200 0.58 0.90 1.51 872 1343 2266
443 H.P. SHIMLA SHANTHA 53 F/9 TONS 15.00 8.50 19.0 2880 1280 77° 37' 30° 58' R 40 0.32 0.49 0.83 96 148 250
444 H.P. SHIMLA SHATUL 53 E/15 PABBAR 45.00 12.50 30.0 5099 2360 77° 54' 31° 20' R 160 0.83 1.28 2.16 998 1536 2592
445 H.P. SHIMLA SHIKDI 53 E/11,12,15,16 PABAR 125.80 15.50 45.5 3460 1480 77° 45' 31° 12' R 40 2.03 3.13 5.27 609 938 1582
446 H.P. SHIMLA SILRI 53 E/11 NOGLI 12.00 6.00 14.0 3195 1120 77° 40' 31° 24' R 120 0.26 0.41 0.69 238 366 617
447 H.P. SHIMLA SUPIN KHAD 53 I/3 SUPIN KHAD
PABAR N. 43.5 12.7 37 5261 2740 78-00-00 31-19-30 RF 205 0.81 1.24 2.10 1241 1911 3225
448 H.P. SHIMLA TARGALI 53 E/11 NOGLI 41.00 6.50 18.5 2965 1400 77° 45' 31° 23' R 120 0.77 1.18 1.99 690 1063 1793
449 H.P. SHIMLA TATU 53 F/9 MINAS 15.00 5.50 16.3 2669 1000 77° 40' 30° 48' R 160 0.32 0.49 0.83 384 592 999
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
17
S.No. STATE DISTRICT CATCHMENT RTS STM BSN A Sq Km
L Km
P Km
Zh m
Zl m
LON LAT FED HEAD Dependable Discharge Power
90% 75% 50% 90% 75% 50%
450 H.P. SHIMLA WARADA KHAD 53 I/3,4 WARADA KHAD
RUPIN 29.2 10.1 23 4642 2228 78-07-30 31-15-20 RF 460 0.57 0.88 1.48 1971 3034 5120
451 H.P. SIRMOUR BAJHETU 53 F/5 GIRI 85.00 16.50 38.0 3350 1120 77° 19' 30° 58' R 80 1.44 2.22 3.75 867 1334 2251
452 H.P. SIRMOUR BENAL 53 F/13 TONS 105.00 21.00 42.0 2909 800 77° 47' 30° 50' R 100 1.74 2.67 4.51 1301 2004 3381
453 H.P. SIRMOUR BHANGAL -MANGAL 53 F/9,10 TONS 132.00 12.50 46.0 2505 760 77° 42' 30° 47 R 40 2.12 3.26 5.50 635 978 1649
454 H.P. SIRMOUR JHANETI 53 E/8, F/5 GIRI 61.50 10.50 33.5 3080 1400 77° 25' 31° 0' R 80 1.09 1.68 2.83 654 1007 1700
455 H.P. SIRMOUR KHERI 53 E/8, F/5 GIRI 18.50 8.50 19.0 2688 1200 77° 21' 31° 0' R 160 0.38 0.59 1.00 461 710 1198
456 H.P. SIRMOUR NAIT 53 F/5,6 GIRI 109.50 19.50 47.5 3274 735 77° 19' 30° 44' R 40 1.80 2.77 4.67 540 831 1402
457 H.P. SIRMOUR PALOR 53 F/5,6,9,10 GIRI 196.30 27.00 63.5 3381 688 77° 22' 30° 41' R 80 2.99 4.60 7.76 1792 2759 4656
458 H.P. SIRMOUR PERVI 53 F/1,5 GIRI 114.80 15.00 45.5 2962 916 77° 14' 30° 53' R 40 1.87 2.89 4.87 562 866 1461
496192 763988
1289046
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
1
Uttar Pradesh
S.No. STATE DISTRICT CATCHMENT RTS STM BSN A SqKm
L Km
P Km
Zh m
Zl m
LON LAT FED HEAD Dependable Discharge Power
90% 75% 50% 90% 75% 50%
1 UP ALMORA ALAKNANDA 53 O/4 SARJU 82.50 15.00 36.5 2346 627 79° 58' 29° 38' R 60 0.81 1.25 1.97 366 564 888
2 UP ALMORA BADHAR 53 O/13 SARJU 78.80 17.00 33.0 2100 765 79° 49' 29° 47' R 80 0.78 1.20 1.89 468 722 1136
3 UP ALMORA BARAR 62 C/1 RAMGANGA 72.30 15.50 34.5 2304 800 80° 8' 29° 49' R 70 0.72 1.11 1.75 379 585 921
4 UP ALMORA BAURA 53 N/16 PINDAR 97.80 14.00 42.0 6099 1600 79° 48' 30° 4' S,G,R 80 0.95 1.46 2.30 568 875 1377
5 UP ALMORA BELANG 53 O/13 SARJU 20.30 6.50 18.0 2580 1100 79° 54' 29° 57' R 100 0.23 0.36 0.57 175 270 424
6 UP ALMORA BHADANG 53 N/15,16,62 B/4 PINDAR pindar 144.47 19.59 61.29 5922 1997 79-55-45 30-07-00 SF 200 1.34 2.06 3.25 2009 3097 4874
7 UP ALMORA BHANWAR 53 O/14 SARJU 33.80 10.00 24.0 2111 600 80° 0' 29° 37' R 160 0.37 0.57 0.89 441 679 1069
8 UP ALMORA BIMOLI 53 O/5,9 RAM GANGA 53.00 8.00 25.0 2459 1026 79° 25' 29° 55' R 120 0.55 0.85 1.33 493 761 1197
9 UP ALMORA DALAUT 53 O/13 SARJU 25.80 7.00 20.0 1922 815 79° 47' 29° 48' R 20 0.29 0.45 0.70 43 67 105
10 UP ALMORA DHAULA 53 O/10 KOSI 61.30 11.50 31.5 1841 1160 79° 38' 29° 38' R 20 0.62 0.96 1.51 94 144 227
11 UP ALMORA DULAM 53 N/6,O/13,62 B/4 SARJU SARJU R. 137.71 20.58 50.52 4078 1120 79-56-00 30-00-00 RF 80 1.28 1.98 3.11 770 1187 1868
12 UP ALMORA GALLI 53 O/14 SARJU 26.30 7.00 17.0 1860 560 80° 0' 29° 34' R 100 0.29 0.45 0.71 220 340 534
13 UP ALMORA GARUR 53 O/9 GOMTI 85.50 14.00 38.5 2452 1090 79° 38' 29° 54' R 40 0.84 1.29 2.04 252 388 611
14 UP ALMORA GASON 53 N/16, O/13 SARJU 74.00 10.00 33.0 3213 1320 79° 55' 30° 0' R 120 0.74 1.14 1.79 664 1024 1612
15 UP ALMORA GOMTI 53 N/8,12, O/5,9 GOMTI 149.00 25.00 50.0 2591 1090 79° 38' 29° 54' R 40 1.38 2.12 3.34 413 637 1002
16 UP ALMORA HATYURA 53 O/9 KOSI 35.50 8.00 22.5 2117 1360 79° 37' 29° 47' R 40 0.38 0.59 0.93 115 177 279
17 UP ALMORA JAIGAN 53 O/9,10,13,14 SARJU 137.00 20.00 51.5 2222 700 79° 54' 29° 42' R 100 1.28 1.97 3.10 958 1477 2325
18 UP ALMORA JAM 53 O/6 GAGAS 40.80 7.00 25.0 1938 900 79° 22' 29° 42' R 60 0.43 0.67 1.05 195 301 474
19 UP ALMORA JATAYA 53 O/14 JATAYA SARJU R. 63.52 14.68 37.54 2346 627 79-56-10 29-38-00 RF 340 0.64 0.99 1.56 1642 2533 3985
20 UP ALMORA JUNIYA 53 O/1 RAM GANGA 25.00 9.00 20.0 2066 840 79° 13' 29° 51' R 40 0.28 0.43 0.68 84 130 204
21 UP ALMORA KANAL 53 N/12,16,O/9,13 SARJU 76.30 11.50 41.5 3069 980 79° 49' 29° 54' R 40 0.76 1.17 1.84 228 351 552
22 UP ALMORA KAPHNI 53 N/16, 62 B/3,4 PINDAR 59.80 7.00 31.5 6029 2544 80° 0' 30° 10' S,G,R 50 0.61 0.94 1.48 229 353 555
23 UP ALMORA KHACHYAR 53 O/5 RAMGANGA 41.00 12.00 27.5 2090 932 79° 21' 29° 53' R 40 0.44 0.67 1.06 131 202 317
24 UP ALMORA KHATRON 53 O/1 RAM GANGA 57.00 10.00 27.5 2073 800 79° 14' 29° 47' R 40 0.58 0.90 1.42 175 271 426
25 UP ALMORA KHAUR 53 O/5,6 RAMGANGA 64.00 12.00 28.5 1808 843 79° 21' 29° 43' R 20 0.65 1.00 1.57 97 150 236
26 UP ALMORA KHUL 53 O/10 KOSI 34.00 7.00 23.0 2190 1151 79° 37' 29° 37' R 40 0.37 0.57 0.90 111 171 269
27 UP ALMORA KOSI 53 O/9 KOSI 102.50 14.00 44.0 2758 1400 79° 37' 29° 47' R 40 0.99 1.52 2.39 296 456 718
28 UP ALMORA KUCH 53 O/6,10 KOSI 104.50 16.00 47.5 2016 855 79° 28' 29° 31' R 20 1.00 1.55 2.44 151 232 365
29 UP ALMORA KUTAR 53 O/15 SARJU 53.80 14.00 33.0 2151 846 79° 53' 29° 28' R 40 0.56 0.86 1.35 167 257 404
30 UP ALMORA KUTHLAR 53 O/5 RAM GANGA 60.00 13.00 33.0 2242 945 79° 22' 29° 53' R 40 0.61 0.94 1.49 184 283 446
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
2
S.No. STATE DISTRICT CATCHMENT RTS STM BSN A SqKm
L Km
P Km
Zh m
Zl m
LON LAT FED HEAD Dependable Discharge Power
90% 75% 50% 90% 75% 50%
31 UP ALMORA LAHOR 53 N/12, O/9,13 SARJU 100.00 26.50 56.0 2520 900 79° 47' 29° 57' S,R 40 0.96 1.49 2.34 289 446 702
32 UP ALMORA LATOLIYA 53 O/9 GOMTI 24.80 6.00 18.0 1888 1160 79° 37' 30° 54' R 40 0.28 0.43 0.68 84 129 203
33 UP ALMORA LETI 62 B/4, C/1 RAM GANGA 24.50 7.00 19.5 2979 1200 80° 4' 30° 1' R 50 0.28 0.43 0.67 103 159 251
34 UP ALMORA MALLE 53 O/6,10 GAGAS 49.80 11.50 23.0 2110 1160 79° 29' 29° 42' R 20 0.52 0.80 1.26 78 120 189
35 UP ALMORA MARTOLI 62 B/3,4 GORIGANGA 171.80 16.00 110.5 7434 3200 80° 12' 30° 22' S,G,R 50 1.56 2.41 3.79 586 904 1422
36 UP ALMORA MEHAR 62 C/1 RAMGANGA 81.50 12.50 39.0 2426 900 80° 9' 29° 54' R 40 0.80 1.24 1.95 241 372 585
37 UP ALMORA NAGHAR 53 O/13 BADHAR GAD SARJU 63.34 18.08 32.51 2100 765 79-51-00 29-47-00 RF 140 0.64 0.99 1.56 675 1040 1637
38 UP ALMORA NAYER 53 O/2 RAM GANGA 67.80 11.00 24.0 1762 900 79° 12' 29° 38' R 20 0.68 1.05 1.66 102 158 248
39 UP ALMORA PANAR 53 O/14,15 KOT 99.50 13.50 45.0 2171 840 79° 48' 29° 29' R 40 0.96 1.48 2.33 288 444 699
40 UP ALMORA PINDAR 53N/15,16,62B/3,4 PINDAR 115.00 26.00 43.5 6663 2800 80° 0' 29° 11' S,G,R 200 1.09 1.69 2.65 1639 2528 3978
41 UP ALMORA PUNGAR 53 O/13, 62 C/1 SARJU 156.80 20.00 57.0 2720 900 79° 47' 29° 53' R 20 1.44 2.22 3.50 216 333 524
42 UP ALMORA RAM 53 O/11 KOSI 77.50 16.00 42.0 2346 1025 79° 28' 29° 27' R 80 0.77 1.19 1.87 461 711 1120
43 UP ALMORA RAM GANGA 62 B/4 RAMGANGA 118.00 12.00 44.0 6050 2100 80° 5' 30° 6' S,G,R 40 1.12 1.72 2.71 335 517 814
44 UP ALMORA RATLA 53 O/15 LADHIYA 130.50 25.00 50.0 2181 940 79° 53' 29° 17' R 40 1.22 1.89 2.97 367 566 890
45 UP ALMORA RISKAN 53 O/5,6 RAM GANGA 53.80 14.00 30.5 1633 900 79° 23' 29° 42' R 20 0.56 0.86 1.35 83 128 202
46 UP ALMORA SARJU 53N/16,O/13,62B/4 SARJU 143.80 15.00 47.5 4423 1200 79° 55' 30° 0' S,R 40 1.33 2.06 3.24 400 617 971
47 UP ALMORA SARJU 53 O/13 SARJU 43.30 10.00 25.5 2324 1240 79° 54' 29° 57' R 40 0.46 0.71 1.11 137 212 333
48 UP ALMORA SAROD 53 O/6,10 KOSI 109.00 11.00 47.5 1902 984 79° 32' 29° 33' R 40 1.04 1.61 2.53 313 482 758
49 UP ALMORA SERI 53 O/15 SARJU 21.30 7.50 19.0 1711 767 79° 55' 29° 28' R 60 0.24 0.38 0.59 110 169 266
50 UP ALMORA SHUNGARH 53 N/16,62 B/4 SARJU SARJU R. 118.86 15.11 46.39 4114 1120 79-57-00 30-03-00 RF 42 1.13 1.74 2.73 355 547 860
51 U.P. ALMORA SIM 53 O/9,10 KOSI 57.80 11.50 33.0 2296 1200 79° 34' 29° 41' R 40 0.59 0.91 1.44 178 274 431
52 U.P. ALMORA SIPRAH 53 O/15 SARJU 33.80 12.00 25.5 1711 680 79° 78' 29° 28' R 40 0.37 0.57 0.89 110 170 267
53 U.P. ALMORA SUMARI 53 O/9 KOSI 42.50 7.50 24.5 2622 1400 79° 37' 29° 47' R 40 0.45 0.69 1.09 135 208 328
54 U.P. ALMORA SUNDARDHUNGA 53 N/15,16 PINDAR 189.80 20.00 61.5 6855 1997 79° 56' 30° 7' S,G,R 160 1.71 2.63 4.14 2049 3160 4972
55 U.P. ALMORA SURAG 53 N/16 PINDAR 23.00 8.00 17.5 4561 1900 79° 53' 30° 5' S,R 280 0.26 0.40 0.63 547 844 1328
56 U.P. ALMORA SWAL 53 O/10,14 KOSI 123.30 12.00 40.0 2204 1340 79° 44' 29° 36' R 20 1.16 1.79 2.82 174 269 423
57 U.P. ALMORA TARAG 53 O/5,9 RAM GANGA 70.00 9.00 28.0 2667 955 79° 23' 29° 53' R 40 0.70 1.08 1.70 211 325 511
58 U.P. ALMORA THAT 53 O/10,14 KOSI 91.30 6.00 42.0 2412 1240 79° 44' 29° 36' R 20 0.89 1.37 2.16 133 206 324
59 U.P. CHAMOLI AGASTMUNI 53 J/15, N/3 MANDAKINI 30.00 7.00 20.0 2672 733 79° 2' 30° 23' R 120 0.33 0.51 0.80 297 458 721
60 U.P. CHAMOLI AKTANLI 53 N/2,6 MADHYA MAH MANDAKINI
219.63 15.62 174.33 6974 1059 79-11-00 30-36-00 SF 80 1.94 3.00 4.72 1167 1799 2831
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
3
S.No. STATE DISTRICT CATCHMENT RTS STM BSN A SqKm
L Km
P Km
Zh m
Zl m
LON LAT FED HEAD Dependable Discharge Power
90% 75% 50% 90% 75% 50%
61 U.P. CHAMOLI ALAKNANDA 53 N/1,5,6 ALAKNANDA 246.30 7.00 70.0 7621 3160 79° 30' 30° 46' S,G,R 120 2.15 3.32 5.23 1938 2989 4704
62 U.P. CHAMOLI ARWA 53 N/5 ALAKNANDA 190.50 12.00 64.5 6560 4000 79° 28' 30° 52' S,G,R 80 1.71 2.64 4.16 1028 1585 2494
63 U.P. CHAMOLI BADALPUR 53 N/1,2,J/14 MANDAKINI MANDAKINI
249.61 18.92 109.91 6940 79-01-30 30-37-30 SF 120 2.18 3.36 5.29 1962 3025 4760
64 U.P. CHAMOLI BAGNI 53 N/14,15 ALAKNANDA 55.30 5.50 29.5 6864 3470 79° 50' 30° 26' S,G,R 280 0.57 0.88 1.38 1196 1843 2901
65 U.P. CHAMOLI BALASUTI 53 N/2,3,6,7 ALAKNANDA 164.30 17.00 51.5 4785 1000 79° 19' 30° 23' R 40 1.50 2.32 3.64 451 695 1093
66 U.P. CHAMOLI BALASUTI-I 53 N/2,3,6,7 BALASUTI ALAKNANDA
51.2 9.97 30.05 4785 980 79-16-00 30-28-30 RF 120 0.53 0.82 1.29 478 738 1161
67 U.P. CHAMOLI BALASUTI-II 53 N/2,3,6,7 BALASUTI ALAKNANDA
112.02 15.63 41.48 4785 980 79-17-00 30-26-00 RF 60 1.07 1.65 2.59 480 741 1166
68 U.P. CHAMOLI BALASUTI-III 53 N/2,3,6,7 BALASUTI ALAKNANDA
135.68 19.5 48.07 4785 980 79-18-30 30-24-30 RF 60 1.27 1.95 3.07 570 879 1383
69 U.P. CHAMOLI BANGINA 53 N/6 KALPA GANGA ALAKNANDA
94.12 15.07 47.38 5898 1200 79-29-00 30-32-00 RF 80 0.91 1.41 2.22 549 846 1331
70 U.P. CHAMOLI BARAM 53 N/8 PINDAR 18.50 5.50 16.0 2743 1082 79° 26' 30° 6' R 50 0.21 0.33 0.52 80 124 195
71 U.P. CHAMOLI BENAKULI 53 N/6 KHIRAO GANGA ALAKNANDA
140.72 16.85 54.84 6700 2340 79-29-20 30-41-00 RF 260 1.31 2.02 3.17 2551 3933 6190
72 U.P. CHAMOLI BHADRA 53 N/7 ALAKNANDA 20.00 7.00 17.0 3327 1240 79° 26' 30° 16' R 120 0.23 0.35 0.56 207 319 502
73 U.P. CHAMOLI BHANGYUL 53 N/10,11 ALAKNANDA 20.30 8.00 20.5 4978 1800 79° 38' 30° 30' S,R 560 0.23 0.36 0.57 979 1510 2376
74 U.P. CHAMOLI BHIUNDAR 53 N/10,14 ALAKNANDA 72.00 13.00 39.0 6629 2560 79° 35' 30° 46' S,R 160 0.72 1.11 1.75 864 1333 2097
75 U.P. CHAMOLI BIMARU 53 N/6,7 MENA NADI ALAKNANDA
160.24 25.11 60.88 5898 1100 79-25-40 30-28-00 RF 80 1.47 2.26 3.56 881 1359 2138
76 U.P. CHAMOLI BIREHI 53 N/7,11 ALAKNANDA 162.50 14.00 53.0 6309 1680 79° 32' 30° 22' R 120 1.49 2.29 3.61 1338 2064 3248
77 U.P. CHAMOLI BIRHIGANGA 53 N/7,11,15 BIRHIGANGA ALAKNANDA
202.06 21.38 73.4 6063 904 79-29-00 30-22-30 SF 110 1.81 2.78 4.38 1490 2297 3615
78 U.P. CHAMOLI BYUNG 53 N/2 MANDAKINI 16.80 6.00 15.5 3189 1160 79° 4' 30° 33' R 200 0.20 0.30 0.48 296 456 717
79 U.P. CHAMOLI CHAMOLI 53 N/11,15 ALAKNANDA 95.50 6.00 48.5 7045 2315 79° 44' 30° 28' S,G,R 80 0.93 1.43 2.25 556 857 1348
80 U.P. CHAMOLI CHARWAN 53 N/7,11,15 NANDAKINI ALAKNANDA
266.56 26.66 76.01 6680 920 79-30-00 30-17-00 RF 80 2.31 3.56 5.61 1387 2138 3365
81 U.P. CHAMOLI CHOPTA 53 N/8 PINDAR 28.80 8.50 27.0 2718 1000 79° 21' 30° 10' R 80 0.32 0.49 0.77 191 295 464
82 U.P. CHAMOLI CHOR 53 N/8,12 PINDAR 26.00 23.00 10.0 3313 1082 79° 26' 30° 6' R 200 0.29 0.45 0.71 436 672 1058
83 U.P. CHAMOLI CHUNI 53 N/2,6 MADHYA MAH MANDAKINI
231.15 27.33 99.93 6974 1059 79-07-00 30-33-00 SF 80 2.04 3.14 4.94 1221 1883 2963
84 U.P. CHAMOLI CHUPHLA 53 N/7,8,12 ALAKNANDA 70.50 8.50 32.5 3524 1360 79° 27' 30° 16' R 80 0.71 1.09 1.72 424 654 1029
85 U.P. CHAMOLI DODH GANGA 53 N/15 ALAKNANDA 20.00 5.50 17.0 5480 2880 79° 47' 30° 27' S,G,R 320 0.23 0.35 0.56 552 852 1340
86 U.P. CHAMOLI DULI GADHERA 53 N/10,11 ALAKNANDA 40.00 7.50 26.5 4610 1800 79° 37' 30° 30' S,R 320 0.43 0.66 1.04 1024 1579 2485
87 U.P. CHAMOLI DUNAGIRI 53 N/4 ALAKNANDA 174.80 10.00 53.0 6931 2800 79° 50' 30° 37' S,G,R 160 1.59 2.45 3.85 1904 2936 4621
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
4
S.No. STATE DISTRICT CATCHMENT RTS STM BSN A SqKm
L Km
P Km
Zh m
Zl m
LON LAT FED HEAD Dependable Discharge Power
90% 75% 50% 90% 75% 50%
88 U.P. CHAMOLI GADI 53 N/10,14 ALAKNANDA 34.00 5.50 24.0 5880 2280 79° 46' 30° 34' S,G,R 240 0.37 0.57 0.90 664 1025 1612
89 U.P. CHAMOLI GANDASU 53 N/7 MOLA GAD NAUDAKINI
35 10.75 26.3 3327 1000 79-24-00 30-19-00 RF 200 0.38 0.58 0.92 568 876 1379
90 U.P. CHAMOLI GANESH GANGA 53 N/7,11 ALAKNANDA 51.50 10.50 30.5 3898 1172 79° 29' 30° 29' R 40 0.53 0.82 1.30 160 247 389
91 U.P. CHAMOLI GANKHWI 53 N/14 ALAKNANDA 46.50 9.00 31.0 7066 2355 79° 47' 30° 35' R 280 0.49 0.75 1.18 1025 1580 2486
92 U.P. CHAMOLI GHAT 53 N/7,8,12 CHUPHLA GAD NAUDAKINI
65.88 15.10 34.22 3646 1320 79-26-30 30-14-00 RF 120 0.67 1.03 1.61 599 923 1453
93 U.P. CHAMOLI GHOLTIR 53 N/3,4 ALAKNANDA 38.00 8.50 24.0 3007 687 79° 1' 30° 3' R 80 0.41 0.63 0.99 245 377 593
94 U.P. CHAMOLI GULARI 53 N/11,12,15 NANDAKINI ALAKNANDA
214.29 21.01 67.4 6680 920 79-33-00 30-16-30 SF 40 1.90 2.93 4.62 571 880 1385
95 U.P. CHAMOLI HANUMAN 53 N/15 ALAKNANDA 19.00 4.50 16.0 6070 3105 79° 47' 30° 27' S,G,R 280 0.22 0.34 0.53 462 712 1120
96 U.P. CHAMOLI HAT 53 J/15, N/3 MANDAKINI 31.00 11.00 23.0 2769 800 79° 4' 30° 25' R 80 0.34 0.52 0.82 204 315 495
97 U.P. CHAMOLI HOM GADHERA 53 N/10 DHAULI GANGA 52.80 10.00 28.0 5880 1650 79° 37' 30° 32' S,R 180 0.55 0.84 1.33 738 1137 1790
98 U.P. CHAMOLI IRANI 53 N/11 BIREHI GANGA ALAKNANDA
79.61 8.46 37.07 6063 994 79-36-00 30-23-00 RF 200 0.79 1.21 1.91 1181 1822 2867
99 U.P. CHAMOLI JAINTHA 53 N/8,12 PRANMATI GAD PINDAR 88.25 12.38 37.41 4031 1124 79-30-30 30-06-00 RF 120 0.86 1.33 2.09 777 1198 1885
100 U.P. CHAMOLI JENTHA 53 N/8 PINDAR 20.50 5.50 17.0 2705 880 79° 18' 30° 12' R 280 0.24 0.36 0.57 494 762 1199
101 U.P. CHAMOLI JETHA 53 N/7 ALAKNANDA 23.30 10.00 21.0 3185 916 79° 19' 30° 18' S,R 120 0.26 0.41 0.64 237 366 576
102 U.P. CHAMOLI JUMA 53 N/10,14 ALAKNANDA 27.80 8.50 22.0 5753 2600 79° 48' 30° 36' S,R 50 0.31 0.48 0.75 116 178 281
103 U.P. CHAMOLI JUWAGWAR 53 N/11 ALAKNANDA 10.00 5.50 12.5 4978 1968 79° 41' 30° 29' S,R 440 0.12 0.19 0.30 410 631 994
104 U.P. CHAMOLI KAGBHUSAND 53 N/10 ALAKNANDA 52.50 11.00 27.5 5200 1590 79° 29' 30° 36' S,G,R 200 0.54 0.84 1.32 815 1257 1978
105 U.P. CHAMOLI KAKRA 53 N/2,3 MANDAKINI 74.30 8.50 35.0 3579 1000 79° 5' 30° 29' R 50 0.74 1.14 1.80 278 428 674
106 U.P. CHAMOLI KALAPANI 53 N/6,7 ALAKNANDA 159.80 17.50 5.5 5535 1320 79° 26' 30° 28' R 120 1.47 2.26 3.55 1319 2033 3199
107 U.P. CHAMOLI KALI GANGA 53 N/1,2 MANDAKINI 62.30 18.50 49.5 6350 1760 78° 5' 30° 36' S,G,R 50 0.63 0.98 1.54 237 366 576
108 U.P. CHAMOLI KALI GANGA 53 N/12,16 PINDAR 354.50 25.00 75.0 5198 1290 79° 35' 30° 3' S,R 40 2.98 4.59 7.23 894 1378 2169
109 U.P. CHAMOLI KALPA GANGA 53 N/6,10 ALAKNANDA 111.30 14.00 49.0 5898 1240 79° 30' 30° 32' S,G,R 50 1.06 1.64 2.58 398 614 966
110 U.P. CHAMOLI KANDARA 53 N/2,6 MADHYA MAH MANDAKANI
222.53 15.62 101.26 6974 101.26 79-11-00 30-36-00 SF 120 1.97 3.03 4.77 1771 2731 4297
111 U.P. CHAMOLI KARMNASA 53 N/10,11 ALAKNANDA 19.80 6.50 16.0 3886 1200 79° 30' 30° 32' S,R 280 0.23 0.35 0.55 479 738 1162
112 U.P. CHAMOLI KEWAR 53 N/8 PINDAR 45.50 8.00 23.5 2734 1000 79° 23' 30° 8' R 160 0.48 0.74 1.16 574 885 1393
113 U.P. CHAMOLI KHANCHA 53 N/10 HOM GADHERA DHAULI GANGA
39.11 10.34 25.75 5880 1650 79-37-00 30-32-30 RF 120 0.42 0.64 1.01 376 580 913
114 U.P. CHAMOLI KHANSAR 53 N/8, O/5 RAM GANGA 82.50 9.00 34.0 3069 1066 79° 25' 29° 57' R 40 0.81 1.25 1.97 244 376 592
115 U.P. CHAMOLI KHIRAO GANGA 53 N/6,10 ALAKNANDA 157.80 15.00 51.5 6596 2360 79° 30' 30° 41' S,G,R 80 1.45 2.23 3.52 869 1340 2109
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
5
S.No. STATE DISTRICT CATCHMENT RTS STM BSN A SqKm
L Km
P Km
Zh m
Zl m
LON LAT FED HEAD Dependable Discharge Power
90% 75% 50% 90% 75% 50%
116 U.P. CHAMOLI KOTMA 53 N/1,2 KALIGNAGA MANDAKANI
170.94 16.63 60.67 6350 1100 79-05-00 30-35-30 SF 120 1.56 2.40 3.77 1400 2159 3397
117 U.P. CHAMOLI KUNJGARH 53 J/14,N/2 SINA GAD MANDAKANI
128.7 12.34 47.55 5144 1684 78-59-30 30-37-30 RF 40 1.21 1.86 2.93 362 559 879
118 U.P. CHAMOLI KYAR 53 N/2 MANDAKINI 46.80 10.50 30.0 4326 1120 79° 7' 30° 33' S,R 80 0.49 0.76 1.19 294 454 714
119 U.P. CHAMOLI KYUNJA 53 N/3 MANDAKINI 64.80 9.00 29.0 3076 827 79° 4' 30° 26' R 80 0.66 1.01 1.59 393 607 955
120 U.P. CHAMOLI LAXMANGANGA 53 N/10 LAXMAN GANGA ALAKNANDA
168.7 18.53 61.35 6629 1760 79-34-00 30-37-30 RF 260 1.54 2.37 3.73 2998 4623 7275
121 U.P. CHAMOLI LOANI 53 N/7,10 VISHNU GAD ALAKNANDA
33.61 6.55 23.38 5115 1400 79-31-00 30-34-00 RF 260 0.37 0.56 0.89 712 1099 1729
122 U.P. CHAMOLI MADHYAMAHESHWAR 53 N/2,6 MANDAKINI 145.80 15.50 48.0 6700 1720 79° 11' 30° 37' S,G,R 120 1.35 2.08 3.28 1215 1874 2949
123 U.P. CHAMOLI MAIGAR 53 N/8, O/1 RAM GANGA 37.80 8.00 18.5 2155 1290 79° 19' 29° 59' R 40 0.41 0.63 0.98 122 188 295
124 U.P. CHAMOLI MAIKHANDO 53 N/1,2,J/14 MANDAKINI MANDAKINI
182.23 23.38 86.98 6940 79-02-30 30-35-15 SF 80 1.65 2.54 4.00 988 1524 2398
125 U.P. CHAMOLI MAINI 53 N/11,12 ALAKNANDA 31.50 6.50 22.5 4070 1835 79° 34' 30° 17' S,R 80 0.34 0.53 0.84 207 319 502
126 U.P. CHAMOLI MANDAKINI 53 N/1,2 MANDAKINI 82.30 10.50 39.0 6578 2200 79° 2' 30° 40' S,G,R 200 0.81 1.25 1.97 1217 1876 2953
127 U.P. CHAMOLI MANDAL 53 N/7 AMRIT GANGA BALASUTI N.
32.77 8.38 24.37 4605 1422 79-17-00 30-28-00 RF 200 0.36 0.55 0.87 536 826 1300
128 U.P. CHAMOLI MANDANI GANGA 53 N/2 MANDAKINI 101.00 15.50 46.0 6193 1800 79° 5' 30° 36' S,G,R 120 0.97 1.50 2.36 876 1351 2126
129 U.P. CHAMOLI MARKANDA GANGA 53 N/2,6 MANDAKINI 119.50 13.50 47.0 6975 1720 79° 11' 30° 37' S,G,R 160 1.13 1.74 2.74 1357 2093 3293
130 U.P. CHAMOLI MELKHET 53 N/12 PINDAR 23.50 8.00 20.0 3372 1572 79° 43' 30° 2' R 80 0.27 0.41 0.64 159 246 387
131 U.P. CHAMOLI MING 53 N/8 PINDAR 33.50 6.50 25.0 2878 1057 79° 25' 30° 7' R 120 0.36 0.56 0.88 328 506 796
132 U.P. CHAMOLI MOLA 53 N/7 ALAKNANDA 36.30 10.50 25.0 3327 1040 79° 22' 30° 16' R 160 0.39 0.60 0.95 470 724 1139
133 U.P. CHAMOLI MUKH 53 N/7,8 ALAKNANDA 27.00 6.50 18.0 2832 1000 79° 25' 30° 16' R 80 0.30 0.46 0.73 180 278 438
134 U.P. CHAMOLI NAGOL 53 N/3,7 ALAKNANDA 134.00 22.50 55.0 3680 880 79° 18' 30° 19' R 40 1.25 1.93 3.04 376 579 912
135 U.P. CHAMOLI NANDAKINI 53 N/11,15 ALAKNANDA 92.50 12.00 42.5 6620 2300 79° 37' 30° 17' S,G,R 80 0.90 1.39 2.18 540 833 1311
136 U.P. CHAMOLI NIL GANGA 53 N/10 ALAKNANDA 21.80 7.00 16.0 4448 2160 79° 32' 30° 38' S,R 320 0.25 0.38 0.60 596 919 1447
137 U.P. CHAMOLI PAKHI 53 N/7,11 GARUR GANGA ALAKNANDA
20.98 8.35 20.6 3498 1200 79-27-00 30-26-30 RF 200 0.24 0.37 0.58 360 555 874
138 U.P. CHAMOLI PANGTOLI 53 N/6,7 MENA NADI ALAKNANDA
135.14 18.08 53.61 6700 1100 79-24-00 30-30-30 SF 180 1.26 1.95 3.06 1704 2627 4134
139 U.P. CHAMOLI POGTA 53 N/3 ALAKNANDA 70.50 17.00 33.0 2393 800 79° 8' 30° 17' R 40 0.71 1.09 1.72 212 327 515
140 U.P. CHAMOLI PRANMATI 53 N/8,12 PINDAR 95.50 12.50 38.0 4031 1200 79° 30' 30° 4' S,R 120 0.93 1.43 2.25 834 1285 2023
141 U.P. CHAMOLI PUI 53 N/11 ALAKNANDA 36.50 9.00 25.5 4046 1600 79° 32' 30° 23' S,R 160 0.39 0.61 0.95 472 728 1145
142 U.P. CHAMOLI PUNERA 53 N/7,8,11,12 ALAKNANDA 29.80 11.00 24.0 4070 1328 79° 29' 30° 16' R 440 0.33 0.51 0.80 1083 1670 2628
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
6
S.No. STATE DISTRICT CATCHMENT RTS STM BSN A SqKm
L Km
P Km
Zh m
Zl m
LON LAT FED HEAD Dependable Discharge Power
90% 75% 50% 90% 75% 50%
143 U.P. CHAMOLI RAM GANGA 53 N/4,8, O/5 RAM GANGA 120.00 19.50 48.0 3116 1290 79° 20' 29° 59' R 40 1.14 1.75 2.75 341 525 826
144 U.P. CHAMOLI RATA 53 N/7,8 ALAKNANDA 29.80 7.00 21.5 2429 800 79° 17' 30° 18' R 80 0.33 0.51 0.80 197 304 478
145 U.P. CHAMOLI RAUNTHI 53 N/11,15 RAUNTHI GADHERA
RISHI GANGA
66.77 8.44 38.74 6309 2315 79-44-00 30-27-00 RF 400 0.67 1.04 1.63 2020 3115 4902
146 U.P. CHAMOLI RAWAN GANGA 53 N/2,3 MANDAKINI 29.30 7.50 20.5 3189 1040 79° 5' 30° 31' R 80 0.32 0.50 0.78 194 299 471
147 U.P. CHAMOLI RINGI 53 N/11 ALAKNANDA 12.80 8.00 15.0 4717 1870 79° 38' 30° 28' S,R 240 0.15 0.24 0.38 278 429 675
148 U.P. CHAMOLI RISHI GANGA 53 N/5,6 ALAKNANDA 27.00 4.00 40.0 6596 3160 79° 30' 30° 44' S,G,R 200 0.30 0.46 0.73 451 695 1094
149 U.P. CHAMOLI RUP GANGA 53 N/11,12 ALAKNANDA 32.80 10.00 26.5 5055 2200 79° 37' 30° 17' S,R 40 0.36 0.55 0.87 107 165 260
150 U.P. CHAMOLI SARTOLI 53 N/11 PUI GADHERA BIREHI GANGA
35.01 7.60 23.79 4046 1600 79-32-00 30-24-00 RF 80 0.38 0.58 0.92 227 351 552
151 U.P. CHAMOLI SAUR 53 N/12,16 PINDAR 32.80 8.00 23.0 3501 1545 79° 47' 30° 3' S,R 160 0.36 0.55 0.87 429 662 1041
152 U.P. CHAMOLI SIMLI 53 N/8 PINDAR 30.50 8.50 18.5 2754 1057 79° 25' 30° 6' R 120 0.34 0.52 0.81 302 465 732
153 U.P. CHAMOLI SINDRAWANI 53 N/3,4 ALAKNANDA 22.00 8.00 17.5 2887 600 79° 10' 30° 17' R 20 0.25 0.39 0.61 38 58 91
154 U.P. CHAMOLI SIWALI 53 N/3,4 ALAKNANDA 35.30 12.50 27.5 3007 800 79° 9' 30° 17' R 80 0.38 0.59 0.93 229 353 556
155 U.P. CHAMOLI SUBHAIN 53 N/11 ALAKNANDA 15.50 7.00 15.0 5188 1992 79° 41' 30° 29' S,R 440 0.18 0.28 0.44 605 933 1468
156 U.P. CHAMOLI SUIYA 53 N/12,15,16 KAILGANGA PINDAR 222.27 24.03 82.63 4720 1290 79-39-00 30-06-00 SF 40 1.97 3.03 4.77 590 909 1431
157 U.P. CHAMOLI SUNBHI 53 N/7,8 PINDAR 36.50 8.50 23.5 2832 960 79° 20' 30° 12' R 40 0.39 0.61 0.95 118 182 286
158 U.P. CHAMOLI SUR 53 N/3 MANDAKINI 29.80 10.00 22.5 2419 733 79° 1' 30° 23' R 120 0.33 0.51 0.80 295 455 717
159 U.P. CHAMOLI SURANI 53 N/4,8 ATA GAD PINDAR 151.32 10.28 57.11 2980 940 79-13-00 30-11-00 RF 40 1.40 2.15 3.39 419 646 1016
160 U.P. CHAMOLI SUTOL 53 N/11,15 NANDAKINI ALAKNANDA
87.43 11.48 40.84 6620 920 79-37-30 30-16-30 RF 120 0.86 1.32 2.08 771 1188 1870
161 U.P. CHAMOLI SYUNI 53 N/8, O/5 RAM GANGA 47.50 9.50 29.0 3069 1280 79° 21' 29° 29' R 80 0.50 0.77 1.21 298 460 724
162 U.P. CHAMOLI TALOR 53 N/12,15,16 KAIL GANGA PINDAR 119.34 31.82 58.95 4720 1290 79-36-00 30-04-00 SF 40 1.13 1.74 2.74 339 523 822
163 U.P. CHAMOLI TOLMA 53 N/14,15 ALAKNANDA 41.30 9.50 25.0 6710 2200 79° 45' 30° 32' S,G,R 200 0.44 0.68 1.07 658 1015 1598
164 U.P. CHAMOLI TRISUL 53 N/15 ALAKNANDA 124.50 9.50 46.5 2045 3440 79° 50' 30° 27' S,G,R 160 1.17 1.81 2.85 1408 2170 3415
165 U.P. CHAMOLI TUNALA 53 N/7,8,11,15 NANDAKINI ALAKNANDA
305.72 36.76 142.4 5661 920 79-25-00 30-16-30 SF 40 2.61 4.03 6.34 783 1208 1901
166 U.P. CHAMOLI UTARSAUM 53 N/7 NAGOL GAD ALAKNANDA
19.4 4.46 18.6 1869 860 79-17-00 30-20-00 RF 40 0.22 0.35 0.54 67 104 163
167 U.P. CHAMOLI VASUKI GANGA 53 J/14, N/2 MANDAKINI 132.80 18.00 46.5 5144 1684 79° 0' 30° 38' S,G,R 80 1.24 1.92 3.01 745 1149 1809
168 U.P. CHAMOLI VISHNU GAD 53 N/6,10 ALAKNANDA 39.00 7.50 23.0 5115 1360 79° 32' 30° 33' S,G,R 280 0.42 0.64 1.01 876 1351 2125
169 U.P. CHAMOLI WAUTI 53 N/10,14 ALAKNANDA 29.00 5.50 20.5 5855 2200 79° 47' 30° 36' S,G,R 200 0.32 0.49 0.78 481 741 1166
170 U.P. DEHRADUN AMLAWA 53 F/14 YAMUNA 134.00 25.00 60.5 2484 560 77° 52' 30° 31' R 40 1.25 1.93 3.04 376 579 912
171 U.P. DEHRADUN ARNI 53 J/3 YAMUNA 16.50 7.50 18.0 2277 800 78° 5' 30° 23' R 120 0.19 0.30 0.47 174 269 423
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
7
S.No. STATE DISTRICT CATCHMENT RTS STM BSN A SqKm
L Km
P Km
Zh m
Zl m
LON LAT FED HEAD Dependable Discharge Power
90% 75% 50% 90% 75% 50%
172 U.P. DEHRADUN BALDI 53 J/3 SONG 43.30 7.00 24.0 2612 1080 78° 7' 30° 23' R 40 0.46 0.71 1.11 137 212 333
173 U.P. DEHRADUN BANDAL 53 J/3 SONG 67.50 10.00 31.0 2612 740 78° 9' 30° 22' R 50 0.68 1.05 1.65 255 393 619
174 U.P. DEHRADUN CHAUBE 53 E/16, F/13 TONS 21.80 10.00 18.5 3191 1052 77° 56' 30° 58' R 50 0.25 0.38 0.60 93 144 226
175 U.P. DEHRADUN CHIPHALDI 53 J/3 SONG 32.30 7.00 22.0 2014 700 78° 11' 30° 18' R 100 0.35 0.54 0.86 264 408 642
176 U.P. DEHRADUN GADU 53 F/13, I/5 YAMUNA 40.50 5.00 26.0 3069 1400 78° 1' 30° 47' R 50 0.43 0.67 1.05 162 249 393
177 U.P. DEHRADUN GOTHAR 53 J/2 YAMUNA 24.00 6.00 20.0 2544 1000 78° 5' 30° 43' R 80 0.27 0.42 0.66 162 250 394
178 U.P. DEHRADUN KHUTNO 53 F/14, J/2 YAMUNA 175.80 27.50 54.0 2844 880 78° 0' 30° 38' R 40 1.60 2.46 3.87 479 738 1161
179 U.P. DEHRADUN NALOTA 53 J/3 YAMUNA 51.80 10.50 29.0 2191 700 78° 2' 30° 22' S,R 100 0.54 0.83 1.30 403 621 977
180 U.P. DEHRADUN NUN 53 J/3 YAMUNA 32.50 7.50 19.0 2161 600 78° 2' 30° 23' R 100 0.35 0.55 0.86 266 410 645
181 U.P. DEHRADUN SALI 53 F/14,J/2 YAMUNA 47.00 10.50 31.5 2079 600 78° 1' 30° 38' R 40 0.49 0.76 1.20 148 228 359
182 U.P. GARHWAL ATA 53 N/4,8 PINDAR 189.30 16.00 63.5 3119 820 79° 16' 30° 13' R 120 1.70 2.63 4.13 1533 2364 3721
183 U.P. GARHWAL BALI 53 J/16, N/4 GANGA 43.00 10.50 23.0 2685 1000 78° 5' 30° 7' R 50 0.46 0.70 1.10 171 263 414
184 U.P. GARHWAL BAYE 53 O/1 RAM GANGA 30.00 10.50 20.5 2000 920 79° 13' 29° 52' R 40 0.33 0.51 0.80 99 153 240
185 U.P. GARHWAL BIDOLI 53 J/16 GANGA 26.30 7.00 22.5 2197 1040 78° 54' 30° 7' R 100 0.29 0.45 0.71 220 340 534
186 U.P. GARHWAL CHAMANPUR 53 J/11,12 ALAKNANDA 18.80 7.00 18.0 1796 600 78° 38' 30° 11' R 200 0.22 0.34 0.53 327 504 793
187 U.P. GARHWAL CHHOYA 53 J/16 GANGA 17.80 5.50 17.0 2224 1200 78° 57' 30° 8' R 100 0.21 0.32 0.50 156 240 377
188 U.P. GARHWAL DEV 53 O/2 RAM GANGA 40.00 11.00 29.0 1742 665 79° 5' 29° 39' R 20 0.43 0.66 1.04 64 99 155
189 U.P. GARHWAL DEWAL GANGA 53 J/16 ALAKNANDA 27.30 8.50 21.0 2032 682 78° 52' 30° 15' R 40 0.30 0.47 0.74 91 140 221
190 U.P. GARHWAL DHALIYULI 53 J/16, N/4 GANGA 123.00 20.00 44.0 2667 1120 78° 55' 30° 9' R 50 1.16 1.79 2.82 435 671 1056
191 U.P. GARHWAL DILI 53 J/15,16, N/4 ALAKNANDA 60.30 15.00 30.5 2419 700 78° 55' 30° 16' R 50 0.61 0.95 1.49 231 356 560
192 U.P. GARHWAL GOSTU 53 J/16 ALAKNANDA 22.50 7.00 18.5 2197 600 78° 52' 30° 15' R 40 0.26 0.39 0.62 77 118 186
193 U.P. GARHWAL IRGAD 53 J/16 GANGA 63.00 13.00 33.0 1887 700 78° 49' 30° 0' R 50 0.64 0.99 1.55 240 370 582
194 U.P. GARHWAL KALGADI 53 J/6 GANGA 38.80 13.00 33.0 2640 1000 78° 54' 30° 7' R 50 0.42 0.64 1.01 156 240 378
195 U.P. GARHWAL KHANDA 53 J/12,16 ALAKNANDA 107.80 14.20 46.5 2143 400 78° 45' 30° 13' R 50 1.03 1.59 2.50 387 597 939
196 U.P. GARHWAL KHATAL 53 O/1 GANGA 117.50 22.50 42.0 2429 1160 79° 1' 29° 49' R 40 1.11 1.72 2.70 334 515 811
197 U.P. GARHWAL KUTLI 53 J/16 GANGA 19.80 6.00 18.0 2066 947 78° 53' 30° 6' R 100 0.23 0.35 0.55 171 264 415
198 U.P. GARHWAL LIR 53 J/15,16,N/3,4 ALAKNANDA 41.30 13.00 25.0 2881 760 78° 59' 30° 17' R 60 0.44 0.68 1.07 198 305 479
199 U.P. GARHWAL MASANGARI 53 N/4, O/1 RAM GANGA 48.50 13.00 30.0 2913 1080 79° 13' 29° 56' R 40 0.51 0.78 1.23 152 234 369
200 U.P. GARHWAL PASOL 53 O/1 GANGA 50.00 14.50 28.0 2100 1280 79° 3' 29° 56' R 50 0.52 0.80 1.26 195 301 474
201 U.P. GARHWAL PATLIYUN 53 O/2 RAM GANGA 46.80 11.00 25.5 1835 665 79° 5' 29° 39' R 40 0.49 0.76 1.19 147 227 357
202 U.P. GARHWAL PIN 53 J/16 GANGA 30.50 10.00 24.0 2503 900 78° 52' 30° 4' R 100 0.34 0.52 0.81 251 388 610
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
8
S.No. STATE DISTRICT CATCHMENT RTS STM BSN A SqKm
L Km
P Km
Zh m
Zl m
LON LAT FED HEAD Dependable Discharge Power
90% 75% 50% 90% 75% 50%
203 U.P. GARHWAL PURVI GANGA 53 N/4, O/1 GANGA 160.00 19.00 51.5 2980 1420 79° 2' 29° 58' R 40 1.47 2.26 3.56 440 678 1068
204 U.P. GARHWAL RANDI 53 J/12,16 GANGA 123.00 19.00 44.0 2143 600 78° 35' 30° 7' R 40 1.16 1.79 2.82 348 537 845
205 U.P. GARHWAL SYOLI 53 J/16, N/4 GANGA 95.30 16.00 46.0 3007 1120 78° 59' 30° 9' R 80 0.92 1.43 2.24 555 855 1346
206 U.P. GARHWAL TAIRI 53 J/12 GANGA 17.30 7.00 17.0 1740 500 78° 36' 30° 3' R 40 0.20 0.31 0.49 61 94 147
207 U.P. GARHWAL THAN 53 J/12 GANGA 35.00 9.00 23.0 2149 500 78° 38' 30° 2' R 60 0.38 0.58 0.92 170 263 414
208 U.P. NAINITAL BALIA 53 O/7,11 GOLA 74.00 13.00 29.0 248 546 79° 33' 29° 17' R 40 0.74 1.14 1.79 221 341 537
209 U.P. NAINITAL BAUR 53 O/7 BAUR 50.00 7.50 27.0 2611 700 79° 21' 29° 23' R 100 0.52 0.80 1.26 390 602 947
210 U.P. NAINITAL DABKA 53 O/7 DABKA 59.50 10.00 24.0 2623 760 79° 20' 29° 26' R 60 0.61 0.94 1.47 273 422 664
211 U.P. NAINITAL GOLA 53 O/11,15 GOLA 248.50 24.00 64.5 2320 783 79° 40' 29° 17' R 40 2.17 3.35 5.27 651 1004 1580
212 U.P. NAINITAL HALKULA 53 O/10,11 KOSI 40.50 8.00 21.0 2296 1120 79° 34' 29° 33' R 80 0.43 0.67 1.05 259 399 628
213 U.P. NAINITAL KALI 53 O/10,11 KOSI 159.80 18.00 42.0 2346 1104 79° 38' 29° 33' R 20 1.47 2.26 3.55 220 339 533
214 U.P. NAINITAL KALSA 53 O/11 GOLA 125.00 18.00 40.0 2393 1080 79° 38' 29° 20' R 80 1.18 1.82 2.86 706 1089 1714
215 U.P. NAINITAL LADHIYA 53 O/15 LADHIYA 156.50 20.00 54.0 2195 940 79° 53' 29° 7' R 20 1.44 2.22 3.49 216 333 523
216 U.P. NAINITAL NAURAR 53 O/6 RAM GANGA 61.00 8.00 28.5 2016 755 79° 16' 29° 42' R 20 0.62 0.96 1.51 93 144 226
217 U.P. NAINITAL NINGLAT 53 O/7,11 KOSI 67.30 6.00 29.5 2481 1024 79° 28' 29° 27' R 40 0.68 1.05 1.65 203 314 494
218 U.P. PITHORAGARH BHADELI 62 B/4,8 GORIGANGA 17.80 8.00 19.0 2850 1280 80° 17' 30° 5' R 50 0.21 0.32 0.50 78 120 189
219 U.P. PITHORAGARH BHANARI 62 C/1,2 RAM GANGA 60.50 10.50 34.0 2362 252 80° 7' 29° 45' R 40 0.62 0.95 1.50 185 285 449
220 U.P. PITHORAGARH BINO 53 N/4, O/1 RAM GANGA 95.80 15.00 40.0 2801 960 79° 14' 29° 54' R 40 0.93 1.43 2.25 279 430 676
221 U.P. PITHORAGARH CHAMUN 62 C/2 RAM GANGA 18.50 6.50 18.0 1901 800 80° 7' 29° 42' R 80 0.21 0.33 0.52 129 199 313
222 U.P. PITHORAGARH CHANDRA BHAGA 62 C/1 RAMGANGA 34.00 10.00 26.0 2103 837 80° 9' 29° 5' R 40 0.37 0.57 0.90 111 171 269
223 U.P. PITHORAGARH CHARMA 62 C/2,5,6 KALI 66.50 17.50 36.0 2366 600 80° 23' 29° 42' R 40 0.67 1.03 1.63 201 310 488
224 U.P. PITHORAGARH DIBLA 62 B/4 GORIGANGA 53.00 8.00 28.0 5643 2400 80° 13' 30° 18' S,G,R 50 0.55 0.85 1.33 206 317 499
225 U.P. PITHORAGARH DOKANNA 62 C/1 RAM GANGA 27.00 6.00 17.0 2318 800 80° 8' 29° 52' R 60 0.30 0.46 0.73 135 209 328
226 U.P. PITHORAGARH DUK KI GAD 62 C/9 KALI 27.00 7.50 20.0 4144 1400 80° 34' 29° 59' R 120 0.30 0.46 0.73 271 417 656
227 U.P. PITHORAGARH GHAT 62 C/6 KALI 34.50 8.50 22.0 2330 490 80° 21' 29° 33' R 160 0.37 0.58 0.91 449 692 1089
228 U.P. PITHORAGARH GODI 53O/13,14,62C/1,2 SARJU 78.80 17.50 50.0 2168 700 79° 55' 29° 42' R 100 0.78 1.20 1.89 585 903 1420
229 U.P. PITHORAGARH GOKARNESHWAR 62 C/2 RAM GANGA 25.00 6.00 17.5 2122 800 80° 7' 29° 37' R 200 0.28 0.43 0.68 421 649 1022
230 U.P. PITHORAGARH GURGHATIYA 62 C/1 RAMGANGA 52.50 10.00 26.5 2088 800 80° 8' 29° 48' R 40 0.54 0.84 1.32 163 251 396
231 U.P. PITHORAGARH JAKULA 62 B/4, C/1 RAMGANGA 117.50 18.00 43.5 4133 1000 80° 7' 29° 57' S,R 100 1.11 1.72 2.70 836 1288 2027
232 U.P. PITHORAGARH JIMBA 62 B/8 GORIGANGA 109.30 14.50 44.5 5773 1280 80° 21' 30° 2' S,G,R 100 1.04 1.61 2.53 783 1208 1901
233 U.P. PITHORAGARH JIUNTI 62 B/12, C/9 KALI 32.00 8.50 24.0 4073 1200 80° 37' 29° 58' R 280 0.35 0.54 0.85 734 1132 1782
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
9
S.No. STATE DISTRICT CATCHMENT RTS STM BSN A SqKm
L Km
P Km
Zh m
Zl m
LON LAT FED HEAD Dependable Discharge Power
90% 75% 50% 90% 75% 50%
234 U.P. PITHORAGARH KALAPANI 62 C/2,6 RAM GANGA 108.30 15.00 41.0 2487 668 80° 8' 29° 40' R 20 1.04 1.60 2.51 155 240 377
235 U.P. PITHORAGARH KANCHUTI 62 B/12 DHAULI GANGA 27.30 6.00 21.5 4560 1480 80° 34' 30° 2' S,R 100 0.30 0.47 0.74 228 351 552
236 U.P. PITHORAGARH KANCHUTI 62 B/8,12 DHAULIGANGA 28.00 8.50 20.5 4560 1400 80° 34' 30° 2' S,R 100 0.31 0.48 0.75 233 359 565
237 U.P. PITHORAGARH KATI YANI 62 C/6 KALI 43.30 7.50 24.0 2487 520 80° 25' 29° 37' R 200 0.46 0.71 1.11 687 1059 1666
238 U.P. PITHORAGARH KIN 62 C/2 RAM GANGA 23.00 5.50 12.5 2122 640 80° 6' 29° 36' R 100 0.26 0.40 0.63 195 301 474
239 U.P. PITHORAGARH KULLA 62 C/9 KALI 27.00 8.50 21.5 3417 967 80° 34' 29° 54' R 200 0.30 0.46 0.73 451 695 1094
240 U.P. PITHORAGARH KWIRI 62 B/4,8 GORIGANGA 48.30 8.00 26.0 5102 1400 80° 15' 30° 8' S,R 100 0.50 0.78 1.22 378 584 918
241 U.P. PITHORAGARH LASPA 62 B/3 GORIGANGA 34.30 5.00 22.0 5643 2965 80° 13' 30° 17' S,G,R 100 0.37 0.57 0.90 279 430 677
242 U.P. PITHORAGARH MADKANI 62 B/8 GORI GANGA 208.00 10.00 56.5 6904 1200 80° 18' 30° 3' S,G,R 100 1.85 2.86 4.50 1390 2143 3372
243 U.P. PITHORAGARH MANGARH 62 C/2 RAM GANGA 34.80 9.00 24.0 2361 715 80° 7' 29° 43' R 100 0.38 0.58 0.91 283 436 686
244 U.P. PITHORAGARH NAGLING 62 B/8,12 DHAULIGANGA 31.00 6.50 23.0 6041 2800 80° 35' 30° 11' S,G,R 100 0.34 0.52 0.82 255 393 619
245 U.P. PITHORAGARH NANDARMA 62 B/12 DHAULI GANGA 38.00 6.50 27.0 6169 2120 80° 37' 30° 5' S,G,R 200 0.41 0.63 0.99 611 943 1483
246 U.P. PITHORAGARH NARGOL 53 O/14, 62 C/2 SARJU 32.50 10.00 22.0 2361 640 79° 58' 29° 39' R 80 0.35 0.55 0.86 213 328 516
247 U.P. PITHORAGARH OKHAL 62 C/2,3,6,7 KALI 117.50 18.00 47.0 2330 426 80° 16' 29° 27' R 40 1.11 1.72 2.70 334 515 811
248 U.P. PITHORAGARH PACHHU 62 B/3 GORI GANGA 54.30 5.50 32.0 6460 3360 80° 10' 30° 24' S,G,R 100 0.56 0.86 1.36 420 648 1019
249 U.P. PITHORAGARH PAINA 62 B/8 GORIGANGA 85.50 15.00 45.0 6041 1280 80° 21' 30° 2' S,G,R 100 0.84 1.29 2.04 629 971 1527
250 U.P. PITHORAGARH PANGLA 62 B/12, C/9 KALI 20.50 3.00 12.5 3646 1400 80° 42' 29° 58' S,R 240 0.24 0.36 0.57 423 653 1027
251 U.P. PITHORAGARH PILTI 62 B/8 GORIGANGA 28.80 7.00 20.0 5033 1800 80° 16' 30° 11' S,R 100 0.32 0.49 0.77 239 368 579
252 U.P. PITHORAGARH RELA 62 C/9 KALI 29.50 9.00 22.0 3481 1000 80° 34' 29° 55' R 200 0.33 0.50 0.79 488 752 1184
253 U.P. PITHORAGARH SELA 62 B/12 DHAULIGANGA 123.00 7.50 41.5 6215 2290 80° 32' 30° 8' S,G,R 600 1.16 1.79 2.82 5222 8052 12670
254 U.P. PITHORAGARH SENAR 62 B/4,8 GORIGANGA 30.80 10.00 23.0 4013 1600 80° 15' 30° 7' S,R 100 0.34 0.52 0.82 254 391 615
255 U.P. PITHORAGARH SHANGRI 62 C/6 KAL 43.50 12.50 26.0 2487 560 80° 23' 29° 40' R 50 0.46 0.71 1.12 172 266 418
256 U.P. PITHORAGARH SHILANG 62 C/2 SARJU 55.30 10.50 29.0 2489 502 80° 8' 29° 31' R 100 0.57 0.88 1.38 427 658 1036
257 U.P. PITHORAGARH SHYAMKHOLA 62 B/12 KALI 47.80 9.00 26.0 5015 1500 80° 43' 30° 0' S,R 200 0.50 0.77 1.21 750 1156 1820
258 U.P. PITHORAGARH SOBLA 62 B/12 KHARI DARMA GANGA
99.46 11.24 37.38 5572 1720 80-35-00 30-03-00 RF 120 0.96 1.48 2.33 864 1333 2097
259 U.P. PITHORAGARH TANAR 62 C/2 RAM GANGA 39.00 8.50 22.0 2185 582 80° 7' 29° 37' R 100 0.42 0.64 1.01 313 482 759
260 U.P. PITHORAGARH TIJAM 62 B/8,12 DHAULIGANGA 115.30 10.60 44.0 6041 2000 80° 35' 30° 4' S,G,R 120 1.10 1.69 2.66 986 1520 2392
261 U.P. PITHORAGARH TIMPHU 62 B/3 GORIGANGA 30.00 2.50 25.0 6389 3400 80° 8' 30° 26' S,G,R 100 0.33 0.51 0.80 248 382 601
262 U.P. PITHORAGARH TITAR 62 C/1,2 RAM GANGA 26.00 5.50 20.0 1494 733 80° 8' 29° 44' R 40 0.29 0.45 0.71 87 134 212
263 U.P. PITHORAGARH TOLA 62 C/2 SARJU 24.00 3.50 14.0 2167 549 80° 2' 29° 33' R 100 0.27 0.42 0.66 203 313 493
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
10
S.No. STATE DISTRICT CATCHMENT RTS STM BSN A SqKm
L Km
P Km
Zh m
Zl m
LON LAT FED HEAD Dependable Discharge Power
90% 75% 50% 90% 75% 50%
264 U.P. TEHRI BHATYWARI-II 53 J/14,15 BONGA GAD MANDAKINI
145.19 22.27 60.98 3750 676 78-55-30 30-27-00 SF 80 1.35 2.07 3.26 807 1244 1958
265 U.P. TEHRI CHANDI 53 J/14,15 LASTAR GAD MANDAKINI
179.42 25.91 68.95 3750 674 78-55-00 30-25-15 SF 80 1.62 2.50 3.94 975 1503 2365
266 U.P. TEHRI DANG 53 J/15 DHUNDSIR GAD ALAKNANDA
42.84 11.22 28.04 2300 78-46-00 30-16-00 RF 80 0.45 0.70 1.10 272 420 660
267 U.P. TEHRI DHARI 53 J/15 BADIYAR GAD ALAKNANDA
66.45 13.30 35.48 2706 600 78-53-00 30-16-30 RF 60 0.67 1.03 1.63 302 465 732
268 U.P. TEHRI HELAUM 53 J/15 HELAUM GAD MANDAKINI
60.23 12.2 35.51 2844 676 78-55-00 30-22-00 0.61 0.95 1.49 0 0 0
269 U.P. TEHRI KHALYAN 53 J/14,15 BONGA GAD MANDAKINI
105.42 19.34 46.34 3750 676 78-55-20 30-27-40 RF 160 1.01 1.56 2.45 1214 1871 2945
270 U.P. TEHRI PANJAN 53 J/14,15 LASTAR GAD MANDAKINI
152.93 23.24 61.74 3776 676 78-55-30 30-26-15 RF 80 1.41 2.17 3.42 845 1303 2051
271 U.P. TEHRI SAN 53 J/14,15 BONGA GAD MANDAKINI
94.85 17.09 88.4 3750 676 78-55-30 30-29-00 RF 100 0.92 1.42 2.23 690 1065 1675
272 U.P. TEHRI SIRWARI 53 J/14,15 BONGA GAD MANDAKINI
96.57 16.89 42.47 3776 676 78-55-30 30-29-00 RF 80 0.94 1.44 2.27 561 865 1362
273 U.P. TEHRI THAPLA 53 J/14,15 LASTAR GAD MANDAKINI
186.92 28.41 69.46 3776 676 78-55-30 30-23-30 RF 100 1.68 2.60 4.09 1263 1948 3066
274 U.P. TEHRI GARHWAL
ARGAD 53 J/10,11 BHILANGANA 35.30 11.00 25.0 2779 920 78° 38' 30° 29' R 100 0.38 0.59 0.93 286 441 695
275 U.P. TEHRI GARHWAL
BADIYAR 53 J/15 ALAKNANDA 76.30 16.00 38.0 2706 600 78° 55' 30° 16' R 80 0.76 1.17 1.84 455 702 1104
276 U.P. TEHRI GARHWAL
BAL GANGA 53 J/10,14 BHAGIRATHI 123.00 17.00 49.0 4846 1360 78° 42' 30° 35' S,R 100 1.16 1.79 2.82 870 1342 2112
277 U.P. TEHRI GARHWAL
BARODA 53 J/14 BHILANGANA 12.50 5.00 14.5 5154 2640 78° 52' 30° 42' S,R 240 0.15 0.23 0.37 273 420 661
278 U.P. TEHRI GARHWAL
BHADRI 53 J/2 YAMUNA 103.80 25.00 45.0 2593 900 78° 0' 30° 35' R 80 1.00 1.54 2.42 599 923 1452
279 U.P. TEHRI GARHWAL
BHALDIYANA 53 J/7 BHALDIYANA 22.50 8.00 19.5 2484 720 78° 26' 30° 28' R 160 0.26 0.39 0.62 307 473 744
280 U.P. TEHRI GARHWAL
BHANDARI 53 J/15 ALAKNANDA 37.80 15.00 31.5 2571 600 78° 55' 30° 16' R 120 0.41 0.63 0.98 365 563 886
281 U.P. TEHRI GARHWAL
CHANDRABHAGA 53 J/11,12 ALAKNANDA 48.50 11.00 23.0 2278 500 78° 41' 30° 13' R 80 0.51 0.78 1.23 304 469 737
282 U.P. TEHRI GARHWAL
CHANDRABHAGA 53 J/7,11 BHAGIRATHI 71.50 8.50 29.0 2368 600 78° 30' 30° 17' R 100 0.72 1.10 1.74 537 828 1303
283 U.P. TEHRI GARHWAL
CHHIRA 53 J/14 BHILANGANA 26.00 7.00 21.5 3583 2600 78° 50' 30° 35' S,R 200 0.29 0.45 0.71 436 672 1058
284 U.P. TEHRI GARHWAL
DAGAR 53 J/11,15 ALAKNANDA 63.50 18.00 36.0 2501 680 78° 43' 30° 17' R 60 0.64 0.99 1.56 290 447 703
285 U.P. TEHRI GARHWAL
DAMAR 53J/14,15,N/2,3 MANDAKINI 96.80 20.00 49.0 3353 960 79° 5' 30° 27' R 80 0.94 1.45 2.27 562 867 1365
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
11
S.No. STATE DISTRICT CATCHMENT RTS STM BSN A SqKm
L Km
P Km
Zh m
Zl m
LON LAT FED HEAD Dependable Discharge Power
90% 75% 50% 90% 75% 50%
286 U.P. TEHRI GARHWAL
DAYARA 53 J/7,11 BHAGIRATHI 13.80 4.50 17.0 2711 680 78° 30' 30° 23' R 200 0.17 0.25 0.40 248 382 602
287 U.P. TEHRI GARHWAL
DHARAM GANGA 53 J/10 BHAGIRATHI 135.80 20.00 56.0 4077 1320 78° 38' 30° 35' R 40 1.27 1.95 3.08 380 586 923
288 U.P. TEHRI GARHWAL
DHARAMGHAT 53 J/7 BHAGIRATHI 33.00 6.00 40.0 2191 600 78° 29' 30° 20' R 160 0.36 0.55 0.87 431 665 1047
289 U.P. TEHRI GARHWAL
DHAULDHAR 53 J/12 BHAGIRATHI 16.30 5.50 17.0 2276 600 78° 35' 30° 11' R 200 0.19 0.30 0.47 288 444 698
290 U.P. TEHRI GARHWAL
DHUNDSIR 53 J/11,12,N/5,16 ALAKNANDA 50.00 16.70 35.5 2293 720 78° 45' 30° 13' R 100 0.52 0.80 1.26 390 602 947
291 U.P. TEHRI GARHWAL
DHUNGMANDAR 53 J/11 BHILANGANA 45.80 10.50 26.0 2711 755 78° 37' 30° 24' R 140 0.48 0.74 1.17 505 779 1226
292 U.P. TEHRI GARHWAL
DIULI 53 J/3,7 YAMUNA 32.30 4.50 23.5 2620 1286 78° 13' 30° 29' R 60 0.35 0.54 0.86 159 245 385
293 U.P. TEHRI GARHWAL
DWARI 53 J/11 BHAGIRATHI 18.80 6.00 18.0 2501 900 78° 38' 30° 25' R 140 0.22 0.34 0.53 229 353 555
294 U.P. TEHRI GARHWAL
GADOLIA 53 J/11 BHAGIRATHI 29.80 6.50 25.0 2384 800 78° 34' 30° 22' R 140 0.33 0.51 0.80 345 531 836
295 U.P. TEHRI GARHWAL
GAIR 53 J/10,11 BHILANGANA 14.30 6.00 15.0 2699 1000 78° 44' 30° 30' R 200 0.17 0.26 0.41 256 395 621
296 U.P. TEHRI GARHWAL
GARHKOT 53 J/12 ALAKNANDA 19.80 6.00 16.5 1694 600 78° 38' 30° 13' R 100 0.23 0.35 0.55 171 264 415
297 U.P. TEHRI GARHWAL
GAWANA 53 J/14 BHILANGANA 12.50 6.00 15.0 3421 1560 78° 47' 30° 32' R 120 0.15 0.23 0.37 136 210 331
298 U.P. TEHRI GARHWAL
GONGAD 53 J/10 BHILANGANA 42.30 10.00 28.0 2794 1080 78° 38' 30° 31' R 40 0.45 0.69 1.09 135 207 326
299 U.P. TEHRI GARHWAL
GULAR 53 J/8 GANGA 87.80 10.50 36.0 2240 400 78° 26' 30° 7' R 100 0.86 1.33 2.09 645 994 1564
300 U.P. TEHRI GARHWAL
HELAUN 53 J/15 MANDAKINI 70.00 18.00 41.0 2844 880 78° 56' 30° 22' R 120 0.70 1.08 1.70 632 975 1534
301 U.P. TEHRI GARHWAL
HENVAL 53 J/2 GANGA 167.50 19.50 50.0 2770 760 78° 22' 30° 15' R 40 1.53 2.36 3.71 458 707 1112
302 U.P. TEHRI GARHWAL
JAKHAN 53 J/3,7 SONG 40.00 8.00 22.0 2214 800 78° 16' 30° 15' R 160 0.43 0.66 1.04 512 789 1242
303 U.P. TEHRI GARHWAL
JOLA 53 J/11,15 BHILANGANA 155.00 28.00 38.5 3101 1031 78° 42' 30° 28' R 100 1.43 2.20 3.46 1069 1649 2595
304 U.P. TEHRI GARHWAL
KAIRI 53 J/13,14 BHILANGANA 39.80 6.50 24.5 5990 2880 78° 54' 30° 44' S,G,R 320 0.42 0.65 1.03 1019 1572 2473
305 U.P. TEHRI GARHWAL
KALIANI 53 J/14 BHILANGANA 15.00 3.50 13.5 4570 2475 78° 51' 30° 41' S,R 160 0.18 0.27 0.43 214 330 519
306 U.P. TEHRI GARHWAL
KAN 53 J/14,15 BHILANGANA 24.80 6.50 20.0 3171 1520 78° 47' 30° 32' R 80 0.28 0.43 0.68 167 258 406
307 U.P. TEHRI GARHWAL
KANJUL 53 J/14 BHILANGANA 17.50 7.00 17.0 4645 2280 78° 52' 30° 38' S,R 200 0.20 0.32 0.50 306 473 744
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
12
S.No. STATE DISTRICT CATCHMENT RTS STM BSN A SqKm
L Km
P Km
Zh m
Zl m
LON LAT FED HEAD Dependable Discharge Power
90% 75% 50% 90% 75% 50%
308 U.P. TEHRI GARHWAL
KOT 53 J/7,8 BHAGIRATHI 16.50 5.00 16.0 2250 500 78° 30' 30° 16' R 140 0.19 0.30 0.47 204 314 494
309 U.P. TEHRI GARHWAL
KYARI 53 J/2,3 AGLAR 25.00 6.00 17.0 2835 1160 78° 8' 30° 30' R 50 0.28 0.43 0.68 105 162 255
310 U.P. TEHRI GARHWAL
LASTAR 53 J/14,15 MANDAKINI 147.00 21.00 58.0 3750 1400 78° 55' 30° 27' R 160 1.36 2.10 3.30 1632 2517 3960
311 U.P. TEHRI GARHWAL
LOM 53 J/10,14 BHILANGANA 20.50 5.50 18.0 3344 1400 78° 46' 30° 31' R 160 0.24 0.36 0.57 282 435 685
312 U.P. TEHRI GARHWAL
MANIYAR 53 J/7 BHAGIRATHI 48.00 9.50 28.5 2484 640 78° 28' 30° 26' R 40 0.50 0.77 1.22 151 232 365
313 U.P. TEHRI GARHWAL
MEDH 53 J/10 BHILANGANA 24.00 8.00 20.5 2794 1320 78° 38' 30° 35' R 160 0.27 0.42 0.66 325 501 788
314 U.P. TEHRI GARHWAL
NAGUN 53 J/2,6 BHAGIRATHI 115.80 20.00 52.5 2589 800 78° 20' 30° 33' R 20 1.10 1.70 2.67 165 254 400
315 U.P. TEHRI GARHWAL
NAILCHAMI 53 J/11,15 BHILANGANA 93.00 18.00 45.0 2755 855 78° 40' 30° 26' R 60 0.90 1.39 2.19 407 628 988
316 U.P. TEHRI GARHWAL
NAINI 53 J/15,16 ALAKNANDA 15.00 6.00 19.0 1931 540 78° 47' 30° 13' R 100 0.18 0.27 0.43 134 206 324
317 U.P. TEHRI GARHWAL
ONGAD 53 J/7,11 BHAGIRATHI 27.50 4.50 20.0 2569 966 78° 30' 30° 28' R 100 0.31 0.47 0.74 229 353 556
318 U.P. TEHRI GARHWAL
PALETHI 53 J/11,12 BHAGIRATHI 37.80 8.00 25.7 1912 640 78° 34' 30° 13' R 60 0.41 0.63 0.98 183 281 443
319 U.P. TEHRI GARHWAL
PALI 53 J/2,3 YAMUNA 62.30 7.50 25.5 3022 1200 78° 10' 30° 30' R 40 0.63 0.98 1.54 190 293 461
320 U.P. TEHRI GARHWAL
PANGRANA 53 J/10 BHILANGANA 24.50 8.00 22.0 3424 1800 78° 30' 30° 38' R 200 0.28 0.43 0.67 414 638 1003
321 U.P. TEHRI GARHWAL
POKHRI 53 J/7,8 BHAGIRATHI 24.30 7.50 21.0 2250 600 78° 30' 30° 16' R 160 0.27 0.42 0.66 328 506 797
322 U.P. TEHRI GARHWAL
POR 53 J/14,15 BHILANGANA 15.00 6.00 17.0 2776 1400 78° 45' 30° 31' R 200 0.18 0.27 0.43 267 412 648
323 U.P. TEHRI GARHWAL
SILOLI 53 J/11 BHAGIRATHI 17.50 5.50 16.0 2366 800 78° 33' 30° 22' R 180 0.20 0.32 0.50 276 425 669
324 U.P. TEHRI GARHWAL
SIRKANDA 53 J/7 BHAGIRATHI 85.80 12.00 37.0 2770 700 78° 24' 30° 29' R 80 0.84 1.30 2.04 505 779 1226
325 U.P. TEHRI GARHWAL
SONG 53 J/3,7 SONG 85.30 20.00 41.0 2770 800 78° 12' 30° 12' R 40 0.84 1.29 2.03 251 387 610
326 U.P. TEHRI GARHWAL
TAKOLI 53 J/11 ALAKNANDA 53.50 10.50 33.0 2268 700 78° 38' 30° 17' R 60 0.55 0.85 1.34 249 384 604
327 U.P. TEHRIGARHWAL BHARPUR 53 J/12 GANGA 25.30 6.00 21.5 2276 400 78° 35' 30° 7' R 120 0.28 0.44 0.69 255 394 620
328 U.P. UTTARKASHI ASI GANGA 53 J/5,9 BHAGIRATHI 202.80 23.00 60.0 4525 1132 78° 27' 30° 45' R 40 1.81 2.79 4.40 543 838 1319
329 U.P. UTTARKASHI ATHALI 53 J/5,6 BHAGIRATHI 27.30 6.00 20.0 2733 1000 78° 21' 30° 44' R 80 0.30 0.47 0.74 182 281 442
330 U.P. UTTARKASHI BADYAR 53 J/15 YAMUNA 71.00 9.00 37.0 3363 1206 78° 15' 30 50' R 40 0.71 1.10 1.73 213 329 518
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
13
S.No. STATE DISTRICT CATCHMENT RTS STM BSN A SqKm
L Km
P Km
Zh m
Zl m
LON LAT FED HEAD Dependable Discharge Power
90% 75% 50% 90% 75% 50%
331 U.P. UTTARKASHI BANAL 53 J/1 YAMUNA 60.30 12.00 32.5 2720 1200 78° 15' 30° 49' R 40 0.61 0.95 1.49 184 284 448
332 U.P. UTTARKASHI BARNI 53 J/1,2 YAMUNA 92.00 15.50 41.0 2716 950 78° 5' 30° 43' R 40 0.90 1.38 2.17 269 414 652
333 U.P. UTTARKASHI BENAL 53 F/13 TONS 105.30 15.00 43.0 2909 800 77° 52' 30° 50' R 50 1.01 1.56 2.45 379 584 919
334 U.P. UTTARKASHI BHELA 53 J/9,13 BHAGIRATHI 20.00 7.00 18.0 5245 2500 78° 42' 30° 59' S,R 400 0.23 0.35 0.56 690 1064 1675
335 U.P. UTTARKASHI BHILANGANA 53J/13,14,N/1,2 BHILANGANA 198.80 9.50 63.0 6901 2920 78° 54' 30° 44' S,G,R 100 1.78 2.74 4.32 1335 2058 3239
336 U.P. UTTARKASHI DARA 53 F/13 TONS 96.30 15.00 43.3 3869 840 77° 50' 30° 53' R 100 0.93 1.44 2.26 700 1079 1698
337 U.P. UTTARKASHI DASKI 53 J/2,6 BHAGIRATHI 95.50 15.00 40.0 2716 970 78° 17' 30° 38' R 40 0.93 1.43 2.25 278 428 674
338 U.P. UTTARKASHI DHANARI 53 J/6 BHAGIRATHI 119.30 17.00 43.0 2711 919 78° 21' 30° 41' R 80 1.13 1.74 2.74 678 1045 1644
339 U.P. UTTARKASHI DHARMI 53 F/13 TONS 46.30 8.50 27.0 2888 967 77° 53' 31° 57' R 50 0.49 0.75 1.18 182 281 442
340 U.P. UTTARKASHI DHEDAR 53 E/16 PABBAR 30.80 9.00 22.0 3500 1800 77° 54' 31° 5' R 200 0.34 0.52 0.82 507 782 1230
341 U.P. UTTARKASHI DHUMRALI 53 E/16, I/4 TONS 23.00 9.00 23.5 3117 1160 78° 2' 31° 1' R 80 0.26 0.40 0.63 156 241 379
342 U.P. UTTARKASHI DICHLI 53 J/6 BHAGIRATHI 47.30 15.00 28.0 2761 720 78° 21' 30° 33' R 80 0.50 0.76 1.20 297 458 721
343 U.P. UTTARKASHI DINA 53 J/9 BHAGIRATHI 47.00 8.00 31.0 4045 1600 78° 40' 30° 53' R 240 0.49 0.76 1.20 887 1367 2151
344 U.P. UTTARKASHI DUDU 53 I/6, J/13 BHAGIRATHI 28.00 8.50 27.5 5970 2600 78° 5' 31° 3' S,G,R 100 0.31 0.48 0.75 233 359 565
345 U.P. UTTARKASHI DUGADDA 53 J/9,10 BHAGIRATHI 40.00 10.00 26.5 3817 1487 78° 36' 30° 46' R 200 0.43 0.66 1.04 640 987 1553
346 U.P. UTTARKASHI GADU 53 I/4,J/1 TONS 74.50 20.00 45.0 3812 1130 78° 2' 31° 2' R 80 0.74 1.14 1.80 445 687 1081
347 U.P. UTTARKASHI GAMRI 53 J/6 BHAGIRATHI 32.80 6.00 22.0 2695 800 78° 20' 30° 38' R 80 0.36 0.55 0.87 215 331 520
348 U.P. UTTARKASHI GANWAN 53 J/5,9 BHAGIRATHI 30.50 14.50 24.5 3804 1160 78° 28' 30° 45' R 160 0.34 0.52 0.81 402 620 976
349 U.P. UTTARKASHI GARTANG 53 I/16 BHAGIRATHI 19.80 5.00 17.0 5475 2800 78° 53' 31° 2' S,R 200 0.23 0.35 0.55 342 527 830
350 U.P. UTTARKASHI GUMGUM 53 I/16 BHAGIRATHI 16.80 6.00 16.0 5310 2545 78° 50' 31° 3' S,G,R 200 0.20 0.30 0.48 296 456 717
351 U.P. UTTARKASHI HANUMAN GANGA 53 J/5,9 YAMUNA 94.30 12.00 50.0 5548 2000 78° 24' 30° 56' S,R 160 0.92 1.41 2.22 1099 1695 2667
352 U.P. UTTARKASHI HARKIDUN 53 I/8,12 TONS 35.80 5.00 24.0 5890 3512 78° 26' 31° 9' S,G,R 200 0.39 0.60 0.94 580 894 1407
353 U.P. UTTARKASHI HELGU 53 J/9 BHAGIRATHI 14.30 6.00 14.0 4312 2020 78° 39' 30° 53' R 50 0.17 0.26 0.41 64 99 155
354 U.P. UTTARKASHI INDRAWATI 53 J/6,10 BHAGIRATHI 48.50 11.00 26.0 2939 1115 78° 27' 30° 43' R 80 0.51 0.78 1.23 304 469 737
355 U.P. UTTARKASHI ISTAR 53 F/16, I/4 TONS 37.30 7.00 25.0 3759 1800 78° 5' 31° 7' R 160 0.40 0.62 0.97 481 742 1167
356 U.P. UTTARKASHI JALANDHARI 53 I/12,16 BHAGIRATHI 175.80 19.00 63.0 5959 2458 78° 45' 31° 2' S,G,R 200 1.60 2.46 3.87 2393 3689 5805
357 U.P. UTTARKASHI JALKUR 53 J/6,10 BHAGIRATHI 104.30 9.50 40.0 3308 1320 78° 30' 30° 33' R 50 1.00 1.54 2.43 376 579 912
358 U.P. UTTARKASHI JAMDAR 53 I/8,12 TONS 119.80 5.00 57.0 6251 3320 78° 25' 31° 8' S,G,R 80 1.13 1.75 2.75 680 1049 1650
359 U.P. UTTARKASHI KAKORA 53 I/12,16 BHAGIRATHI 92.50 15.50 50.5 6075 2680 78° 45' 31° 2' S,G,R 100 0.90 1.39 2.18 675 1041 1638
360 U.P. UTTARKASHI KAMAL 53 F/13, J/1 YAMUNA 232.50 19.00 69.0 3182 1100 78° 7' 30° 47' R 120 2.05 3.15 4.96 1841 2839 4468
361 U.P. UTTARKASHI KEDAR GANGA 53 J/3, N/1 BHAGIRATHI 76.80 6.50 39.5 6772 3000 78° 57' 30° 59' S,G,R 200 0.76 1.18 1.85 1144 1764 2776
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
14
S.No. STATE DISTRICT CATCHMENT RTS STM BSN A SqKm
L Km
P Km
Zh m
Zl m
LON LAT FED HEAD Dependable Discharge Power
90% 75% 50% 90% 75% 50%
362 U.P. UTTARKASHI KHERA 53 I/16, J/13 BHAGIRATHI 17.50 6.50 19.5 5245 2560 78° 50' 31° 3' S,G,R 280 0.20 0.32 0.50 429 662 1041
363 U.P. UTTARKASHI KHUNI 53 F/13, I/5 TONS 30.00 7.50 23.5 2853 840 77° 58' 31° 0' R 50 0.33 0.51 0.80 124 191 300
364 U.P. UTTARKASHI KHURMOLA 53 J/1,2,5,6 YAMUNA 79.50 15.00 35.5 2960 1000 78° 18' 30° 38' R 80 0.79 1.21 1.91 472 728 1145
365 U.P. UTTARKASHI KOLA 53 J/9 BHAGIRATHI 30.00 8.00 22.5 4265 1800 78° 40' 30° 53' R 280 0.33 0.51 0.80 693 1069 1683
366 U.P. UTTARKASHI KOTI 53 J/6 BHAGIRATHI 17.50 5.00 16.0 2711 1000 78° 22' 30° 42' R 160 0.20 0.32 0.50 245 378 595
367 U.P. UTTARKASHI KUTHNAUR 53 J/5 YAMUNA 25.80 6.50 20.0 3768 1480 78° 18' 30° 52' R 120 0.29 0.45 0.70 260 401 630
368 U.P. UTTARKASHI LIMCHA 53 J/9,13 BHAGIRATHI 19.50 6.00 18.5 5178 2000 78° 41' 30° 55' S,G,R 440 0.22 0.35 0.55 742 1145 1801
369 U.P. UTTARKASHI LOD 53 J/9,13 BHAGIRATHI 74.30 9.50 38.5 6133 2120 78° 42' 30° 57' S,G,R 240 0.74 1.14 1.80 1333 2056 3235
370 U.P. UTTARKASHI LUNA 53 J/1 TONS 37.50 8.00 23.0 2232 1024 78° 1' 31° 0' R 80 0.40 0.62 0.98 242 373 586
371 U.P. UTTARKASHI MAL 53 F/13, J/1 YAMUNA 48.50 7.00 30.0 2888 1360 78° 5' 30° 52' R 40 0.51 0.78 1.23 152 234 369
372 U.P. UTTARKASHI MANERI BHALI KAMAR 53 J/10 BHAGIRATHI 30.00 9.00 19.0 3424 1320 78° 32' 30° 44' R 120 0.33 0.51 0.80 297 458 721
373 U.P. UTTARKASHI MANINDA 53 I/8,12 TONS 29.50 8.50 26.0 5760 3512 78° 26' 31° 9' S,G,R 80 0.33 0.50 0.79 195 301 474
374 U.P. UTTARKASHI MANJI 53 I/4 TONS 66.50 10.00 32.5 4533 1640 78° 6' 31° 9' S,R 120 0.67 1.03 1.63 604 931 1465
375 U.P. UTTARKASHI MAUTAR 53 E/16, I/4 TONS 70.00 11.00 37.0 3430 1130 78° 2' 31° 2' R 80 0.70 1.08 1.70 421 650 1023
376 U.P. UTTARKASHI MIYAN 53 I/4, J/1 TONS 41.80 9.50 24.5 3767 1215 78° 4' 31° 3' R 160 0.44 0.68 1.08 532 821 1292
377 U.P. UTTARKASHI MIYANA 53 I/16,J/13 BHAGIRATHI 33.00 5.00 24.0 6572 2840 78° 54' 31° 0' S,G,R 200 0.36 0.55 0.87 539 831 1308
378 U.P. UTTARKASHI MORI 53 E/16, I/4 TONS 17.00 9.00 21.0 3117 1340 78° 0' 30° 59' R 50 0.20 0.31 0.48 75 115 181
379 U.P. UTTARKASHI MURAR 53 I/8 TONS 30.00 10.00 24.0 5048 2320 78° 18' 30° 7' S,R 200 0.33 0.51 0.80 495 764 1202
380 U.P. UTTARKASHI NAGUR 53 J/6,10 BHAGIRATHI 31.80 6.50 22.5 2579 1200 78° 30' 30° 33' R 160 0.35 0.54 0.84 417 644 1013
381 U.P. UTTARKASHI NAHAR 53 J/9 BHAGIRATHI 15.00 5.50 21.0 3804 1500 78° 37' 30° 48' R 360 0.18 0.27 0.43 481 741 1167
382 U.P. UTTARKASHI OBRA 53 I/4,8 TONS 101.00 16.00 51.0 5877 2200 78° 15' 31° 8' S,G,R 200 0.97 1.50 2.36 1460 2252 3544
383 U.P. UTTARKASHI PALI 53 J/5 YAMUNA 57.00 13.00 28.0 4383 1479 78° 18' 30° 53' S,R 80 0.58 0.90 1.42 351 541 852
384 U.P. UTTARKASHI PATHAR 53 J/1,5 YAMUNA 20.80 5.50 19.0 3093 1360 78° 15' 30° 50' R 120 0.24 0.37 0.58 214 331 520
385 U.P. UTTARKASHI PAUNTHI 53 J/1, I/8 YAMUNA 61.30 13.00 34.0 4517 1800 78° 13' 30° 57' S,R 120 0.62 0.96 1.51 562 866 1363
386 U.P. UTTARKASHI PILANG 53 J/5,9 BHAGIRATHI 169.00 20.00 52.0 5405 1520 78° 37' 30° 47' R 50 1.54 2.37 3.74 577 890 1401
387 U.P. UTTARKASHI RANO 53 J/5,6 BHAGIRATHI 40.50 15.00 28.0 3092 1000 78° 22' 30° 40' R 80 0.43 0.67 1.05 259 399 628
388 U.P. UTTARKASHI RISHI GANGA 53 I/8, J/5 YAMUNA 46.80 13.50 28.0 5048 2280 78° 25' 30° 37' S,R 40 0.49 0.76 1.19 147 227 357
389 U.P. UTTARKASHI RUDUGARA 53 J/13 BHAGIRATHI 69.80 8.90 38.1 6672 3000 78° 55' 30° 59' S,G,R 200 0.70 1.08 1.70 1051 1620 2550
390 U.P. UTTARKASHI RUINSARA 53 I/8,12 TONS 181.30 15.00 58.0 6316 2920 78° 23' 31° 7' S,G,R 40 1.64 2.53 3.98 492 758 1193
391 U.P. UTTARKASHI SALRA 53 I/4 TONS 15.30 6.00 15.0 3055 1175 78° 3' 31° 3' R 120 0.18 0.28 0.44 163 252 396
392 U.P. UTTARKASHI SARI 53 J/2 YAMUNA 48.50 10.00 28.0 2589 1000 78° 4' 30° 41' R 80 0.51 0.78 1.23 304 469 737
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
15
S.No. STATE DISTRICT CATCHMENT RTS STM BSN A SqKm
L Km
P Km
Zh m
Zl m
LON LAT FED HEAD Dependable Discharge Power
90% 75% 50% 90% 75% 50%
393 U.P. UTTARKASHI SARTIA 53 I/16, J/13 BHAGIRATHI 17.80 6.00 17.0 5282 2500 78° 53' 31° 3' S,G,R 400 0.21 0.32 0.50 622 959 1510
394 U.P. UTTARKASHI SAURI 53 J/5 YAMUNA 40.50 13.50 26.5 4333 2200 78° 24' 30° 57' S,R 200 0.43 0.67 1.05 647 998 1570
395 U.P. UTTARKASHI SIYAN 53 I/12 BHAGIRATHI 102.80 12.00 35.0 5764 2520 78° 43' 31° 3' S,G,R 120 0.99 1.52 2.40 890 1372 2160
396 U.P. UTTARKASHI SIYAN 53 I/8 TONS 56.30 12.50 33.0 4702 2200 78° 16' 31° 5' S,R 240 0.58 0.89 1.40 1041 1606 2527
397 U.P. UTTARKASHI SON 53 J/9, I/12 BHAGIRATHI 50.30 5.50 26.0 4850 2360 78° 42' 30° 58' R 200 0.52 0.81 1.27 785 1210 1904
398 U.P. UTTARKASHI SUPIN 53 I/4,7,8 TONS 168.00 22.00 66.0 5712 2075 78° 15' 31° 8' S,G,R 80 1.53 2.36 3.72 919 1417 2230
399 U.P. UTTARKASHI SUWARI 53 J/9 BHAGIRATHI 37.30 13.00 29.0 4312 1680 78° 37' 30° 51' R 200 0.40 0.62 0.97 601 927 1459
400 U.P. UTTARKASHI SYALAM 53 J/5,6 BHAGIRATHI 43.80 13.00 30.0 3417 1160 78° 25' 30° 44' R 200 0.46 0.71 1.12 694 1070 1684
401 U.P. UTTARKASHI TARAMANDAL 53 E/16 PABAR 54.30 12.50 21.8 3940 1800 77° 54' 31° 6' R 80 0.56 0.86 1.36 336 518 815
402 U.P. UTTARKASHI TEL 53 I/16, J/13 BHAGIRATHI 16.80 4.50 17.5 5245 2465 78° 45' 31° 3' S,G,R 400 0.20 0.30 0.48 591 911 1434
403 U.P. UTTARKASHI UNATA 53 J/5,9 YAMUNA 34.80 11.00 24.0 5006 2432 78° 26' 30° 57' R 160 0.38 0.58 0.91 452 697 1097
404 U.P. UTTARKASHI YAMUNA 53 I/8, J/5 YAMUNA 32.80 5.50 22.5 5420 2432 78° 26' 30° 57' S,R 80 0.36 0.55 0.87 215 331 520
204597 315473 496447
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
1
Bihar
S.NO. STATE DISTRICT CATCHMENT TOPOSHEET STM BSN A SqKm
L Km
P Km
Zh Zl LON LAT SF/GF/RF
HEAD Dependable Discharge Power D P
90% 75% 50% 90% 75% 50% 25% 25%
1 BIHAR DHANBAD KATRI 73 I/5 KATRI KATRI 21.80 8.4 20.10 606 220 86 19 00 23 52 00 RF 20 0.04 0.08 0.18 6.62 12.02 26.58 0.482 72.30
2 BIHAR DHANBAD KHUDIA NALA 73 I/1 KHUDIA NALA KHUDIA 19.60 6.4 16.80 506 215 86 14 00 23 50 00 RF 5 0.04 0.07 0.16 1.53 2.78 6.14 0.445 16.69
3 BIHAR GIRIDH ORARI 72 L/3 ORARI PATAIYA 45.80 7.3 26.80 388 320 86 05 00 24 21 00 RF 10 0.08 0.14 0.31 5.77 10.47 23.16 0.840 62.99
4 BIHAR GIRIDH PATHRI 72 L/3 PATHRI PATHRI 49.00 11.0 28.60 371 320 86 13 00 24 17 00 RF 10 0.08 0.15 0.32 6.06 11.01 24.36 0.883 66.25
5 BIHAR GIRIDH TARA 72 L/3 TARA TARA 31.90 9.4 22.80 388 300 86 50 00 24 18 00 RF 10 0.06 0.11 0.24 4.40 7.99 17.67 0.641 48.06
6 BIHAR HAZARIBAGH CHONDHI 73 H/8 CHONDHI CHONDHI 37.70 9.3 25.20 592 480 84 23 00 24 08 00 RF 20 0.07 0.12 0.27 9.97 18.11 40.04 0.726 108.91
7 BIHAR HAZARIBAGH DUMRI 72 H/8 DUMRI BHARATMHUG
22.70 5.1 19.00 606 480 85 19 00 24 08 00 RF 20 0.05 0.08 0.18 6.82 12.39 27.40 0.497 74.52
8 BIHAR HAZARIBAGH KOLAYA 72 H/7 KOLAYA MARGOJA
56.10 6.6 30.40 401 365 85 22 00 24 22 00 RF 5 0.09 0.16 0.36 3.36 6.09 13.48 0.977 36.65
9 BIHAR HAZARIBAGH SADABAH NALA 73 E/1 SADABAH NALA
SADABAH NADI
9.10 4.0 12.20 682 420 85 02 00 23 47 00 RF 20 0.02 0.04 0.09 3.44 6.25 13.83 0.251 37.61
10 BIHAR PALAMU JAMUNA 72 D/8 JAMUNA AMANT 47.30 10.6 32.20 376 240 84 24 00 24 06 00 RF 20 0.08 0.14 0.32 11.81 21.46 47.44 0.860 129.05
11 BIHAR PALAMU JINJOI 72 D/8 JINJOI JINJOI 29.00 6.6 22.30 672 300 84 22 00 24 12 00 RF 20 0.05 0.10 0.22 8.19 14.88 32.91 0.597 89.50
12 BIHAR PALAMU PATHAL GARHA 72 H/3 PATHAL GARHA
GOKHLA 41.50 6.4 25.20 322 160 85 02 00 24 29 00 RF 20 0.07 0.13 0.29 10.71 19.46 43.02 0.780 117.02
13 BIHAR PALAMU SAKHERI 72 D/8 SAKHERI AMANT 50.30 13.0 33.80 395 229 84 15 00 24 06 00 RF 20 0.08 0.15 0.33 12.37 22.47 49.68 0.901 135.12
14 BIHAR RANCHI BHORONGADIH 73 E/12 BHORONGADIH RAISA 23.60 12.1 20.80 440 280 85 39 00 23 10 00 RF 20 0.05 0.09 0.19 7.02 12.76 28.21 0.511 76.72
15 BIHAR RANCHI CHHATA 73 E/4 CHHATA CHHATA 87.90 19.3 49.80 672 540 85 07 30 23 03 00 RF 20 0.13 0.23 0.50 18.78 34.11 75.42 1.368 205.14
16 BIHAR RANCHI KANCHIS 73 E/4,8 KANCHIS KANCHI 401.90 31.50 85.00 693 450 85-27-10 23-09-00 RF 60 0.39 0.71 1.57 175.60
318.93 705.24 4.263 1918.29
17 BIHAR RANCHI KARO 73 F/1 KARO KARO 29.20 12.8 26.60 574 440 85 05 00 23 52 00 RF 20 0.05 0.10 0.22 8.24 14.96 33.08 0.600 89.97
18 BIHAR RANCHI KARO 73 F/1 KARO KARO 10.50 6.7 24.90 521 480 85 03 00 22 54 00 RF 20 0.03 0.05 0.10 3.83 6.96 15.39 0.279 41.86
19 BIHAR RANCHI REGA GARA 73 F/5 REGA GARA RORO RIVER
45.20 18.1 39.70 690 300 85 16 00 22 46 00 RF 20 0.08 0.14 0.31 11.42 20.74 45.86 0.832 124.74
20 BIHAR RANCHI SETHIYA 73 E/12 SETHIYA KANCHI NALA
21.60 11.2 21.40 278 242 85 41 00 23 08 00 RF 5 0.04 0.08 0.18 1.64 2.98 6.60 0.479 17.95
21 BIHAR RANCHI SILPI NADI 73 A/8,B/5 SILPI NADI SANKH R. 65.60 14.10 35.00 959 650 84-22-10 23-00-05 RF 20 0.10 0.18 0.40 15.09 27.40 60.59 1.099 164.81
22 BIHAR RANCHI SUBARNAREKHA 73 E/7 SUBARNAREKHA
SUBARNAAREKHA
18.00 4.4 18.10 652 600 85 24 00 23 21 00 RF 20 0.04 0.07 0.15 5.73 10.42 23.03 0.418 62.65
23 BIHAR RANCHI TAJNA 73 E/8 TAJNA TAJNA 9.10 4.8 12.90 609 580 85 19 00 23 05 00 RF 20 0.02 0.04 0.09 3.44 6.25 13.83 0.251 37.61
24 BIHAR RANCHI TIRU 73 E/2 TIRU TIRU NADI
20.20 11.4 22.90 652 440 85 04 30 23 39 00 RF 60 0.04 0.08 0.17 18.75 34.06 75.32 0.455 204.88
25 BIHAR SINGHBHUM GACHHKARA 73 F/6,7 GACHHKARA SANJAI 107.40 17.3 52.20 639 280 85 27 00 22 34 00 RF 20 0.15 0.26 0.58 21.81 39.62 87.61 1.589 238.30
26 BIHAR SINGHBHUM GARA 73 J/7 GARA SANKH 136.30 15.4 54.90 723 110 86 26 00 22 27 00 RF 10 0.17 0.32 0.70 13.03 23.68 52.35 1.899 142.40
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
2
S.NO. STATE DISTRICT CATCHMENT TOPOSHEET STM BSN A SqKm
L Km
P Km
Zh Zl LON LAT SF/GF/RF
HEAD Dependable Discharge Power D P
90% 75% 50% 90% 75% 50% 25% 25%
27 BIHAR SINGHBHUM GUMMUA GARA 73 F/14,10,11,1
GUMMUA GARA
GUMMUA GARA
378.50 32.6 105.60 656 220 85 47 00 22 32 00 RF 10 0.37 0.68 1.50 27.98 50.82 112.38 4.076 305.69
28 BIHAR SINGHBHUM HIRNI GARA 73 F/5 HIRNI GARA RORO R. 71.90 14.90 42.10 845 459 85-21-30 22-46-30 RF 100 0.11 0.20 0.43 80.79 146.74 324.47 1.177 882.58
29 BIHAR SINGHBHUM JANUMJHOR 73 I/4,E/16 JANUMJHOR SUBRANAAREKHA
26.40 8.7 20.70 247 175 86 00 00 23 41 00 RF 5 0.05 0.09 0.20 1.91 3.47 7.67 0.556 20.86
30 BIHAR SINGHBHUM KANGIRA 73 F/16 KANGIRA KANGIRA 126.30 17.7 52.10 480 390 85 49 00 22 07 00 RF 10 0.16 0.30 0.66 12.31 22.36 49.45 1.793 134.51
31 BIHAR SINGHBHUM KARO 73 F/1 KARO KARO 15.30 8.1 17.60 539 280 85 11 00 22 48 00 RF 20 0.03 0.06 0.14 5.08 9.22 20.40 0.370 55.48
32 BIHAR SINGHBHUM KASSA 73 F/7 KASSA KASSU 24.40 9.5 23.20 764 300 85 24 00 22 19 00 RF 20 0.05 0.09 0.19 7.20 13.08 28.92 0.524 78.66
33 BIHAR SINGHBHUM KOEL 73 F/2 KOEL KOEL 12.50 6.7 15.00 391 240 85 13 00 22 30 00 RF 20 0.03 0.05 0.12 4.37 7.93 17.53 0.318 47.70
34 BIHAR SINGHBHUM RAUTA 73 F/16 RAUTA KONGIRA N
57.20 17.0 34.40 490 390 85 47 00 22 06 00 RF 10 0.09 0.16 0.36 6.81 12.37 27.35 0.992 74.38
35 BIHAR SINGHBHUM RULI N. 73 F/7 RULI N. KARO R. 16.20 6.60 16.40 672 85-21-00 22-25-00 RF 40 0.04 0.06 0.14 10.60 19.25 42.58 0.386 115.81
552 1003 2219 6036
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
1
Assam
S.No. STATE
DISTRICT CATCHMENT TOPOSHEET
STM
BSN
A SqKm
L Km
P Km
Zh m
Zl m
LON LAT FED HEAD m
DEPENDABLE DISCHARGE POWER (kW)
90% 75% 50% 90% 75% 50%
1 ASSAM CHACHAR DALU 83 D/13 ABANG ABANG 19.40 10.50 24.90 500 40 92 48 00 24 57 30 RAIN FED 40 0.545 1.226 2.931 164 368 879
2 ASSAM CHACHAR DIGUN NALA 83 G/4 SELOHI DUNG SELOHI DUNG 18.70 6.01 18.20 1421 252 93 03 00 25 02 00 RAIN FED 240 0.536 1.204 2.879 964 2168 5183
3 ASSAM DARRANG PANBARI 83 B/5 PANBARI PANBARI 23.50 11.50 23.00 180 110 92 27 30 26 48 30 RAIN FED 10 0.598 1.346 3.217 45 101 241
4 ASSAM DIBRUGARH JANGUA N 83 M/11 JANGUA N JANGUA N 16.70 13.90 24.80 200 115 95 33 30 25 17 30 RAIN FED 20 1.580 2.557 4.125 237 384 619
5 ASSAM DIBRUGARH MANMAU JON 83 M/11 MANMAU R. MANMAU R. 23.20 10.40 21.70 186 126 95 44 30 25 21 00 RAIN FED 20 1.726 2.793 4.505 259 419 676
6 ASSAM DIBRUGARH MARGHERITA 83 M/11 GARUMARA JAN
GARUMARA JAN
9.70 8.67 18.50 140 120 RAIN FED 5 1.366 2.211 3.565 51 83 134
7 ASSAM DIBRUGARH NAMDONG 83 M/11 NAMDONG N NAMDONG N 17.90 9.43 20.20 300 120 95 41 15 27 18 00 RAIN FED 10 1.610 2.605 4.202 121 195 315
8 ASSAM GARO HILLS DIRIT CHIRING 78 K/5 DIRIT CHIRING DIRIT CHIRING 8.14 8.48 47.10 421 80 90 26 30 25 49 30 RAIN FED 20 0.357 0.804 1.922 54 121 288
9 ASSAM KAMRUP KHETRI 83 B/4 KHETRI KHETRI 33.00 11.80 28.50 491 40 92 05 30 26 17 50 RAIN FED 20 0.706 1.587 3.794 106 238 569
10 ASSAM KARBI ANGLONG
BAGIJAN 83 F/15 BAGIJAN BAGIJAN 19.24 9.40 21.70 787 105 93 45 20 26 23 30 RAIN FED 5 0.543 1.221 2.919 20 46 109
11 ASSAM KARBI ANGLONG
BOEDIKHARU 83 F/3 BORDIKHARU BORDIKHARU 24.60 11.60 23.40 400 100 93 04 00 26 15 00 RAIN FED 5 0.612 1.376 3.290 23 52 123
12 ASSAM KARBI ANGLONG
CHELABOR NALA
83F/4,E/8 CHELABOUR CHELABOUR 30.00 12.70 30.90 838 100 93 12 30 26 12 30 RAIN FED 20 0.674 1.515 3.623 101 227 543
13 ASSAM KARBI ANGLONG
DANGLANGSO 83 B/8 DANGLANGSO N
DANGLANGSO N
32.20 9.20 31.50 548 155 92 29 50 26 30 00 RAIN FED 20 0.697 1.568 3.749 105 235 562
14 ASSAM KARBI ANGLONG
DINAR N 83 C/10 DINAR N DINAR N 42.30 13.70 31.90 840 560 92 41 15 25 37 30 RAIN FED 40 0.796 1.790 4.281 239 537 1284
15 ASSAM KARBI ANGLONG
DIPHU 83 G/5 DIPHU DIPHU 48.50 13.70 31.40 260 170 93 26 00 25 49 00 RAIN FED 4 0.851 1.913 4.575 26 57 137
16 ASSAM KARBI ANGLONG
DIPHU-II 83 G/5 DIPHU NALA DIPHU NALA 13.70 9.30 22.20 220 136 93 27 40 26 54 30 RAIN FED 20 0.460 1.035 2.475 69 155 371
17 ASSAM KARBI ANGLONG
DIPHU-III 83 G/5 DIKRENG JEM DIKRENG JEM 21.50 8.60 22.00 219 140 93 27 00 25 54 00 RAIN FED 20 0.573 1.289 3.081 86 193 462
18 ASSAM KARBI ANGLONG
DIRIT CHIRING 78 K/5 DIRIT CHIRING DIRIT CHIRING 8.14 8.48 47.10 421 80 93 41 00 26 17 00 RAIN FED 20 0.357 0.804 1.922 54 121 288
19 ASSAM KARBI ANGLONG
HORU HORGATI 83 F/3 HORU HORGATI
HORU HORGATI
37.10 14.80 34.70 692 100 93 11 00 26 18 00 RAIN FED 20 0.747 1.680 4.017 112 252 602
20 ASSAM KARBI ANGLONG
HORU NALA 83 F/4 HORU HORU 21.70 10.90 28.80 521 100 93 10 00 26 07 30 RAIN FED 20 0.576 1.294 3.095 86 194 464
21 ASSAM KARBI ANGLONG
JAMUNA 83 G/5 THEDONGJAM THEDONGJAM 8.00 6.70 15.30 240 120 93 19 00 25 59 00 RAIN FED 20 0.354 0.797 1.906 53 120 286
22 ASSAM KARBI ANGLONG
KAZI RANGA 83 F/6 KOHORA N KOHORA N 28.20 8.95 27.60 610 60 93 24 00 26 36 00 RAIN FED 60 0.654 1.470 3.515 294 662 1582
23 ASSAM KARBI ANGLONG
KAZI RANGA 83 F/6 BARDIPHLU NADI
BARDIPHLU NADI
39.40 18.80 43.70 626 94 93 29 30 26 32 30 RAIN FED 20 0.769 1.730 4.136 115 259 620
24 ASSAM KARBI KULITERANGGH 83 F/3 KULITERANGH
KULITERGHAN
13.20 7.90 15.50 408 100 93 02 30 26 15 15 RAIN FED 20 0.452 1.017 2.431 68 153 365
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
2
S.No. STATE
DISTRICT CATCHMENT TOPOSHEET
STM
BSN
A SqKm
L Km
P Km
Zh m
Zl m
LON LAT FED HEAD m
DEPENDABLE DISCHARGE POWER (kW)
90% 75% 50% 90% 75% 50%
ANGLONG ANG ANG G
25 ASSAM KARBI ANGLONG
LANGCHAILIT N 83 G/5 LANGCHAILIT N LANGCHAILIT N
19.30 8.80 21.40 240 158 93 19 00 25 46 00 RAIN FED 15 0.544 1.223 2.924 61 138 329
26 ASSAM KARBI ANGLONG
LANGSOMEPI 83 F/15 LANGSOMEPI LANGSOMEPI 12.17 8.80 17.41 300 110 93 51 00 26 21 15 RAIN FED 10 0.435 0.977 2.337 33 73 175
27 ASSAM KARBI ANGLONG
LANKHIPAM 83 G/1 LANKHIPAM N LANKHIPAM N 24.70 7.90 24.90 360 160 92 12 00 25 52 00 RAIN FED 40 0.613 1.379 3.296 184 414 989
28 ASSAM KARBI ANGLONG
MORJENG NALA 83 C/10 MORJENG NALA MORJENG NALA
18.80 8.60 20.60 908 680 92 26 30 25 35 30 RAIN FED 20 0.537 1.207 2.887 81 181 433
29 ASSAM KARBI ANGLONG
PAK LANGSO 83 F/7 PAK LANGSO PAK LANGSO 29.90 7.70 24.10 735 290 93 18 30 26 20 50 RAIN FED 6 0.673 1.513 3.617 30 68 163
30 ASSAM KARBI ANGLONG
PATRADISA 83 F/8 PATRADISA PATRADISA 18.80 9.60 19.20 786 500 93 20 00 26 12 00 RAIN FED 20 0.537 1.207 2.887 81 181 433
31 ASSAM KARBI ANGLONG
THE DONG 83 G/1 THE DONG N THE DONG N 13.90 7.90 20.40 332 115 93 06 30 25 53 00 RAIN FED 20 0.464 1.043 2.493 70 156 374
32 ASSAM KARBI ANGLONG
UM JARING 83 C/10 UM JARING UM JARING 23.00 9.40 23.10 686 152 92 43 50 25 43 30 RAIN FED 100 0.592 1.332 3.184 444 999 2388
33 ASSAM KARBI ANGLONG
UM JU 83 C/10 UM JU UM JU 17.90 9.80 23.10 878 360 92 39 30 25 42 30 RAIN FED 20 0.524 1.179 2.819 79 177 423
34 ASSAM KARBI ANGLONG
UM-KARANG 83 C/5 UM-KARANG UM-KARANG 20.20 11.70 22.50 705 220 92 28 30 25 58 30 RAIN FED 100 0.556 1.250 2.989 417 938 2242
35 ASSAM KARBI ANGLONG
UM-KHARI 83 C/10 UM-KHARI UM-KHARI 43.00 16.20 38.00 911 520 92 37 00 25 41 30 RAIN FED 60 0.803 1.805 4.315 361 812 1942
36 ASSAM KARBI ANGLONG
UM-PANI 83 C/5 UM-PANI UM-PANI 65.10 17.90 39.60 800 48 92 21 15 25 54 50 RAIN FED 8 0.982 2.208 5.279 59 132 317
37 ASSAM KARBI ANGLONG
UM-SAREH 83 C/5 UM-SAREH UM-SAREH 26.20 14.40 28.90 982 620 92 20 00 25 46 00 RAIN FED 20 0.631 1.419 3.392 95 213 509
38 ASSAM KARBI ANGLONG
UM-SER 83 C/5 UM-SER UM-SER 24.80 11.00 29.70 660 473 92 24 00 25 51 00 RAIN FED 20 0.614 1.381 3.303 92 207 495
39 ASSAM KARBIANGLONG
LANGKIDANG 83C/13,C/14 LANGKIDANG LANGKIDANG 17.40 10.50 24.70 300 120 92 47 00 25 45 30 RAIN FED 20 0.517 1.163 2.780 78 174 417
40 ASSAM MIKIR HILLS LANGHIT ST-I 83 F/8 LANGHIT ST-I LANGHIT ST-I 14.70 9.10 21.20 480 140 93 23 30 26 01 30 RAIN FED 40 0.476 1.071 2.562 143 321 768
41 ASSAM NOWGAON HANSA PANI 83 F/3 HANSA PANI HANSA PANI 33.40 13.30 26.50 635 100 93 02 30 26 27 00 RAIN FED 5 0.710 1.596 3.817 27 60 143
42 ASSAM NOWGOAN BARJURI 83 F/6 BARJURI BARJURI 6.90 5.20 11.90 296 60 93 17 00 25 31 30 RAIN FED 20 0.330 0.742 1.774 49 111 266
43 ASSAM NOWGOAN KAIPANI NALA 83 F/2,3 KAIPANI NALA KAIPANI NALA 68.10 17.20 39.90 797 64 RAIN FED 5 1.003 2.256 5.395 38 85 202
44 ASSAM NOWGOAN UPPER BAR JURI 78B/15,F/3 UPPERBAR JURI UPPERBAR JURI
28.70 17.20 36.30 635 66 93 01 30 26 25 00 RAIN FED 100 0.659 1.483 3.546 495 1112 2659
45 ASSAM NOWGONG CHAPA NALA 83 B/15 CHAPA CHAPA 57.80 44.80 46.40 500 60 92 50 30 26 21 00 RAIN FED 20 0.927 2.084 4.982 139 313 747
46 ASSAM NOWGONG KAIPANI NALA 83F/4,F/3 KAIPANI KAIPANI 68.10 17.20 39.90 797 64 93 13 00 26 33 00 RAIN FED 5 1.003 2.256 5.395 38 85 202
47 ASSAM N.C. HILLS CHIKHU NALA 83 G/4 CHIKHU NALA CHIKHU NALA 62.10 19.30 38.40 1861 218 93 13 30 25 05 00 RAIN FED 80 0.959 2.158 5.159 576 1295 3095
48 ASSAM N.C. HILLS DERE NALA 83 C/15 DERE NALA DERE NALA 63.40 19.60 44.70 1020 190 92 55 30 25 22 20 RAIN FED 20 0.969 2.179 5.211 145 327 782
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
3
S.No. STATE
DISTRICT CATCHMENT TOPOSHEET
STM
BSN
A SqKm
L Km
P Km
Zh m
Zl m
LON LAT FED HEAD m
DEPENDABLE DISCHARGE POWER (kW)
90% 75% 50% 90% 75% 50%
49 ASSAM N.C. HILLS DI JUNG 83 G/4 DI JUNG DI JUNG 13.00 6.40 15.20 1220 135 93 12 45 25 01 40 RAIN FED 40 0.449 1.009 2.413 135 303 724
50 ASSAM N.C. HILLS DIKRAMBI 83 C/14 DIKRABI DIKRABI 10.34 6.27 14.30 400 92 57 30 25 33 00 RAIN FED 20 0.402 0.903 2.159 60 135 324
51 ASSAM N.C. HILLS DIYUNG R. 83 G/4 DIYUNG R. DIYUNG R. 19.30 10.70 24.00 1521 433 93 04 30 25 10 40 RAIN FED 20 0.544 1.223 2.924 82 183 439
52 ASSAM N.C. HILLS DOLONG NALA 83 C/15 DOLONG NALA DOLONG NALA 33.00 11.40 26.90 851 220 92 57 30 25 19 30 RAIN FED 40 0.706 1.587 3.794 212 476 1138
53 ASSAM N.C. HILLS DOLONG NALA 83 G/4 DOLONG NALA DOLONG NALA 21.80 7.60 21.70 1748 360 93 02 30 25 09 30 RAIN FED 40 0.577 1.297 3.102 173 389 931
54 ASSAM N.C. HILLS HARANGTHAL NALA
83 C/15 HARANGTHAL NALA
HARANGTHAL NALA
30.00 16.50 25.30 740 200 92 57 30 25 24 00 RAIN FED 40 0.674 1.515 3.623 202 455 1087
55 ASSAM N.C. HILLS INDUKI NALA 83 G/4 INDUKI NALA INDUKI NALA 27.90 10.70 25.50 1680 340 93 10 30 25 14 30 RAIN FED 40 0.650 1.463 3.497 195 439 1049
56 ASSAM N.C. HILLS LAISONG 83 G/8 JENUM R. JENUM R. 44.50 12.00 31.00 1585 775 93 18 30 25 12 30 RAIN FED 20 0.816 1.835 4.388 122 275 658
57 ASSAM N.C. HILLS LANGKU 83 C/14 LANGKU LANGKU 34.29 114.30 27.50 394 180 92 47 30 25 39 50 RAIN FED 20 0.719 1.617 3.866 108 243 580
58 ASSAM N.C. HILLS LANGKU NALA 83 C/14 LANGKU LANGKU 25.19 9.20 23.80 283 101 92 57 30 25 36 40 RAIN FED 10 0.619 1.392 3.328 46 104 250
59 ASSAM N.C. HILLS LANGPHER 83 C/14 LANGPHER LANGPHER 21.20 13.40 23.50 233 100 92 52 30 25 44 00 RAIN FED 20 0.569 1.280 3.060 85 192 459
60 ASSAM N.C. HILLS LANGTING-II 83 G/3 LAHUNG DISA LAHUNG DISA 29.70 7.80 23.80 815 180 92 13 20 25 28 30 RAIN FED 20 0.670 1.508 3.605 101 226 541
61 ASSAM N.C. HILLS LUNGHIT-ST-II 83 F/8 LUNGHIT-ST-II LUNGHIT-ST-II 22.70 14.20 25.40 991 120 93 23 30 26 30 00 RAIN FED 20 0.588 1.323 3.164 88 198 475
62 ASSAM N.C. HILLS MAHU 83 G/4 BARA SARANG N
BARA SARANG N
16.80 7.11 17.40 1521 440 93 04 30 25 11 00 RAIN FED 40 0.508 1.143 2.733 153 343 820
63 ASSAM N.C. HILLS MAHU 83 G/4 MAHU R. MAHU R. 17.30 8.50 18.90 1400 400 93 09 30 25 13 30 RAIN FED 40 0.516 1.159 2.773 155 348 832
64 ASSAM N.C. HILLS MAIBONG 83 G/3 SINGPLONG DISA
SINGPLONG DISA
16.80 11.20 20.60 440 260 93 08 00 25 19 30 RAIN FED 20 0.508 1.143 2.733 76 171 410
65 ASSAM N.C. HILLS PAISA NALA 83 G/4 PAISA NALA PAISA NALA 21.70 8.90 21.20 1432 164 93 06 00 25 02 30 RAIN FED 120 0.576 1.294 3.095 518 1165 2786
66 ASSAM N.C. HILLS RIAM BATARAI NALA
83 G/4 RIAM BATARAI NALA
RIAM BATARAI NALA
21.00 8.00 21.10 941 239 93 04 00 25 15 00 RAIN FED 60 0.567 1.274 3.046 255 573 1371
67 ASSAM N.C. HILLS SUBOJAI NALA 83 G/4 SUBOJAI NALA SUBOJAI NALA 14.70 8.10 19.70 1277 380 93 10 00 25 13 45 RAIN FED 20 0.476 1.071 2.562 71 161 384
68 ASSAM N.C. HILLS THAR NALA 83 C/15 THAR NALA THAR NALA 40.90 11.10 29.20 1021 321 92 53 30 25 18 30 RAIN FED 100 0.783 1.761 4.212 587 1321 3159
69 ASSAM SIBSAGAR PUNGJAN 83 F/15 PUNGJAN PUNGJAN 18.12 6.76 19.90 153 116 93 52 30 26 23 00 RAIN FED 2 0.527 1.186 2.836 8 18 43
70 ASSAM SONITPUR BORDI KORAI-II 83 F/2 BORDI KORAI-II BORDI KORAI-II
14.30 5.40 15.50 70 68 93 00 30 26 42 00 RAIN FED 2 0.470 1.057 2.527 7 16 38
71 ASSAM SONITPUR BORDIKORAI 83 F/2 BORDIKORIA-III BORDIKORAI-III
27.70 7.70 21.40 600 90 93 04 30 26 36 00 RAIN FED 18 0.648 1.457 3.485 88 197 470
72 ASSAM SONITPUR BORDIKRAI NALA
83 B/14 DIKRAI DIKRAI 32.20 14.30 24.40 72 67 92 57 30 26 41 30 RAIN FED 2 0.697 1.568 3.749 10 24 56
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
1
Manipur
S.NO. STATE DISTRICT RTS STM BSN A SqKm
L Km
P Km
Zh m
Zl m
LON LAT SF/GF/RF
Head (m)
Dependable Discharge Power
90% 75% 50% 90% 75% 50%
1 Manipur CHANDEL 83 L/3 CHAKPI TUREL CHAKPI R. 152.2 21.0 57.5 1603 780 94-02-15 24-19-10 RF 20 0.60 1.55 3.89 91 233 584
2 Manipur CHANDEL 83 L DUTA LOK YU RIVER 167.5 24.5 61.0 1789 250 94-16-00 24-15-30 RF 100 0.68 1.75 4.38 510 1309 3282
3 Manipur CHANDEL 83 L/2,L/6 KURUNG MACHA YONGDONG/KHOLBO R. 28.2 9.0 22.5 1787 510 94-15-00 24-35-50 RF 60 0.08 0.20 0.49 35 89 223
4 Manipur CHANDEL 83 L/6 MONTHOU LOK MAKLANG KHONG 20.5 9.0 21.5 998 232 94-27-15 24-37-40 RF 60 0.05 0.13 0.34 23 60 151
5 Manipur CHANDEL 83 L/3,L/7 NAMJET LOK NANSITLAW CHUNG 105.9 21.0 49.5 1292 215 94-19-50 24-19-50 RF 20 0.39 1.00 2.50 58 149 375
6 Manipur CHANDEL 83 L/2,L/3 ONGAI LOK HEROK-TUREL 58.6 10.0 30.0 1630 840 94-07-15 24-32-30 RF 20 0.19 0.48 1.21 28 72 182
7 Manipur CHANDEL 83 L/3 SEKMAL/SENGMAL SEKMAL/SEMGAL TURU 94.6 13.5 45.0 1679 820 94-05-30 24-27-30 RF 20 0.34 0.87 2.18 51 130 326
8 Manipur CHANDEL 83 L/3 SEKMEL/SENGMEL TUR BARAK/SANGU LOK 112.5 16.5 46.0 1679 840 94-04-45 24-27-45 RF 20 0.42 1.07 2.69 63 161 403
9 Manipur CHANDEL 83 L TIDEM LOK TIDEM LOK 111.9 20.0 42.0 1763 300 94-09-00 24-02-00 RF 100 0.42 1.07 2.67 311 799 2004
10 Manipur CHANDEL 83 L/3 TISA LOK SEKMAL/SENGHMAL R. 31 10.5 25.0 1582 797 94-02-15 24-27-10 RF 20 0.09 0.22 0.56 13 33 83
11 Manipur CHANDEL 83 H/16,84 E/13 TUINGAN/PAMTUIYANG CHAKPI R. 203.7 41.5 74.5 2387 700 93-54-00 24-12-15 RF 20 0.86 2.22 5.56 130 333 834
12 Manipur CHURACHANDPUR
83 H/3 DOL LUI BARAK/TUIRUONG R. 27.9 14.0 27.0 1156 120 93-13-30 24-22-02 RF 40 0.08 0.19 0.49 23 58 147
13 Manipur CHURACHANDPUR
83 H/12,H/16 HIPI/KHONGKHAIDUNG MANIPUR R. 66.2 18.0 34.0 1800 726 93-46-45 24-08-42 RF 20 0.22 0.56 1.41 33 84 211
14 Manipur CHURACHANDPUR
83 H/11,12, E/9 KHUGA R KHUGA R 356 59.0 112.0 2018 820 93-41-05 24-17-45 RF 20 1.71 4.39 11.01 256 659 1651
15 Manipur CHURACHANDPUR
83 H/10 KONGLANGLOK LUI LEIMATAK/APEN/PEN 42.5 10.0 29.0 1854 320 93-38-00 24-38-45 RF 80 0.13 0.33 0.82 76 196 490
16 Manipur CHURACHANDPUR
83 L/3,L/7 KUMUNG LOK TARET R. 29.8 11.5 23.0 1425 540 94-16-15 24-29-30 RF 40 0.08 0.21 0.53 25 63 159
17 Manipur CHURACHANDPUR
83 G/16 LANGKA N. IRANG/TUILANG R. 161.6 19.0 52.5 2382 620 93-46-15 25-09-00 RF 20 0.65 1.67 4.19 98 251 628
18 Manipur CHURACHANDPUR
83 H/7 MONGKAI LUI TUIPUI R. 73.7 18.5 36.0 1557 140 93-23-45 24-30-00 RF 40 0.25 0.64 1.60 75 192 481
19 Manipur CHURACHANDPUR
83 H/6,7,10,11 PANLONG LUI TUIPI LUI 86.4 15.5 43.0 1388 119 93-24-50 24-31-00 RF 20 0.30 0.78 1.95 45 116 292
20 Manipur CHURACHANDPUR
83 H/10,H/11 TALAI LUI LEIMATAK R. 80.7 18.0 39.5 2109 585 93-36-45 24-30-20 RF 20 0.28 0.71 1.79 42 107 269
21 Manipur CHURACHANDPUR
83 H/7 THAMPI LUI THAMPI LUI 16.95 8.0 19.5 1651 650 93-29-50 24-20-15 RF 40 0.04 0.11 0.27 12 32 80
22 Manipur CHURACHANDPUR
83 H/11 TUILA R. THILA R. 98 21.0 46.0 1770 660 93-34-50 24-16-45 RF 0.35 0.91 2.27 0 0 0
23 Manipur CHURACHANDPUR
83 H/7,H/11 TUILI LUI LUILI LUI 131.6 18.5 50.0 2018 540 93-28-00 24-16-00 RF 0.51 1.30 3.26 0 0 0
24 Manipur CHURACHANDPUR
83 H/6,7,10,11 TUIPI LUI IRANG TUILAHG R. 502.4 52.5 116.5 1841 90 93-23-15 24-34-00 RF 80 2.61 6.69 16.78 1564 4015 10067
25 Manipur CHURACH 83 H/8 TUIZIN LUI TUIVAI R. 25.8 7.5 21.0 1550 453 93-19-50 24-07-45 RF 40 0.07 0.18 0.44 21 53 133
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
2
S.NO. STATE DISTRICT RTS STM BSN A SqKm
L Km
P Km
Zh m
Zl m
LON LAT SF/GF/RF
Head (m)
Dependable Discharge Power
90% 75% 50% 90% 75% 50%
ANDPUR
26 Manipur IMPHAL 83 G/16, H/13 LIMAKANG LIMAKANG R. 28 10.0 23.0 2541 880 93-50-20 24-57-00 RF 100 0.08 0.20 0.49 57 147 368
27 Manipur LAMENGLONG
83 G/15,G/16 IRANG R. IRANG/TUILONG 165.9 16.0 56.0 2669 790 93-51-45 25-13-30 RF 20 0.67 1.73 4.33 101 259 649
28 Manipur SENAPATI 83 K/3,K/7 BARAR R. BARAK/SANGU LOK 129.8 19.1 48.5 2473 1125 94-10-30 25-25-00 RF 20 0.50 1.28 3.20 75 192 481
29 Manipur SENAPATI 83 G/15,G/16 IRANG R. IRANG R. 96.4 16.0 40.5 2654 790 93-51-30 25-13-50 RF 20 0.35 0.89 2.23 52 133 334
30 Manipur SENAPATI 83 G/14,15,K/2,3 KARUIROL KI BARAK/TUILANG R. 69.3 13.5 37.0 2850 660 93-58-00 25-25-15 RF 80 0.23 0.59 1.49 139 356 892
31 Manipur SENAPATI 83 K/3 KHARRO LOK BARAK R./SAGU LOK 70.9 15.0 35.5 2204 1020 94-05-20 25-20-10 RF 20 0.24 0.61 1.53 36 91 229
32 Manipur SENAPATI 83 K/3 KHULAO BARAK R. 54.5 12.3 32.0 2288 1094 94-08-45 25-23-20 RF 20 0.17 0.44 1.11 26 66 166
33 Manipur SENAPATI 83 K/2,K/3 KOZERI LOK BARAK R. 52.2 15.0 35.0 2994 920 94-02-15 25-25-05 RF 100 0.16 0.42 1.05 122 314 788
34 Manipur SENAPATI 83 G/15 MAJAP KI BARAK R. 80.7 18.0 43.5 2832 758 93-57-45 25-25-30 RF 20 0.28 0.71 1.79 42 107 269
35 Manipur SENAPATI 83 G/15,K/3 MAJATKI LOK BARAK R. 82.5 30.5 46.0 2186 850 94-01-30 25-25-25 RF 20 0.29 0.73 1.84 43 110 276
36 Manipur SENAPATI 83 G/15 NEGHA KI BARAK/TUILONG R. 145.9 21.0 49.5 2832 437 93-49-30 25-27-32 RF 140 0.57 1.47 3.70 603 1548 3881
37 Manipur SENAPATI 83 G/15,16,K/3,4 NUKHI LOK BARAK/SANGU LOK 92.4 19.5 50.0 2100 960 94-02-30 25-18-00 RF 20 0.33 0.84 2.11 49 126 317
38 Manipur SENAPATI 83 K/2,K/3 RIKA KARI BARAK/SANGU LOK 65.4 17.5 37.0 2686 1080 94-08-15 25-24-20 RF 20 0.22 0.55 1.38 32 83 208
39 Manipur SENAPATI 83 K/7 SHOTOREI KHERI LAINI LOK 53.1 12.5 32.0 2600 796 94-24-00 25-26-30 RF 20 0.17 0.43 1.07 25 64 161
40 Manipur SENAPATI 83 G/16 TI KI IMPHAL TUREL 33 10.5 25.0 2310 1050 93-58-30 25-09-00 RF 20 0.09 0.24 0.60 14 36 90
41 Manipur TAMENGLONG
83 G/12 BUNING N. BARAK/TUILONG R. 73.4 22.5 45.5 1791 280 93-37-15 25-12-30 RF 40 0.25 0.64 1.59 74 191 478
42 Manipur TAMENGLONG
83 G/12 BUNNING BUNNING 19.6 6.5 18.0 1872 1300 93-38-00 25-07-15 RF 40 0.05 0.13 0.32 15 38 95
43 Manipur TAMENGLONG
83 H/9 DUIGA THOK IRANG/TUILANG R. 34.9 9.0 25.0 1615 238 93-33-00 24-55-00 RF 20 0.10 0.26 0.64 15 38 96
44 Manipur TAMENGLONG
83 H/5 DUIJA THOK BARAK/AHU R. 54 10.5 31.5 1658 132 93-24-30 24-54-00 RF 20 0.17 0.44 1.10 26 66 164
45 Manipur TAMENGLONG
83 H/6,H/10 DUIRIN LUI IRANG/TUILANG R. 149.9 21.0 53.0 1854 150 93-26-15 24-39-45 RF 40 0.59 1.52 3.82 178 457 1146
46 Manipur TAMENGLONG
83 H/6 GAITHI LUI BARAK/TUIPUONG R. 36.2 13.0 27.5 1499 110 93-20-10 24-43-15 RF 60 0.10 0.27 0.67 47 121 302
47 Manipur TAMENGLONG
83 H/9,H/13 IJAI R. TUPAI R. 185.1 35.0 75.0 2346 396 93-40-00 24-47-50 RF 40 0.77 1.97 4.95 230 592 1484
48 Manipur TAMENGLONG
83 H/9,H/13 IJAI R. IJAI R. 97.9 23.0 45.0 2331 621 93-44-10 24-51-15 RF 40 0.35 0.90 2.27 106 271 681
49 Manipur TAMENGLONG
83 G/11,G/15 INHU KI BARAK/TUILONG R. 114.3 23.0 56.5 2451 400 93-45-30 25-25-00 RF 40 0.43 1.09 2.74 128 328 823
50 Manipur TAMENGLONG
83 G/15,16 IRANG IRANG 22.8 9.0 21.0 2156 720 93-49-15 25-12-30 RF 140 0.06 0.15 0.38 62 160 401
51 Manipur TAMENGL 83 G/16,H/13 LIMAKANG R. LIMAKANG R. 15.4 6.5 15.5 2541 1220 93-49-40 24-57-45 RF 80 0.04 0.09 0.24 22 56 142
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
3
S.NO. STATE DISTRICT RTS STM BSN A SqKm
L Km
P Km
Zh m
Zl m
LON LAT SF/GF/RF
Head (m)
Dependable Discharge Power
90% 75% 50% 90% 75% 50%
ONG
52 Manipur TAMENGLONG
83 G/12,H/9 LRING/ALENG R. LJAI R. 113.2 23.5 52.0 1679 300 93-37-45 24-51-45 RF 20 0.42 1.08 2.71 63 162 406
53 Manipur TAMENGLONG
83 G/7,G/8 MAKRU R. MAKRU R. 223.8 42.5 85.5 2080 120 93-21-40 25-01-00 RF 20 0.97 2.49 6.24 145 373 936
54 Manipur TAMENGLONG
83 H/5 MARUI THOK BARAK/AHU R. 66.8 13.0 36.0 1433 110 93-23-45 25-52-45 RF 20 0.22 0.57 1.42 33 85 213
55 Manipur TAMENGLONG
83 G/15 NAM KI BARAK 48.1 17.5 33.0 2832 682 93-50-05 25-25-40 RF 180 0.15 0.38 0.95 199 512 1284
56 Manipur TAMENGLONG
83 G/15,G/16 THANGNAL VADUNG IRANG/TUILONG R. 20.2 7.0 19.5 2190 720 93-49-00 25-12-40 RF 240 0.05 0.13 0.33 92 236 592
57 Manipur TAMENGLONG
83 G/8,12, H/9 TUIPA KI BARAK 156.9 24.5 54.0 1838 182 93-28-50 25-04-10 RF 80 0.63 1.61 4.04 377 967 2424
58 Manipur TAMENGLONG
83 H/9,H/10 TUPUI R. IJAY R. 101.2 20.0 45.0 2014 396 93-39-55 24-47-10 RF 60 0.37 0.94 2.36 165 424 1063
59 Manipur TEMANGLONG
83 G/12,16,H/9,13
ARIU KI IRANG/TUILANG R. 98.5 19.5 52.0 2346 356 93-39-30 25-04-30 RF 60 0.36 0.91 2.29 160 410 1029
60 Manipur UKHRUL 83 L/5,L/6 AWA KHONG TUYUNGBI R. 40.5 11.0 26.0 1787 440 94-18-50 24-44-50 RF 40 0.12 0.31 0.77 36 92 231
61 Manipur UKHRUL 83 K CHAMMU TUREL TIZU R. 47.5 15.5 31.0 2183 1000 94-31-30 25-14-15 RF 100 0.15 0.37 0.94 109 280 702
62 Manipur UKHRUL 83 K CHAMMU TUREL TIZU R. 555.6 50.0 115.0 2723 400 94-33-00 25-30-00 RF 200 2.95 7.57 18.98 4421 11353 28466
63 Manipur UKHRUL 83 L/5,L/6 CHENGLU KHONG MALANG KHONG 46.7 13.5 27.5 1772 378 94-27-00 24-45-40 RF 40 0.14 0.37 0.92 43 110 275
64 Manipur UKHRUL 83 L/5,L/9 CHONGKHAL LOK NAM PANGA 96.4 20.5 41.0 2119 378 94-36-00 24-53-20 RF 60 0.35 0.89 2.23 156 400 1002
65 Manipur UKHRUL 83 L/5,L/9 KHURUNG KHONG MAKLANG KHONG 62 13.5 38.0 2261 435 94-26-00 24-49-10 RF 40 0.20 0.52 1.30 60 155 389
66 Manipur UKHRUL 83 K/8 LUNGSHANG/NUNGSHAN THOUBAL R. 150.4 32.5 60.0 2568 1040 94-16-50 25-05-00 RF 20 0.60 1.53 3.84 89 230 575
67 Manipur UKHRUL 83 K MAMORI N. TIZU R. 53.8 15.0 33.5 2514 1450 95-32-00 25-28-30 RF 100 0.17 0.44 1.09 127 326 818
68 Manipur UKHRUL 83 L/1 MARANGKO N. THOUBAL TUREL 22.6 7.5 21.0 2023 855 94-09-55 24-54-50 RF 40 0.06 0.15 0.38 18 45 113
69 Manipur UKHRUL 83 K,L NAM PANGA CHINDWIN R. 431.3 40.0 100.0 2680 400 94-38-00 24-50-00 RF 100 2.16 5.55 13.92 1622 4164 10441
70 Manipur UKHRUL 83 K/8,L/5 SANA LOK YU RIVER 125.9 15.0 46.5 2119 635 94-23-15 24-55-42 RF 100 0.48 1.23 3.09 360 923 2315
71 Manipur UKHRUL 83 K/ SANA LOK NAM PANGA 395 40.0 88.0 2836 182 94-39-50 25-52-20 RF 100 1.94 4.99 12.50 1456 3740 9376
72 Manipur UKHRUL 83 L/5 SHULU KHONG YU RIVER 37.1 10.5 23.5 1787 540 94-23-15 24-52-30 RF 60 0.11 0.28 0.69 48 124 311
73 Manipur UKHRUL 83 L/1 TINU KHONG THOUBAL TUREL 37 11.5 31.0 1900 904 94-08-15 24-47-50 RF 20 0.11 0.28 0.69 16 41 103
74 Manipur UKHRUL 83 K,L TISAN DUNG SANA LOK 95.6 15.0 40.0 2680 858 94-39-00 24-59-00 RF 200 0.34 0.88 2.20 513 1318 3306
75 Manipur UKHRUL 83 L/1,L/5 TLTANG KHONG TUYUNGBI TUREL 43.1 11.0 27.5 1842 505 94-16-30 24-47-20 RF 60 0.13 0.33 0.83 58 149 374
76 Manipur UKHRUL 83 K/9,K/10 TUZU RU TIZU R. 119.4 24.5 46.0 2450 660 94-32-15 25-41-00 RF 60 0.45 1.15 2.89 202 519 1302
77 Manipur UKHRUL 83 K/8 YANGUI KHONG THOUBAL R. 50.7 10.5 28.0 2568 1410
94-23-50 25-03-30 RF 100 0.16 0.40 1.01 118 303 761
78 Manipur UKRUL 83 K/3,K/7 IRIL R. IRIL R. 122.9 18.0 52.5 2473 950 94-13-30 25-16-20 RF 20 0.47 1.20 3.00 70 179 449
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
4
S.NO. STATE DISTRICT RTS STM BSN A SqKm
L Km
P Km
Zh m
Zl m
LON LAT SF/GF/RF
Head (m)
Dependable Discharge Power
90% 75% 50% 90% 75% 50%
79 Manipur UKRUL 83 L/2 ITOK TUREL THOUBAL R. 84 15.5 42.0 1875 788 94-06-30 24-41-45 RF 20 0.29 0.75 1.88 44 113 282
80 Manipur UKRUL 83 L/1 KHAMAN LOK IRIL TUREL 60.2 16.5 34.0 1521 788 94-03-00 24-54-00 RF 20 0.19 0.50 1.25 29 75 188
81 Manipur UKRUL 83 K SIRKHI CHIRUL TIZU R. 54.4 8.0 27.0 2515 1000 94-33-00 25-23-00 RF 200 0.17 0.44 1.11 258 661 1658
16987
43618 109362
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
1
Meghalaya
S.NO. STATE DISTRICT CATCHMENT RTS STM BSN A Sq Km
L Km
P Km
Zh m
Zl m
LON LAT FED HEAD Dependable Discharge Power
90% 75% 50% 90% 75% 50%
1 Meghalaya E.GARO H. RONGRI CHIBIMA 78 K/7 RONGRI CHIBIMA
RONGRI CHIBIMA
19.5 9.5 18.1 1071 90-29-58 25-30-00 RF 120 0.26 0.59 1.42 237 534 1276
2 Meghalaya E.KHASI H. KHRI 78 O/10,14 KHRI KHRI 111.1 28.8 55.3 1826 1007 91-44-45 25-40-00 RF 120 0.61 1.38 3.30 553 1243 2972
3 Meghalaya E.KHASI H. KYNSHI 78 O/7,10,11 KYNSHI KYNSHI 194 40.9 101.3 1986 91-27-00 25-27-00 RF 60 0.81 1.81 4.33 362 815 1948
4 Meghalaya E.KHASI H. MAWSIANGKABTHUH 78 O/11 MAWSIANGKABTHUH
UMIEW/UMIAN/BAGRA R.
15.2 9.0 19.0 1640 380 91-38-30 25-17-15 RF 200 0.23 0.53 1.26 350 788 1884
5 Meghalaya E.KHASI H. PHUD MAWTALA 78 O/7 PHUD MAWTALA
UM RILANG 35.7 11.1 29.3 1524 228 91-17-30 25-17-15 RF 140 0.35 0.80 1.90 371 835 1997
6 Meghalaya E.KHASI H. UM KENREM I 78 O/6 UM KENREM UM KENREM 60.1 12.7 33.8 1291 560 91-24-15 25-44-45 RF 160 0.46 1.02 2.45 547 1229 2940
7 Meghalaya E.KHASI H. UM KENREM I 78 O/6 UM KENREM UM KENREM 64.9 14.8 34.6 1291 500 91-24-00 25-44-35 RF 80 0.47 1.06 2.54 284 638 1526
8 Meghalaya E.KHASI H. UM MYNRAT 78 O/11 UM MYNRAT NONGSPUNG 24.1 10.2 22.2 1772 1400 91-34-30 25-25-30 RF 60 0.29 0.66 1.57 132 296 707
9 Meghalaya E.KHASI H. UM RILANG I 78 O/7,11 UM RILANG UM RILANG 165.7 38.6 87.6 1704 91-18-30 25-19-00 RF 100 0.75 1.68 4.01 559 1258 3007
10 Meghalaya E.KHASI H. UM RILANG II 78 O/7,11 UM RILANG UM RILANG 172.7 37 88.7 1704 91-19-00 25-21-00 RF 100 0.76 1.71 4.09 571 1283 3068
11 Meghalaya E.KHASI H. UM SAITH KHAW 78 O/11 UM SAITH KHAW
BAGRA 14.6 9.0 22.5 1720 232 91-37-15 25-16-00 RF 100 0.23 0.52 1.23 172 386 924
12 Meghalaya E.KHASI H. UM SAITHKAW 78 O/11 UM SAITHKAW BAGRA/UMIEW R.
7.1 4.5 13.5 1720 232 91-35-15 25-37-15 RF 140 0.16 0.36 0.87 169 381 911
13 Meghalaya E.KHASI H. UM SHAID 78 O/9 UM SHAID KHRI R. 56.6 21.5 45.0 250 91-34-45 25-48-30 RF 20 0.44 1.00 2.38 66 149 357
14 Meghalaya E.KHASI H. UM SHAMPU 83 C/3 UM SHAMPU MYNTDU NADI 17.2 6.0 16.0 1331 971 92-10-30 25-21-00 RF 200 0.25 0.56 1.33 372 837 2001
15 Meghalaya E.KHASI H. UM SOHRA 78 O/15 UM SOHRA UM SOHRA 56.6 22.8 47.8 1915 91-47-30 25-16-45 RF 200 0.44 1.00 2.38 664 1493 3569
16 Meghalaya E.KHASI H. UMRAN 78 O/13,O/14 UMRAN UMRAN 76.9 20.5 49.0 1056 550 91-52-15 25-48-50 RF 40 0.51 1.15 2.76 154 346 828
17 Meghalaya E.KHASI H. WAH MINSAT 83 C/3 WAH MINSAT UM NGOT 24.2 10.5 25.0 1472 260 92-02-20 25-19-00 RF 300 0.29 0.66 1.57 659 1482 3543
18 Meghalaya E.KHASI H. WAH RAMLYAM 78 O/6 WAH RAMLYAM
KHONDRI 32.7 11.3 27.9 1923 91-25-55 25-37-00 RF 80 0.34 0.76 1.82 203 457 1094
19 Meghalaya E.KHASI H. WAH RASHI 83 C/3 WAH RASHI UM NGOT 15.5 11.5 20.0 1375 620 92-07-10 25-19-15 RF 200 0.24 0.53 1.27 354 795 1902
20 Meghalaya E.KHASI H. WAH TYMSHUN 78 O/11,O/15 WAH TYMSHUN
WAH TYMSHUN
27.1 12.5 25.0 1662 160 91-47-30 25-15-15 RF 20 0.31 0.70 1.66 46 104 250
21 Meghalaya E.KHASI H. WAH TYRSAW 78 O/15 WAH TYRSAW UM NGOT 24.1 13.0 27.5 1450 113 91-59-00 25-15-20 RF 200 0.29 0.66 1.57 438 986 2357
22 Meghalaya E.KHASI H. WAH UMKHRAH 78 O/14 WAH UMKHRAH
WAH UMIAM 22.7 10.0 25.0 1700 981 91-52-15 25-35-05 RF 100 0.28 0.64 1.53 213 479 1145
23 Meghalaya E.KHASI H. WAH URNAR 78 O/7 WAH URNAR UM NGI 48.4 15.5 34.0 1603 90 91-21-10 25-16-30 RF 40 0.41 0.92 2.21 123 277 662
24 Meghalaya JAINTA H. UM ROONG 83 C/7 UM ROONG KADUMA NALA
21.9 11.0 27.5 1325 1032 92-27-30 25-23-00 RF 60 0.28 0.63 1.50 126 282 675
25 Meghalaya JANTIA H. MYNTDU NADI 83 C/3,7 MYNTDU NADI MYNTDU NADI 299 47.5 93.5 1495 576 91-12-15 25-15-45 RF 40 0.99 2.23 5.34 298 670 1603
26 Meghalaya JANTIA H. UMNGOT 78 O/14,14,83 C/2,3
UMNGOT UMNGOT 304.1 48.5 101.0 1912 850 91-07-10 25-20-30 RF 60 1.00 2.25 5.39 451 1014 2424
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
2
S.NO. STATE DISTRICT CATCHMENT RTS STM BSN A Sq Km
L Km
P Km
Zh m
Zl m
LON LAT FED HEAD Dependable Discharge Power
90% 75% 50% 90% 75% 50%
27 Meghalaya RI-BHOI UM SOHRIKHOH R. 83 C/1 UM SOHRIKHOH R.
UM SHIYAW 16.3 8.0 19.0 1212 740 92-04-15 25-50-20 RF 60 0.24 0.54 1.30 109 245 585
28 Meghalaya W.GARO H. CHIBE R. 78 K/11 CHIBE R. SIMSANG R. 77.9 28.0 49.0 1047 40 90-37-00 25-18-40 RF 20 0.52 1.16 2.78 78 174 417
29 Meghalaya W.GARO H. DARENG R. 78 K/7 DARENG R. DARENG R. 61.7 21.5 40.0 1191 34 90-26-00 25-26-30 RF 40 0.46 1.04 2.48 138 311 744
30 Meghalaya W.GARO H. DARENG R. 78 K/7 DARENG R. DARENG R. 61.7 21.5 40.0 1191 34 90-26-00 25-19-30 RF 50 0.46 1.04 2.48 173 389 930
31 Meghalaya W.GARO H. GALWANG 78 K/2 GALWANG GALWANG 51.1 14.7 35.6 265 90-08-57 25-38-35 RF 20 0.42 0.95 2.26 63 142 340
32 Meghalaya W.GARO H. GALWANG N. 78 K/2 GALWANG N. KHUPARA N. 72.9 23.8 42.5 599 140 90-05-50 25-39-15 RF 20 0.50 1.13 2.69 75 169 404
33 Meghalaya W.GARO H. GANOL 78 K/2 GANOL GALWANG 55.8 15.5 34.8 90-08-52 25-39-00 RF 20 0.44 0.99 2.36 66 148 354
34 Meghalaya W.GARO H. GANOL R. 78 K/2,K/6,K/7 GANOL R. GANOL N. 110.4 24.5 52.5 1372 340 90-14-00 25-35-00 RF 20 0.61 1.38 3.29 92 207 494
35 Meghalaya W.GARO H. KHAKIJA CHIBIMA 78 K/7 KHAKIJA CHIBIMA
DERANG R. 60.9 22.0 41.5 1011 34 90-26-15 25-39-10 RF 20 0.46 1.03 2.47 69 155 370
36 Meghalaya W.GARO H. KHAKIJA CHIBIMA 78 K/7 KHAKIJA CHIBIMA
DERANG R. 33.3 12.0 27.5 1011 110 90-27-30 25-21-45 RF 60 0.34 0.77 1.84 154 346 827
37 Meghalaya W.GARO H. RONGBANG CHIRING 78 K/6,K/7 RONGBANG CHIRING
SIMSANG R. 29.8 10.5 26.5 1362 360 90-23-15 25-32-20 RF 160 0.32 0.73 1.74 389 874 2091
38 Meghalaya W.GARO H. RONGDIK R. 78 K/11 RONGDIK R. RONGDIK R. 71.9 23.0 41.0 1047 40 90-36-00 25-18-45 RF 20 0.50 1.12 2.67 75 168 401
39 Meghalaya W.GARO H. RONGMUTU NALA 78 K/11 RONGMUTU NALA
SIMSANG R. 58.7 16.5 31.0 1000 140 90-42-45 25-25-15 RF 20 0.45 1.01 2.42 68 152 363
40 Meghalaya W.GARO H. RONGON N. 78 K/11 RONGON N. SIMSANG R. 42.3 15.0 32.5 970 240 90-37-20 25-28-30 RF 20 0.38 0.86 2.07 58 130 310
41 Meghalaya W.GARO H. RONGRAM N. 78 K/2,K/6 RONGRAM N. GANOL N. 43.4 16.5 40.0 996 340 90-13-50 25-35-00 RF 20 0.39 0.87 2.09 58 131 314
42 Meghalaya W.GARO H. RONGRE N. 78 K/10,K/11 RONGRE N. SIMSANG R. 12.3 8.7 17.5 784 240 90-35-40 25-30-30 RF 20 0.21 0.47 1.13 32 71 170
43 Meghalaya W.GARO H. RONGTHAM N. 78 K/10,K/11 RONGTHAM N. SIMSANG R. 76.4 26.0 47.5 695 122 90-43-15 25-27-20 RF 20 0.51 1.15 2.75 77 173 413
44 Meghalaya W.GARO H. RONKHON N. 78 K/2,K/6 RONKHON N. GENOL R. 28.1 12.2 30.0 1203 180 90-12-15 25-33-30 RF 20 0.31 0.71 1.69 47 106 254
45 Meghalaya W.GARO.H. RONGKHAI R. 78 K/15 RONGKHAI R. RONGKHAI R. 123.1 20.5 107.5 860 120 90-47-45 25-22-10 RF 20 0.65 1.45 3.47 97 218 521
46 Meghalaya W.KHASI H. BHIANG N. 78 O/3,O/7 BHIANG N. KYNSHI/KYNSHIANG R.
12.8 9.6 19.5 1502 1100 91-14-45 25-26-30 RF 60 0.21 0.48 1.16 97 217 520
47 Meghalaya W.KHASI H. RIANGDO I 78 K/14,O/2 RIANGDO RIANGDO 114.3 45.5 96 1141 400 90-50-00 25-31-30 RF 140 0.62 1.40 3.35 654 1470 3515
48 Meghalaya W.KHASI H. RIANGDO II 78 K/14,O/2 RIANGDO RIANGDO 108.6 39.7 88.9 1141 90-51-00 25-32-00 RF 80 0.61 1.37 3.27 364 819 1959
49 Meghalaya W.KHASI H. RIANGDO III 78 K/14,O/2 RIANGDO RIANGDO 125.8 45.2 100.2 1141 203 90-48-00 25-32-00 RF 180 0.65 1.47 3.51 881 1980 4735
50 Meghalaya W.KHASI H. RIANGDO IV 78 K/14,O/2 RIANGDO RIANGDO 119.5 46.6 95.2 1141 90-49-00 25-31-30 RF 140 0.64 1.43 3.42 668 1502 3592
51 Meghalaya W.KHASI H. RIANGDO R. 78 K/14,O/2 RIANGDO R. RONGDI R. 117.9 44.5 88.0 1141 203 90-47-45 25-31-10 RF 20 0.63 1.42 3.40 95 213 510
52 Meghalaya W.KHASI H. RIANGDO R. 78 K/14,O/2 RIANGDO R. RONGDI R. 107.5 38.5 99.5 1141 203 90-47-45 25-31-30 RF 50 0.60 1.36 3.25 227 510 1219
53 Meghalaya W.KHASI H. RIWIYANG 78 O/2,O/6 RIWIYANG UM RABING 60.7 14.0 45.0 1602 1138 91-14-00 25-37-30 RF 50 0.46 1.03 2.46 172 386 923
54 Meghalaya W.KHASI H. RIWIYANG 78 O/2,O/6 RIWIYANG UM RABING 60.7 14.0 45.0 1602 1138 91-14-00 25-37-30 RF 40 0.46 1.03 2.46 137 309 738
55 Meghalaya W.KHASI H. RONGA N. 78 K/13,K/14 RONGA N. RONGDI R. 85.1 27.5 60.5 911 510 90-52-30 25-36-20 RF 20 0.54 1.21 2.90 81 182 435
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
3
S.NO. STATE DISTRICT CATCHMENT RTS STM BSN A Sq Km
L Km
P Km
Zh m
Zl m
LON LAT FED HEAD Dependable Discharge Power
90% 75% 50% 90% 75% 50%
56 Meghalaya W.KHASI H. RONGTHALI 78 O/1,O/2,K/13,K/14
RONGTHALI SINGRA N. 96 23.5 55.0 964 62 91-09-10 25-51-15 RF 20 0.57 1.29 3.08 86 193 461
57 Meghalaya W.KHASI H. UM DKHAR 78 O/3 UM DKHAR WAH BLEI 37.8 15.0 31.0 818 171 91-03-30 25-19-50 RF 20 0.36 0.82 1.96 55 123 293
58 Meghalaya W.KHASI H. UM NANAPA 78 O/6 UM NANAPA KYNSHI R. 67.6 20.5 54.5 1735 1300 91-15-30 25-30-40 RF 20 0.48 1.08 2.59 72 163 389
59 Meghalaya W.KHASI H. UM PHUDBAH 78 O/10 UM PHUDBAH KHRI R. 86.5 28.5 61.5 1793 720 91-41-00 25-42-50 RF 20 0.54 1.22 2.92 82 183 439
60 Meghalaya W.KHASI H. UM RITHA 78 O/6 UM RITHA KYNSHI R. 84.7 22.5 60.0 1735 1220 91-15-30 25-30-00 RF 40 0.54 1.21 2.89 161 363 868
61 Meghalaya W.KHASI H. UM SOPHEW 78 O/3,O/7 UM SOPHEW KYNSHI/JADUKATA R.
33.6 16.0 33.0 1323 52 91-10-15 25-16-10 RF 100 0.34 0.77 1.85 258 579 1385
62 Meghalaya W.KHASI H. UM TYRSUNG 78 O/1,O/2 UM TYRSUNG UM BAJU/SINGRA N.
85.8 20.0 58.0 1407 250 91-08-15 25-47-30 RF 100 0.54 1.22 2.91 406 913 2184
63 Meghalaya W.KHASI H. WAH LAW 78 K/14,15 WAH LAW WAH LAW 186.8 21.8 74 90-58-00 25-24-00 RF 60 0.79 1.78 4.25 356 800 1913
64 Meghalaya W.KHASI H. WAH PHODTHRA 78 O/3 WAH PHODTHRA
KYSHI/JADUKADA R.
65.7 23.5 40.5 1400 80 91-09-10 25-17-30 RF 20 0.48 1.07 2.56 71 160 384
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
1
Mizoram
S.NO. STATE DISTRICT CATCHMENT RTS STM BSN A SqKm
L Km
P Km
Zh m
Zl m
LON LAT SF/GF/RF
HEAD Dependable Discharge Power
90% 75% 50% 90% 75% 50%
1 Mizoram AIZAWL AIER LUI 84 A/13 AIER LUI TUIVAWL R. 16.9 8.7 19.7 1525 220 92-59-49 23-58-00 RF 100 0.04 0.11 0.26 31 79 198
2 Mizoram AIZAWL CHAMRING N. 84 A/15 CHAMRING N. MAT R. 18.1 8 19.5 1619 610 92-49-50 23-24-00 RF 80 0.04 0.11 0.29 27 69 173
3 Mizoram AIZAWL CHHIMLUANG LUI 84 A/13 CHHIMLUANG LUI
TUIRINI LUI 17.2 8.4 17 1064 99 92-50-50 23-50-10 RF 160 0.04 0.11 0.27 50 129 324
4 Mizoram AIZAWL CHITE LUI 84 A/10,14 CHITE LUI TUIRIAL R. 51.8 15 37 1156 150 92-47-30 23-39-10 RF 40 0.16 0.42 1.04 49 125 312
5 Mizoram AIZAWL DUR LUI 84 A/9 DUR LUI TLAWNG/DHALESHWARI R.
38.8 15.5 28.0 1535 60 92-39-20 23-54-00 RF 20 0.11 0.29 0.73 17 44 110
6 Mizoram AIZAWL INRUM LUI 84 A/3 INRUM LUI TUIRINI LUI 19.1 6.6 20.9 1866 200 92-52-20 23-48-10 RF 100 0.05 0.12 0.31 36 92 230
7 Mizoram AIZAWL KAIHZAWL LUI 84 A/14 KAIHZAWL LUI
TULRINI LUI 28.8 11.0 25.0 1400 250 92-53-40 23-40-00 RF 20 0.08 0.20 0.51 12 30 76
8 Mizoram AIZAWL KAWRTELLAN LUI 84 A/5 KAWRTELLAN LUI
LANGAI R. 19.8 9.0 20.0 848 200 92-20-00 23-54-55 RF 20 0.05 0.13 0.32 7 19 48
9 Mizoram AIZAWL KHUAI LUI 84 A/9 KHUAI LUI TLAWNG/DHALESHWARI R.
62.9 12.5 37.5 1535 40 92-39-50 23-55-05 RF 20 0.21 0.53 1.32 31 79 198
10 Mizoram AIZAWL LUNGHMUI LUI 84 A/9 LUNGHMUI LUI
TLAWNG/DHALESHWARI
32.3 11.5 27.0 1024 42 92-37-30 23-53-00 RF 20 0.09 0.23 0.58 14 35 88
11 Mizoram AIZAWL MAT R. 84 A/14,15 MAT R. MAT R. 124.6 24.9 55.5 1619 550 92-50-05 23-22-00 RF 140 0.47 1.22 3.05 497 1276 3200
12 Mizoram AIZAWL MUTHI LUI 84 A/9,10,13,14
MUTHI LUI SONAI/TUIRIAL R.
28.9 10.0 23.0 1383 120 92-48-30 23-45-40 RF 60 0.08 0.20 0.51 36 92 229
13 Mizoram AIZAWL PHAISEN LUI 84 E/2,E/3 PHAISEN LUI TUICHANG R. 94 20.0 50.5 1577 514 93-05-05 23-25-20 RF 20 0.34 0.86 2.16 50 129 324
14 Mizoram AIZAWL RAIFAN LUI 84 E/3,E/4 RAIFAN LUI TUIPUI R. 93.6 19.5 41.0 1562 500 93-11-05 23-16-00 RF 20 0.33 0.86 2.15 50 128 322
15 Mizoram AIZAWL RAMRI LUI 84 A/4 RAMRI LUI GUTUR/TUT R. 3.7 3.0 9.0 700 60 92-31-45 23-54-15 RF 80 0.01 0.02 0.04 4 10 25
16 Mizoram AIZAWL RAMRI-LUI 84 A/14 RAMRI-LUI SONAI/TUIRAL R.
6.7 3.5 10.5 1030 260 92-53-15 23-39-15 RF 40 0.01 0.03 0.09 4 10 26
17 Mizoram AIZAWL SAIPUI LUI 84 A/10 SAIPUI LUI DHALESWARI R.
15.8 6.2 17.2 980 260 92-39-30 23-33-30 RF 60 0.04 0.10 0.24 17 44 110
18 Mizoram AIZAWL SAIRANG LUI 84 A/9,A/10 SAIRANG LUI TLAWNG/DHALESHWARI R.
61.9 13.0 35.0 1382 50 92-39-20 23-49-00 RF 20 0.20 0.52 1.29 30 77 194
19 Mizoram AIZAWL SER LUI 84 A/10 SER LUI TLAWNG/DHALES WARI R.
35.7 10.0 25.0 1179 95 92-40-05 23-42-35 RF 40 0.10 0.26 0.66 31 79 198
20 Mizoram AIZAWL SUIBUAL LUI 84 A/14 SUIBUAL LUI TUIRIAL R. 23.8 6.8 20.4 982 145 92-48-00 23-43-00 RF 100 0.06 0.16 0.40 47 120 302
21 Mizoram AIZAWL TELVA LUI 84 A/10 TELVA LUI GUTUR R. 23.1 8 21.1 1189 92-31-30 23-31-30 RF 60 0.06 0.15 0.39 27 70 174
22 Mizoram AIZAWL TUICHHUN LUI 84 A/10 TUICHHUN LUI DHALESWARI R.
17.9 6.5 17.7 1145 169 92-39-00 23-35-30 RF 100 0.04 0.11 0.28 33 85 213
23 Mizoram AIZAWL TUIKANG LUI 84 A/10 TUIKANG LUI DHALESWARI R.
27 7.8 25.3 1179 92-40-40 23-37-30 RF 80 0.07 0.19 0.47 44 112 282
24 Mizoram AIZAWL TUIKUAL LUI 84 A/15 TUIKUAL LUI TUIKUM LUI 40.6 13.0 28.0 1614 588 92-54-15 23-26-10 RF 20 0.12 0.31 0.77 18 46 116
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
2
S.NO. STATE DISTRICT CATCHMENT RTS STM BSN A SqKm
L Km
P Km
Zh m
Zl m
LON LAT SF/GF/RF
HEAD Dependable Discharge Power
90% 75% 50% 90% 75% 50%
25 Mizoram AIZAWL TUIPHU LUI 84 A/14 TUIPHU LUI TUIRIAL R. 23.7 9.1 23.4 1423 92-47-50 23-33-00 RF 120 0.06 0.16 0.40 56 144 360
26 Mizoram AIZAWL TUIRINI LUI 84 A/13,14,15 TUIRINI LUI SONAI/TUIRIAL R.
416.3 51.5 114.0 1905 80 92-50-00 23-51-00 RF 20 2.07 5.32 13.33 311 798 2000
27 Mizoram AIZAWL TUIRINI LUI 84 A/14,A/15 TUIRINI LUI TUIRINI LUI 100.6 11.0 45.0 1837 300 92-53-40 23-36-50 RF 20 0.36 0.94 2.35 55 140 352
28 Mizoram AIZAWL TUIRLUANG LUI 84 A/10,A/14 TUIRLUANG LUI
SONAL/TULRIAL R.
75.8 14.5 37.5 1011 220 92-46-30 23-34-55 RF 20 0.26 0.66 1.66 39 99 249
29 Mizoram AIZAWL TUISEN LUI 84 A/9,13 TUISEN LUI TUIRIAL R. 38.4 11.3 26.5 1535 20 92-48-20 23-55-10 RF 200 0.11 0.29 0.72 168 432 1083
30 Mizoram AIZAWL TUISEN LUI 84 A/10 TUISEN LUI DHALESWARI R.
13.2 7.7 16.7 1485 92-38-30 23-44-00 RF 100 0.03 0.08 0.20 23 58 147
31 Mizoram AIZAWL TULMARUL LUI 84 E/2 TULMARUL LUI
TUICHANG R. 121.8 22.0 56.5 1587 584 93-06-45 23-35-00 RF 20 0.46 1.18 2.96 69 177 445
32 Mizoram AIZAWL UINAK LUI 84 A/10 UINAK LUI GUTUR/TUT R. 56.7 17.0 37.0 1355 100 92-31-00 23-35-20 RF 20 0.18 0.46 1.16 27 70 174
33 Mizoram AIZAWL VARH-VA 84 E/4 VARH-VA TUICHANG R. 52.8 20.0 41.5 1854 419 93-02-15 23-14-45 RF 60 0.17 0.43 1.07 75 191 480
34 Mizoram AIZAWL ZILNGAL LUI 84 A/14 ZILNGAL LUI SONAI/TUIRIAL R.
56.1 13.5 35.0 1288 150 92-47-30 23-38-50 RF 20 0.18 0.46 1.15 27 69 172
35 Mizoram CHHIMTUIPUI
KAWRTHINGDENG LU
84 B/15 KAWRTHINGDENG LU
KOLADYNE/TUIPUI R.
28.4 10.5 25.5 652 50 92-49-30 22-19-30 RF 20 0.08 0.20 0.50 12 30 75
36 Mizoram CHHIMTUIPUI
MENGPUI LUI 84 B/15 MENGPUI LUI TUIPUI LUI 220.3 55.1 59.7 1466 10 92-49-30 22-20-00 RF 100 0.95 2.44 6.12 713 1831 4590
37 Mizoram CHHIMTUIPUI
PALAK LUI 84 B/15,B/16 PALAK LUI KOLADYNE/TUIPUI R.
134.3 26.5 51.0 1405 80 92-52-30 22-20-05 RF 20 0.52 1.33 3.34 78 200 501
38 Mizoram CHHIMTUIPUI
RAKI LUI 84 F/3 RAKI LUI BOINU/TUIPUI R.
32 10.0 25.0 1750 400 93-11-30 22-21-45 RF 20 0.09 0.23 0.58 13 35 87
39 Mizoram CHHIMTUIPUI
SIACHANG LUI 84 F/2,F/3 SIACHANG LUI BOINU/TUIPUI R.
118.7 15.5 50.5 2157 320 93-06-15 22-32-30 RF 60 0.45 1.15 2.87 201 515 1292
40 Mizoram CHHIMTUIPUI
TUIKHUR LUI 84 B/15 TUIKHUR LUI KOLADYNE/TUIPUI R.
5 2.5 9.0 649 50 92-47-15 22-27-40 RF 20 0.01 0.02 0.06 1 4 9
41 Mizoram CHHIMTUIPUI
TUILEHLUANG N. 84 B/14,F/2 TUILEHLUANG N.
KOLADYNE/TUIPUI R.
37.1 7.0 26.5 1578 140 92-55-50 22-34-10 RF 20 0.11 0.28 0.69 16 41 104
42 Mizoram CHHIMTUIPUI
TUIPANG LUI 84 B/15,F/3 TUIPANG LUI TUIPANG LUI 25.5 8.7 21.6 1641 942 92-59-55 22-16-00 RF 40 0.07 0.17 0.44 20 52 131
43 Mizoram LUNGLEI HNAHCHANG LUI 84 B/13,F/1 HNAHCHANG LUI
KOLADYNE/TUIPUI R.
89.9 23.5 44.5 1693 180 92-56-10 22-54-15 RF 20 0.32 0.82 2.04 48 122 307
44 Mizoram LUNGLEI MENGPUI LUI 84 B/13,B/14 MENGPUI LUI MEGHPURI LUI
108.4 21.0 52.7 1556 184 92-47-00 22-43-30 RF 60 0.40 1.02 2.57 180 461 1156
45 Mizoram LUNGLEI NGENGRUAL N. 84 B/14 NGENGRUAL N.
MAT R. 84.3 20.0 42.5 1551 173 92-52-50 22-44-00 RF 20 0.29 0.75 1.89 44 113 283
46 Mizoram LUNGLEI PAWH LUI 84 F/1 PAWH LUI TUIPUI R. 21 9.9 21.7 1201 200 93-02-00 23-56-50 RF 180 0.05 0.14 0.35 72 186 466
47 Mizoram LUNGLEI RUANGTE LUI 84 B/9,B/13 RUANGTE LUI DEH R. 73 17.5 44.0 1183 60 92-40-00 22-48-50 RF 20 0.25 0.63 1.58 37 95 238
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
3
S.NO. STATE DISTRICT CATCHMENT RTS STM BSN A SqKm
L Km
P Km
Zh m
Zl m
LON LAT SF/GF/RF
HEAD Dependable Discharge Power
90% 75% 50% 90% 75% 50%
48 Mizoram LUNGLEI SAILUNREK LUI 84 B/9 SAILUNREK LUI
DEH R. 60.2 16.0 38.0 893 60 92-38-30 22-49-45 RF 20 0.19 0.50 1.25 29 75 188
49 Mizoram LUNGLEI TUIPHAI LUI 84 E/4 TUIPHAI LUI TUIPHAI LUI 69.1 13.8 36 1791 780 93-02-10 23-02-00 RF 100 0.23 0.59 1.48 173 443 1111
50 Mizoram LUNGLEI VANVATE LUL 84 A/16 VANVATE LUL MAT R. 149.3 30.0 60.0 1160 368 92-52-30 23-03-15 RF 20 0.59 1.52 3.80 89 227 570
51 Mizoram LUNGLEI ZABAWH LUI 84 A/12,16 ZABAWH LUI DHALESWARI R.
8 5.2 13.1 1189 344 92-43-40 23-03-40 RF 60 0.02 0.04 0.11 7 19 48
52 Mizoram LUNGLEI/CHHIMTU
SAHRI LUI 84 B/14 SAHRI LUI KOLADYNE/TUIPUI R.
32.6 10.0 23.5 1327 137 92-56-00 22-33-00 RF 20 0.09 0.24 0.59 14 35 89
3755 9642 24176
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
1
Nagaland
S.NO. STATE DISTRICT CATCHMENT RTS STM BSN A SqKm
L Km
P Km
Zh m
Zl m
LON LAT SF/GF/RF
HEAD Dependable Discharge Power
90% 75% 50% 90% 75% 50%
1 Nagaland KOHIMA DIPHUPANI R. 83 G/13,14 DIPHUPANI R. DIPHU R. 239.9 23 72.2 2326 93-48-50 25-46-10 RF 80 1.05 2.71 6.79 633 1625 4075
2 Nagaland KOHIMA DZULADI 83 G/14 DZULADI RU DZUPVO R. 71 17.5 42.0 2790 1060 93-53-15 25-34-00 RF 40 0.24 0.61 1.53 71 183 459
3 Nagaland KOHIMA DZUNA 83 K/2 DZUNA N. DZUNA N. 30.8 11.0 30.5 3015 1020 94-02-15 25-41-00 RF 50 0.09 0.22 0.55 32 82 207
4 Nagaland KOHIMA DZUNA 83 K/2 DZUNA RU DZULU R. 72.6 15.5 36.5 3015 850 94-11-30 25-38-50 RF 40 0.24 0.63 1.57 73 188 472
5 Nagaland KOHIMA DZUZA 83 K/2 DZUZA N. DZUZA 103.7 13.5 43.4 2868 840 94-03-30 23-42-30 RF 120 0.38 0.97 2.43 340 874 2191
6 Nagaland KOHIMA DZUZA ST-II 83 K/2 DZUZA N. DZUZA 42.1 8.5 25.6 2868 1060 94-03-00 25-41-00 RF 120 0.13 0.32 0.81 113 290 727
7 Nagaland KOHIMA DZUZA ST-III 83 K/2 DZUZA N. DZUZA 74.1 9 34.2 3015 960 94-03-30 25-41-30 RF 120 0.25 0.64 1.61 226 579 1452
8 Nagaland KOHIMA INKYO 83 G/11 INKYO N. SULEN N. 87.6 19.5 43.1 2010 720 93-35-40 25-22-15 RF 60 0.31 0.79 1.98 138 355 891
9 Nagaland KOHIMA JADU 83 G/11,12,15,16
JADU KI BARAK/TUILONG 96.6 16.0 45.0 2190 288 93-39-50 25-17-40 RF 40 0.35 0.89 2.23 104 267 670
10 Nagaland KOHIMA KEHO 83 K/2 KEHO RU DZUZU R. 30 10.0 25.0 2997 1050 94-10-10 25-35-00 RF 60 0.08 0.21 0.53 37 96 240
11 Nagaland KOHIMA KHE 83 K/2 KHE RU. DZUZU R. 10.33 6.0 15.5 2235 700 94-03-10 25-43-00 RF 80 0.02 0.06 0.14 13 35 87
12 Nagaland KOHIMA LENTHANG 83 G/10,G/11 LENTHANG KI DUISAIKI N. 108.3 19.5 50.0 2062 280 93-31-15 25-34-10 RF 20 0.40 1.02 2.57 60 154 385
13 Nagaland KOHIMA METSU 83 K/1,K/5 METSU RU DIYUNG/TAPU R. 106.1 17.0 42.5 1735 540 94-19-00 25-56-00 RF 20 0.39 1.00 2.50 58 150 376
14 Nagaland KOHIMA NRO 83 K/1 NRO R. NRO R. 135.6 24.0 50.0 1751 340 94-04-50 25-55-00 RF 40 0.52 1.35 3.38 157 404 1014
15 Nagaland KOHIMA NZU 83 K/1 NZU R. NZU R. 53.6 12.8 29.2 1576 94-07-30 25-57-00 RF 80 0.17 0.43 1.09 101 260 651
16 Nagaland KOHIMA RENGMA 83 G/13,14,K/1,2
RENGMA R. RENGMA R. 347.9 41.1 101.1 800 93-58-30 25-54-00 RF 100 1.66 4.27 10.70 1247 3202 8027
17 Nagaland KOHIMA SEDZU 83 K/2,3,6 SEDZU R. SEDZU R. 163.4 41.6 64.7 2045 770 94-13-00 25-38-00 RF 120 0.66 1.69 4.25 594 1524 3821
18 Nagaland KOHIMA SULEN ST-II 83 G/7,11 SULEN BARAK SULEN BARAK 309.9 35.7 197.3 2037 471 93-35-15 25-16-50 RF 75 1.44 3.71 9.29 812 2084 5226
19 Nagaland KOHIMA SULEN-I 83 G/7,11 SULEN BARAK SULEN BARAK 317.1 36.5 197.3 2037 460 93-35-40 25-15-40 RF 40 1.48 3.81 9.56 445 1143 2867
20 Nagaland KOHIMA TASANG KI BARAK
83 G/10,11 TASANG KI BARAK R. 145.5 22.3 58.9 2062 321 93-41-30 25-22-00 RF 80 0.57 1.47 3.68 343 882 2210
21 Nagaland MOKOKCHUNG
CHIMEI 83 J/11,J/12 CHIMEI R. PHOMCHI R. 77.4 20.5 47.0 2016 450 94-40-10 26-20-50 RF 20 0.26 0.68 1.70 40 102 255
22 Nagaland MOKOKCHUNG
CHIMICHAN 83 J/7 CHIMICHAN AYON
CHUBI R. 53.7 14.0 30.5 1601 476 94-25-40 26-21-00 RF 20 0.17 0.43 1.09 25 65 163
23 Nagaland MOKOKCHUNG
DIKHU 83 J/7,8,11,12 DIKHU R. DIKHU R. 368 53.0 92.0 2066 420 94-39-45 26-21-50 RF 20 1.78 4.57 11.46 267 686 1720
24 Nagaland MOKOKCHUNG
NANEYONG 83 J/11 NANEYONG NALA
DIKHU R. 21.7 8.0 19.0 1504 474 94-36-35 26-19-05 RF 60 0.06 0.14 0.36 25 64 162
25 Nagaland MOKOKCHUNG
NANUNG 83 J/11 NANUNG NALA DIKHUR .R. 39.7 17.5 35.0 1475 350 94-41-30 26-28-10 RF 40 0.12 0.30 0.75 35 90 226
26 Nagaland MOKOKCHUNG
TSIMUK 83 J/10,J/11 TSIMUK N. MELAK R. 157.5 26.5 58.0 1504 150 94-34-10 26-32-15 RF 20 0.63 1.62 4.06 95 243 609
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
2
S.NO. STATE DISTRICT CATCHMENT RTS STM BSN A SqKm
L Km
P Km
Zh m
Zl m
LON LAT SF/GF/RF
HEAD Dependable Discharge Power
90% 75% 50% 90% 75% 50%
27 Nagaland MOKOKCHUNG
TSUMOK 83 J/10 TSUMOK N. MELAK R. 83.9 13.5 38.5 1153 240 94-36-00 26-35-20 RF 20 0.29 0.75 1.88 44 112 282
28 Nagaland MOKOKCHUNG
TSUTILANG 83 J/10 TSUTILANG N. MELAK/JHANZI R. 20.7 10.0 19.0 973 140 94-38-50 26-40-00 RF 20 0.05 0.14 0.34 8 20 51
29 Nagaland MOKOKCHUNG
TSUTSUNG YONGK
83 J/11,J/12 TSUTSUNG YONGK
DIKHU R. 65 16.5 35.5 2130 589 94-34-00 26-16-30 RF 20 0.21 0.55 1.37 32 82 206
30 Nagaland MOKOKCHUNG
TULI 83 J/10 TULI N. MELAK R. 29.8 10.0 22.5 799 240 94-38-45 26-40-45 RF 20 0.08 0.21 0.53 12 32 79
31 Nagaland MON HOYIANG 83 J/14 HOYIANG N. YANGNYU R. 35.9 7.5 24.5 1499 240 94-54-15 26-38-00 RF 40 0.10 0.27 0.66 31 80 199
32 Nagaland MON PHOYO 83 N/2 PHOYO N. TAPI R. 13.9 11.0 19.0 1500 350 95-01-30 26-37-15 RF 20 0.03 0.08 0.21 5 12 31
33 Nagaland MON SENYAG 83 J/14 SENYAG N. YANGNYU R. 37.3 17.5 34.0 2002 280 94-55-30 26-37-30 RF 40 0.11 0.28 0.70 32 83 209
34 Nagaland MON SHONGSHU 83 J/14 SHONGSHU N. LAINU/YANGMUN R.
29 11.5 26.0 2002 275 94-53-15 26-35-00 RF 40 0.08 0.20 0.51 24 61 154
35 Nagaland MON TILAM 83 N/2 TILAM N. TAPI R. 59.2 18.5 48.0 2414 398 95-04-00 26-40-15 RF 40 0.19 0.49 1.23 57 147 368
36 Nagaland MON TOHOK/TIPUI 83 N/2,N/3 TOHOK/TIPUI R. TOHOK/TIPUI R. 125.3 14.5 57.0 2221 428 95-02-00 26-34-55 RF 20 0.48 1.22 3.07 71 184 460
37 Nagaland PHEK ARACHU NADI ST-I
83 K/10 ARACHU NADI TIZU R. 192.1 23.8 57 2460 643 94-39-15 25-39-30 RF 80 0.80 2.06 5.18 482 1238 3105
38 Nagaland PHEK ARACHU NADI ST-II
83 K/10 ARACHU NADI TIZU R. 129.3 13.7 45.7 2460 606 94-39-30 25-37-30 RF 85 0.50 1.27 3.19 316 811 2033
39 Nagaland PHEK ARACHU NADI ST-III
83 K/10 ARACHU NADI TIZU R. 121.1 11.9 43.9 2460 680 94-39-55 25-36-10 RF 60 0.46 1.17 2.94 206 528 1324
40 Nagaland PHEK ARACHU NADI ST-IV
83 K/10 ARACHU NADI ARACHU NADI 56.3 12.2 30.6 2327 800 94-39-50 25-33-30 RF 40 0.18 0.46 1.15 54 138 346
41 Nagaland PHEK CHUTULA LAKUA 83 K/10 CHUTULA LAKUA
ARACHU NADI 28 9.2 24.7 2387 606 94-39-30 25-37-20 RF 120 0.08 0.20 0.49 69 176 442
42 Nagaland PHEK KITBURI 83 K/9,K/10 KITBURI N. TIZU R. 96 19.0 45.0 2540 458 94-43-15 25-43-10 RF 20 0.34 0.88 2.22 52 133 332
43 Nagaland PHEK KITHURI 83 K/9 KITHURI N. KITHURI N. 65.6 13.6 36.7 2701 558 94-43-00 25-45-40 RF 120 0.22 0.55 1.39 194 499 1251
44 Nagaland PHEK KUSURUCHU I3 K/9,K/10 KUSURUCHU RUGU
TIZU R. 34.9 12.0 26.0 2487 495 94-41-00 25-41-00 RF 40 0.10 0.26 0.64 30 77 193
45 Nagaland PHEK SHIZATELUKWA N.
83 K/10 SHIZATELUKWA N.
TIZU R. 31.1 9.9 24.2 1303 480 94-43-00 25-43-00 RF 140 0.09 0.22 0.56 91 234 586
46 Nagaland PHEK TSAPHI RUKU 83 K/10 TSAPHI RUKU TIZU R. 17.8 7.0 16.5 2311 555 94-35-50 25-41-00 RF 60 0.04 0.11 0.28 20 51 127
47 Nagaland PHEK TSUTHA 83 J/12,K/9 TSUTHA R. TUZU R. 193.5 32.0 73.0 2701 777 94-31-45 25-51-10 RF 20 0.81 2.08 5.22 122 312 783
48 Nagaland PHEK TUSU 83 K TUSU RU. TIZU R. 191.9 30.5 75.0 2426 800 94-29-00 25-45-45 RF 200 0.80 2.06 5.17 1204 3092 7753
49 Nagaland TUENSANG AUYUNG SHOMANG
83 J/15,J/16 AUYUNG SHOMANG
ETJUNG/YIJUNG R. 40.5 10.5 27.0 2586 720 94-51-00 26-18-00 RF 100 0.12 0.31 0.77 90 231 578
50 Nagaland TUENSANG CHENYAK 83 J/11,15,16 CHENYAK R. PHOMJI R. 63 16.5 37.5 2189 650 94-45-30 26-22-00 RF 20 0.21 0.53 1.32 31 79 198
51 Nagaland TUENSANG HORUNKI 83 J/12,16,K/9,13
HORUNKI ZUNGKI R. 109.35 20.0 45.5 2407 640 94-50-10 26-02-25 RF 60 0.40 1.04 2.60 182 466 1169
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
3
S.NO. STATE DISTRICT CATCHMENT RTS STM BSN A SqKm
L Km
P Km
Zh m
Zl m
LON LAT SF/GF/RF
HEAD Dependable Discharge Power
90% 75% 50% 90% 75% 50%
52 Nagaland TUENSANG LANGA 83 J/12,J/16 LANGA N. ZUNKI/YAI R. 137.9 19.0 108.0 2700 835 94-47-45 26-05-45 RF 20 0.54 1.38 3.45 80 206 517
53 Nagaland TUENSANG LEPUNGSHOTE 83 K/9 LEPUNGSHOTE N.
TIZU R. 20.4 9.0 20.0 2093 439 94-44-50 25-46-10 RF 40 0.05 0.13 0.33 16 40 100
54 Nagaland TUENSANG SISHA 83 J/14,J/15 SISHA N. LAINU/YANGMUN/YANG
68 19.0 39.5 1389 260 94-53-00 26-35-50 RF 20 0.23 0.58 1.45 34 87 218
55 Nagaland TUENSANG SUPAI 83 J/15 SUPAI N. YANGUN/YANGUYU R.
35.1 10.5 26.5 2066 380 94-54-00 26-26-15 RF 40 0.10 0.26 0.65 30 77 194
56 Nagaland TUENSANG TSOHYEMUNG 83 J/16 TSOHYEMUNG N.
ZUNGKI R. 90.1 18.0 42.5 2700 600 94-36-00 26-03-00 RF 40 0.32 0.82 2.05 96 245 615
57 Nagaland TUENSANG TSYOSHOCHE 83 J/12/,J/16 TSYOSHOCHE N.
ZUNKI/YAI R. 116 12.5 44.0 2423 835 94-47-15 26-05-10 RF 20 0.43 1.11 2.79 65 167 419
58 Nagaland TUENSANG TUENYUNG 83 J/15,J/16 TUENYUNG N. ETJUNG/YIJUNG R. 42.5 11.0 28.0 2557 700 94-50-00 26-17-30 RF 100 0.13 0.33 0.82 95 245 613
59 Nagaland TUENSANG YANGSITHSAKI 83 K/9 YANGSITHSAKI TEPE N. 42.3 8.0 22.5 2577 650 94-42-30 25-53-30 RF 40 0.13 0.32 0.81 38 97 244
60 Nagaland TUENSUNG TEPE N. 83 K/9 TEPE N. TEPE N. 110.4 24.2 44.6 2841 670 94-44-00 25-53-00 RF 80 0.41 1.05 2.63 245 629 1577
61 Nagaland WOKHA CHUBEN 83 J/4,J/8 CHUBEN N. DIYONG/TAPU R. 68 19.5 42.5 1900 200 94-07-30 26-05-05 RF 20 0.23 0.58 1.45 34 87 218
62 Nagaland WOKHA ECHUCHU ZUKHU 83 J/8 ECHUCHU ZUKHU
DIYUNG/TAPU .R. 53.1 11.0 30.5 1976 400 94-22-10 26-03-50 RF 40 0.17 0.43 1.07 50 128 322
63 Nagaland WOKHA TONGTONGTSUZUK
83 J/7,J/8 TONGTONGTSUZUK
DIYUNG/TAPU R. 52.6 13.0 32.5 1601 280 94-18-45 26-13-00 RF 40 0.16 0.42 1.06 49 127 318
64 Nagaland ZUNHEBOTO HIPU 83 K/9 HIPU N. TSUTHA/TILA R. 18 8.0 20.0 2701 835 94-33-00 25-52-30 RF 100 0.04 0.11 0.29 33 85 214
65 Nagaland ZUNHEBOTO MELA GHOKI 83 J/12 MELA GHOKI TUZU/TIZU R. 38.6 8.5 25.0 2423 1130 94-38-40 26-06-45 RF 40 0.11 0.29 0.73 34 87 218
66 Nagaland ZUNHEBOTO PIYE 83 J/12 PIYE NALA TUZU/TIZU R. 27.1 9.0 22.0 2200 1080 94-36-45 26-04-15 RF 40 0.07 0.19 0.47 22 56 141
67 Nagaland ZUNHEBOTO TSUMIYA J/8 TSUMIYA NALA DIYUNG/TAPU R. 38.1 11.5 21.5 1238 320 94-20-20 26-10-30 RF 20 0.11 0.29 0.72 17 43 107
68 Nagaland ZUNHEBOTO WORKI 83 J/12 WORKI NALA TUZU/TIZU R. 24.7 7.0 22.5 1975 950 94-34-40 26-02-20 RF 40 0.07 0.17 0.42 20 50 126
69 Nagaland ZUNHEBOTO YONGASHI YONGK
83 K/9 YONGASHI YONGK
TUZU/TIZU R. 22.5 7.0 18.5 2577 903
94-34-15 25-53-15 RF 80 0.06 0.15 0.38 35 90 225
10536
27053 67830
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
1
Sikkim
S.No. STATE
DISTRICT CATCHMENT RTS
STM
BSN
A Sq Km
L Km
P Km
Zh m
Zl m
LON LAT FED HEAD
Dependable Discharge Power (kW)
90% 75% 50% 90% 75% 50%
1 SIKKIM EAST DANAK KHOLA 78 A/12 DANAK DANAK 4.7 3.9 9.25 1937 560 88 38 00 27 12 30 RF 120 0.04 0.07 0.14 35 61 122
2 SIKKIM EAST DI CHU 78 A/11 DI CHU DI CHU 10.1 4.8 12.8 2652 800 88 32 30 27 00 00 SF 200 0.08 0.14 0.29 123 217 434
3 SIKKIM EAST DIKLING KHOLA 78 A/12 DIKLING DIKLING 15.8 6.3 6.5 2145 640 88 32 00 27 11 00 SF 160 0.13 0.23 0.45 153 271 540
4 SIKKIM EAST PACHE 78 A/12 PACHE PACHE 19.3 11.2 20.1 2000 88 34 30 27 12 00 RF 200 0.16 0.28 0.55 234 413 823
5 SIKKIM EAST RABI KHOLA 78 A/8 RABI RABI 37.9 9.1 24.3 1963 236 88 24 40 27 06 30 RF 80 0.30 0.54 1.07 182 322 642
6 SIKKIM EAST RANGCHANG KHOLA
78A/7,A/11 RANGCHANG RANGCHANG 16.3 5.7 17 2361 451 88 29 50 27 17 30 SF 160 0.13 0.23 0.46 158 279 557
7 SIKKIM EAST RANGPO CHHU 78 A/11 RANPO CHHU RANPO CHHU 73.3 15.4 41 4232 88-43-00 27-16-00 RF 240 0.58 1.03 2.05 1049 1854 3699
8 SIKKIM EAST RANI KHOLA 78 A/11 RANI RANI 2.3 3.6 8.8 2065 920 88 33 00 27 17 00 RF 360 0.02 0.03 0.07 51 91 181
9 SIKKIM EAST RE CHU 78 A/11 RE CHU RE CHU 28.4 8.1 21.1 2652 960 88 33 00 27 18 00 SF 80 0.23 0.40 0.80 137 242 483
10 SIKKIM EAST RICHU KHOLA 78 A/12,A/11 RICHU RICHU 16.1 7.8 18.5 2581 720 88 39 00 27 13 40 SF 240 0.13 0.23 0.46 234 414 826
11 SIKKIM EAST RIYONG 78 A/4 RIYONG RIYONG 46.4 11.2 29.7 2860 600 88 08 30 27 08 30 SF 120 0.37 0.66 1.31 334 590 1176
12 SIKKIM EAST VALI CHU 78 A/11 YALI CHU YALI 14.5 6.9 16.1 3267 1400 88-39-40 27-19-00 SF 240 0.12 0.21 0.41 211 373 745
13 SIKKIM NORTH BAKCHA CHU 78 A/11 BAKCHA CHU BAKCHA CHU 128.8 17.3 48.5 4250 1000 88-35-30 27-24-00 RF 240 1.02 1.80 3.59 1833 3238 6460
14 SIKKIM NORTH BURUM CHU 78 A/9 BURUM CHU BURUM 34.7 10.0 27.5 5668 2960 88-39-40 27-49-50 GF 40 0.28 0.49 0.98 83 147 294
15 SIKKIM NORTH CHAKUNG CHHU 78 A/10,11 CHAKUNG CHHU
TISTA 121.4 15.2 45.8 4470 1500 88-39-30 27-33-30 RF 600 0.96 1.70 3.38 4322 7635 15231
16 SIKKIM NORTH KALEP CHU 78 A/9 KALEP CHU KALEP 28.1 11.2 22.9 5200 1840 88-39-00 27-53-50 GF 160 0.23 0.40 0.80 271 479 955
17 SIKKIM NORTH KEONG CHU 78 A/11 KEONG CHU KEONG CHU 29.6 7.1 20.4 3400 980 88 34 00 27 24 50 SF 120 0.24 0.42 0.84 214 378 754
18 SIKKIM NORTH ONG CHHU 78 A/10 ONG CHHU TISTA 26.3 9.7 23 4550 1360 88-39-20 27-34-00 GF 600 0.21 0.37 0.75 952 1682 3355
19 SIKKIM NORTH PHYAM CHU 78 A /11 PHYAM CHU PHYAM CHU 15.9 7.4 17.5 3585 1360 88 39 00 27 24 00 SF 200 0.13 0.23 0.45 193 341 680
20 SIKKIM NORTH RABOM CHHU-I 78 A/10 RABOM CHHU TISTA 55.79 16.1 36.33 4990 2135 88-36-10 27-39-25 RF 440 0.45 0.79 1.57 1469 2595 5176
21 SIKKIM NORTH RABOM CHU-II 78 A/10 RABOM CHHU TISTA 51.12 14.27 33.16 5320 2135 88-37-10 27-40-00 RF 400 0.41 0.72 1.44 1225 2163 4316
22 SIKKIM NORTH RAHI CHHU-I 78 A/10 RAHI CHHU TISTA 58.4 15.6 34 4335 750 88-31-45 27-31-40 GF 320 0.47 0.82 1.64 1118 1974 3939
23 SIKKIM NORTH RAHI CHU-II 78 A/10 RAHI CHHU TISTA 54.4 12.9 29.9 4335 750 88-32-30 27-32-40 GF 480 0.43 0.77 1.53 1563 2761 5508
24 SIKKIM NORTH RAMAM CHHU 78 A/10 RAMAN CHHU TISTA 18 6.7 17.8 3165 990 88-35-15 27-32-10 RF 520 0.15 0.26 0.51 567 1002 1998
25 SIKKIM NORTH RANGRANG CHU 78 A/11 RANGRANG CHU
RANGRANG CHU 30.7 4 25.3 3698 640 88 31 00 27 26 00 SF 80 0.25 0.44 0.87 148 261 521
26 SIKKIM NORTH RIMBIKH 78 A/4 RIMBIKH RIMBIKH 77.6 13.8 35.9 3288 880 88 03 00 27 02 30 SF 80 0.62 1.09 2.17 370 654 1304
27 SIKKIM NORTH RINGYONG CHHU 78 A/6 RINGYONG CHHU
RANGYONG 38.3 9.8 25.8 4401 1085 88-26-30 27-33-40 RF 480 0.31 0.54 1.08 1104 1951 3892
28 SIKKIM NORTH RISHI 78A/8,A/4 RISHI RISHI 47.1 14.8 32.9 2850 421 88 12 30 27 11 00 SF 120 0.38 0.67 1.33 339 599 1194
29 SIKKIM NORTH RUN CHU 78A/11/7/6 RUN CHU RUN CHU 43.2 12.7 29.6 3501 720 88 24 50 27 27 30 SF 200 0.35 0.61 1.22 518 916 1827
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
2
S.No. STATE
DISTRICT CATCHMENT RTS
STM
BSN
A Sq Km
L Km
P Km
Zh m
Zl m
LON LAT FED HEAD
Dependable Discharge Power (kW)
90% 75% 50% 90% 75% 50%
30 SIKKIM NORTH TARUM CHHU-I 78 A/9,10 TARUM CHHU TISTA 71.1 10.4 35.9 5331 2100 88-35-10 27-41-15 RF 600 0.57 1.00 1.99 2546 4497 8972
31 SIKKIM NORTH TARUM CHHU-II 78 A/9,10 TARUM CHHU TISTA 62.5 12.5 32.5 5331 2100 88-36-30 27-42-00 RF 400 0.50 0.88 1.76 1494 2639 5265
32 SIKKIM NORTH YUMTHANG CHHU 78 A/9 YUMTHANG CHHU
YUMTHANG CHHU
184.8 22.5 62.9 5600 3395 88-42-30 27-47-30 GF 160 1.46 2.57 5.13 1746 3085 6155
33 SIKKIM NORTH SOUTH
RAMAN CHU 78 A/10 RAMAM CHU RAMAM 17.3 7.2 18.2 4318 990 88-36-00 27-36-00 GF 200 0.14 0.25 0.49 210 370 739
34 SIKKIM NORTH SOUTH
RANGPHAP CHU 78 A/7 RANGPHAP CHU
RANGPHAP CHU 37.3 8.7 24.2 3183 600 88 24 50 27 22 00 SF 40 0.30 0.53 1.05 90 158 316
35 SIKKIM SOUTH BANIA KHOLA 78 A/7 BANIA BANIA 17.6 5.9 16.9 2379 680 88 19 00 27 16 00 SF 200 0.14 0.25 0.50 213 377 752
36 SIKKIM SOUTH BARME CHU 78 A/7 BARME CHU BARME CHU 22.3 7.3 19.4 3202 1320 88 21 00 27 20 00 SF 240 0.18 0.32 0.63 323 571 1140
37 SIKKIM SOUTH BRUM KHOLA 78 A/7 BRUM BRUM 14 6.2 16.5 3000 440 88 24 00 27 18 00 SF 240 0.11 0.20 0.40 204 361 719
38 SIKKIM SOUTH KALEJ KHOLA 78 A/8 KALEJ KHOLA KALEJ 31.8 8.8 23.6 2640 320 88-24-40 27-09-55 SF 120 0.26 0.45 0.90 230 406 810
39 SIKKIM SOUTH KANAM 78A/8,A/12 KANAM KANAM 6.5 4.4 10.9 1430 400 88 29 00 27 08 00 RF 80 0.05 0.09 0.19 32 56 112
40 SIKKIM SOUTH KARSANGLA CHU 78 A/7 KARSANGLA CHU
KARSANGLA CHU
12 7.1 15.2 3183 1680 88 22 00 27 24 00 SF 160 0.10 0.17 0.34 117 206 412
41 SIKKIM SOUTH KAU KHOLA 78 A/7 KAU KAU 14.4 6.5 16.1 3080 520 88 25 00 27 20 20 SF 80 0.12 0.21 0.41 70 124 246
42 SIKKIM SOUTH LUNGDUNG CHU 78 A/7 LUNGDUNG CHU
LUNGDUNG CHU 7.6 5.8 12.7 2800 480 88 16 00 27 23 00 SF 200 0.06 0.11 0.22 93 164 327
43 SIKKIM SOUTH MANGZING 78 A/7 MANGZING MANGZING 7.4 5.1 11.5 2800 520 88 25 00 27 19 00 SF 280 0.06 0.11 0.21 127 224 447
44 SIKKIM SOUTH MANPUR KHOLA 78 A/8 MANPUR MANPUR 36.5 11.6 25.2 2240 240 88 20 30 27 06 00 SF 80 0.29 0.52 1.03 176 310 619
45 SIKKIM SOUTH ONG CHU 78 A/10 ONG CHU ONG 24.9 10.5 21.6 4450 1360 88-45-00 27-36-00 GF 280 0.20 0.35 0.71 421 743 1483
46 SIKKIM SOUTH PAYONG KHOLA 78A/7&A/8 PAYONG PAYONG 18.5 7.3 17.5 2320 520 88 19 00 27 14 00 SF 120 0.15 0.26 0.53 134 237 474
47 SIKKIM SOUTH PHKRAM CHHU 78 A/6 PHKRAM CHHU PHKRAM 15.8 7.5 17.1 4280 1280 88-25-00 27-34-00 GF 480 0.13 0.23 0.45 460 813 1621
48 SIKKIM SOUTH RANGIT CHU 78 A/11 RANGIT CHU RANGIT 36.3 11.3 25.3 4080 1600 88-25-00 27-20-20 GF 160 0.29 0.51 1.03 349 617 1230
49 SIKKIM SOUTH RANPO CHU 78 A/7 RANPO CHU RANPO CHU 39.4 12.4 29.3 2263 400 88 21 00 27 15 00 SF 80 0.32 0.56 1.11 189 334 667
50 SIKKIM SOUTH RAYE CHHU 78 A/10 RAYE CHHU RAYE 8.5 5.5 13.3 4200 1460 88-39-30 27-35-00 GF 50 0.07 0.12 0.24 26 46 91
51 SIKKIM SOUTH RINGPI CHHU 78A/8,A/7 RINGPI CHHU RINGPI CHHU 16.5 7.7 18.4 2415 440 88 18 00 27 14 00 SF 80 0.13 0.24 0.47 80 141 282
52 SIKKIM SOUTH RINGPI CHU 78 A/7,8 RINGPI CHU RINGPI 16.5 7.7 18.4 2415 440 88-26-00 27-15-50 SF 40 0.13 0.24 0.47 40 71 141
53 SIKKIM SOUTH SANGRUNG KHOLA 78 A/7 SANGRUNG SANGRUNG 11.6 6.8 15.7 2800 720 88 19 00 27 18 30 SF 200 0.09 0.17 0.33 141 249 498
54 SIKKIM SOUTH TIBIK CHHU 78 A/10 TIBIK CHHU TIBIK 15.5 8.0 17.2 4660 1860 88-42-00 27-35-10 GF 240 0.13 0.22 0.44 226 399 795
55 SIKKIM WEST KAYUM RANGIT 78 A/6,7 KAYUM RANGIT KAYUM RANGIT 97.5 16.8 42.2 5259 1634 88-22-00 27-25-10 RF 120 0.77 1.37 2.72 696 1229 2452
56 SIKKIM WEST MANPUR 78 A/8 MANPUR RANJIT R. 38.3 11.7 26 2255 873 88-21-30 27-06-10 RF 200 0.31 0.54 1.08 460 813 1622
57 SIKKIM WEST REL CHHU 78 A/7 REL CHHU REL CHU 69.4 18.2 38.6 4906 1376 88-18-00 27-23-40 RF 200 0.55 0.98 1.95 829 1464 2920
58 SIKKIM WEST RISHI CHHU-I 78 A/4,8 RISHI CHHU RANGIT R. 46.4 15.4 32.6 2850 421 88-18-30 26-13-40 RF 160 0.37 0.66 1.31 445 786 1569
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India
3
S.No. STATE
DISTRICT CATCHMENT RTS
STM
BSN
A Sq Km
L Km
P Km
Zh m
Zl m
LON LAT FED HEAD
Dependable Discharge Power (kW)
90% 75% 50% 90% 75% 50%
59 SIKKIM WEST RISHI CHHU-II 78 A/4,8 RISHI CHHU RANGIT R. 41.9 12.7 29.6 2850 421 88-17-50 27-12-50 RF 320 0.34 0.59 1.18 805 1422 2836
60 SIKKIM WEST ROATHOK 78A/8,A/4 ROATHOK ROATHOK 42.2 13.8 32.2 2850 360 88 11 00 27 09 00 SF 120 0.34 0.60 1.19 304 537 1071
61 SIKKIM WEST ROATHOK KHOLA 78 A/8 ROATHOK KHOLA
RANJIT R. 42.6 13.4 32.5 2850 342 88-18-00 27-10-05 RF 160 0.34 0.60 1.20 409 723 1441
32874 58076 115856
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project AHEC, DES, CRS & NIH, India
1
Tripura
S. NO.
STATE DISTRICT CATCHMENT RTS STM BSN A SqKm
L Km
P Km
Zh m
Zl m
LON LAT SF/GF/RF
HEAD Dependable Discharge Power
90% 75% 50% 90% 75% 50%
1 Tripura NORTH TRIPURA
BAGHAI CHHARA
83 D/4 BAGHAI CHHARA DEO NADI 30.6 11.50 27.50 176 40 92-06-30 24-10-45 RF 5 0.085 0.218 0.547 3.19 8.18 20.51
2 Tripura SOUTH TRIPURA
AMPI CHARA 79 M/10 AMPI CHARA SAN GANGA 41.9 17.60 31.40 293 100 91-38-20 23-40-40 RF 20 0.125 0.320 0.803 18.72 48.06 120.49
3 Tripura SOUTH TRIPURA
SONA CHHARA 79 M/10 SONA CHHARA GUMTI N. 40.7 15.50 31.00 117 30 91-37-30 23-33-15 RF 4 0.120 0.309 0.775 3.61 9.28 23.26
4 Tripura WEST TRIPURA
BURI GANG 79 M/8,9 BURI GANG BURI GANG 23.5 8.90 19.40 228 54 91-31-15 23-43-50 RF 20 0.061 0.158 0.396 9.22 23.69 59.39
5 Tripura WEST TRIPURA
GANGRAL CHHARA
79 M/6 GANGRAL CHHARA
BURI GANG 15.5 8.50 20.00 80 40 91-23-50 23-41-30 RF 3 0.037 0.095 0.238 0.83 2.14 5.35
6 Tripura WEST TRIPURA
GUNGRAI CHHARA
79 M/9 GUNGRAI CHHARA KHOWAI R. 17.4 11.50 21.00 164 30 91-37-00 23-57-20 RF 20 0.043 0.109 0.274 6.39 16.40 41.12
7 Tripura WEST TRIPURA
KAKRA CHHARA
79 M/9,10 KAKRA CHHARA KHOWAI R. 23.1 8.20 21.80 350 178 91-44-00 23-48-15 RF 20 0.060 0.155 0.388 9.03 23.19 58.15
8 Tripura WEST TRIPURA
MAHARANI CHHARA
79 M/9 MAHARANI CHHARA
KHOWAI R. 45.7 17.00 35.00 188 30 91-37-30 23-55-00 RF 8 0.139 0.356 0.893 8.33 21.38 53.60
9 Tripura WEST TRIPURA
SONAI CHHABRA
79 M/9 SONAI CHHABRA KHOWAI R. 31.2 13.50 25.50 120 35 91-39-00 23-54-00 RF 5 0.087 0.223 0.560 3.26 8.38 21.00
63 161 403
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India 1
West Bengal
S.NO. STATE DISTRICT CATCHMENT RTS STM BSN A SqKm
L Km
P Km
Zh m
Zl m
LON LAT FED HEAD Dependable Discharge Power (kW)
90% 75% 50% 90% 75% 50%
1 W.B. DARJEELING BAGORA 78 B/5 BAGORA BAGORA 33.6 8.4 23.5 2300 480 88 18 30 26 54 30 SF 120 0.270 0.476 0.950 242.57 428.53 854.88
2 W.B. DARJEELING BALASON 78 B/1 RONGBANG BALASAN 51.9 14.16 30.91 2355 88-13-00 26-54-00 RF 100 0.414 0.732 1.460 310.78 549.02 1095.25
3 W.B. DARJEELING BHIM 78N/4B/1B/5 BHIM BHIM 14.6 8.4 17.6 2440 880 88 12 30 27 00 40 RF 200 0.118 0.209 0.416 177.26 313.15 624.71
4 W.B. DARJEELING CHEL 78A/12, B/9 CHEL SUKHA CHEL SUKHA 18 9.1 21.6 1807 260 88 37 40 26 56 20 RF 60 0.145 0.257 0.512 65.41 115.56 230.53
5 W.B. DARJEELING DILPA 78 A/4 DILPA KHOLA DILPA KHOLA 14.2 5.2 25.8 3063 1600 88 04 30 27 02 00 SF 320 0.115 0.203 0.405 275.93 487.46 972.44
6 W.B. DARJEELING DUDHIA 78 B/1 DUDHIA DUDHIA 6.2 4.9 11.8 1267 280 88 12 20 26 51 00 SF 100 0.051 0.089 0.179 37.99 67.11 133.88
7 W.B. DARJEELING GIT-II 78 B/9 GIT KHOLA LETHI N. 22.58 6.02 22.33 1903 162 88-37-00 26-57-30 RF 40 0.182 0.321 0.641 54.57 96.41 192.32
8 W.B. DARJEELING GORKHE 78 A/4 RATO KHOLA KALI KHOLA 19.32 5.87 17.49 3596 2240 88-04-30 27-11-30 RF 100 0.156 0.275 0.549 116.93 206.57 412.09
9 W.B. DARJEELING GORUBATHAN JOG. 78 A/12 GORUBATHAN JOG.
GORUBATHAN JOG.
29.4 9.5 23.4 2489 560 88 41 20 27 05 10 SF 120 0.236 0.417 0.832 212.56 375.51 749.10
10 W.B. DARJEELING GURDUM 78 A/4 GURDUM GURDUM 16.4 6.5 17.2 3288 2020 88 30 00 27 05 00 SF 140 0.133 0.234 0.467 139.21 245.92 490.59
11 W.B. DARJEELING JHEPI 78 A/14 JHEPI KHOLA JHEPI KHOLA 19.8 11.1 18.9 2760 520 88 07 30 27 03 00 SF 100 0.160 0.282 0.563 119.80 211.65 422.21
12 W.B. DARJEELING JIT CHICHU 78 A/12 JIT CHICHU JIT CHICHU 21.2 7.9 19.7 1800 800 88 34 40 27 01 00 RF 120 0.171 0.302 0.602 153.81 271.73 542.08
13 W.B. DARJEELING KALI KHOLA 78 B/5 KALI KHOLA KALI 19.4 9.5 18.7 1694 150 88 24 00 26 53 50 SF 100 0.157 0.277 0.552 117.41 207.42 413.77
14 W.B. DARJEELING KUAPAN 78 A/12 KALI KALI 18.7 8 19.1 2200 560 88 39 20 27 02 00 SF 100 0.151 0.267 0.532 113.22 200.01 399.00
15 W.B. DARJEELING LADHOMA 78 A/4 LADHOMA LADHOMA 77.6 13.8 35.9 3288 880 88 03 00 27 02 30 SF 80 0.617 1.090 2.174 370.12 653.87 1304.40
16 W.B. DARJEELING LARING KHOLA 78 A/4 LARING KHOLA
LARING 12.7 7.3 16.3 2600 720 88 11 80 27 03 00 SF 80 0.103 0.182 0.363 61.77 109.12 217.69
17 W.B. DARJEELING LODHAMA DILPA 78 A/4 LODHAMA RANGBONG 70.12 7.98 32.43 3288 865 88-07-00 27-06-30 RF 240 0.558 0.986 1.967 1004.44 1774.46 3539.87
18 W.B. DARJEELING LOPCHU 78 A/8 LOPCHU LOPCHU 11.5 5.9 13.9 1977 280 88 21 30 27 03 00 RF 200 0.093 0.165 0.329 139.98 247.30 493.33
19 W.B. DARJEELING MAHANADI 78 B/5 MAHANADI MAHANADI 25.45 8.39 20.72 2219 88-22-00 26-52-00 RF 60 0.205 0.362 0.722 92.14 162.78 324.73
20 W.B. DARJEELING MANGPONG 78B/5 & B/9 MANGPONG MANGPONG 12.1 3.7 13.8 743 180 88 29 30 25 53 00 RF 40 0.098 0.173 0.346 29.44 52.01 103.76
21 W.B. DARJEELING MARMA NALA 78 B/1 MARMA MARMA 7 5.2 12.2 1700 680 88 10 00 26 52 00 RF 200 0.057 0.101 0.201 85.67 151.34 301.91
22 W.B. DARJEELING MECHI KHOLA 78 A/4 MECHI KHOLA MECHI KHOLA 3.2 3.7 9.5 3140 2000 88 03 00 27 09 00 SF 360 0.026 0.047 0.093 71.09 125.59 250.53
23 W.B. DARJEELING MIRIK 78 B/1 RANGBANG RANGBANG 53.3 15.9 33.9 2355 660 88 07 30 26 53 00 SF 200 0.425 0.752 1.499 638.14 1127.34 2248.94
24 W.B. DARJEELING NEORA 78A/4&A/8 NEORA NEORA 46.5 12 28.3 2249 500 88 12 00 27 00 30 SF 80 0.372 0.657 1.310 223.02 393.99 785.97
25 W.B. DARJEELING PABRINH KHOLA 78 B/9 PABRINH KHOLA
PABRINH 15.4 6.2 14.9 2000 440 88 31 30 26 57 00 SF 80 0.125 0.220 0.439 74.75 132.05 263.42
26 W.B. DARJEELING PACHIM 78B/1 & B/5 PACHIM PACHIM 13.2 8.8 19.6 2476 800 88 14 00 26 55 00 SF 160 0.107 0.189 0.377 128.35 226.75 452.34
27 W.B. DARJEELING PARBANG 78 A/4,8 NEORA KHOLA CHHOTA RANGIT
46.25 10.64 26.28 2349 600 88-13-30 27-04-30 RF 100 0.370 0.653 1.303 277.29 489.86 977.23
RTS - Reference Toposheet, STM - Stream, BSN - Basin, A - Area, L - Length, P - Perimeter, Zh - Highest Point, Zl - Lowest Point, LAT - Latitude, LON - Longitude
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS & NIH, India 2
S.NO. STATE DISTRICT CATCHMENT RTS STM BSN A SqKm
L Km
P Km
Zh m
Zl m
LON LAT FED HEAD Dependable Discharge Power (kW)
90% 75% 50% 90% 75% 50%
28 W.B. DARJEELING PARBU KHOLA 78B/5 & B/9 PARBU KHOLA PARBU KHOLA 15.5 7.6 16.5 1300 160 88 28 30 26 54 00 RF 60 0.125 0.221 0.442 56.42 99.67 198.84
29 W.B. DARJEELING PEDONG 78 A/12 MANDOM MANDOM 38.5 8.3 24 2000 600 88 34 50 27 06 00 RF 80 0.308 0.545 1.087 185.03 326.87 652.07
30 W.B. DARJEELING RAMTHI 78 B/9 RAMTHI KHOLA
RAMTHI KHOLA
21.3 11.4 21.8 1000 180 88 34 00 26 54 00 RF 40 0.172 0.303 0.605 51.51 91.00 181.54
31 W.B. DARJEELING RANGMUK 78B/1 & B/5 RANGMUK RANGMUK 29.6 9.7 23.2 2615 798 88 13 00 27 57 00 SF 80 0.238 0.420 0.838 142.66 252.02 502.76
32 W.B. DARJEELING RANGNU 78 A/8 RANGNU RANGNU 25 9.6 21.6 1977 240 88 20 30 27 00 30 RF 160 0.201 0.355 0.709 241.42 426.49 850.81
33 W.B. DARJEELING RANGNU 78 A/8 RANGNU KHOLA
RANGIT R. 44.58 10.95 27.27 2398 260 88-19-00 27-05-00 RF 160 0.357 0.630 1.256 427.81 755.78 1507.71
34 W.B. DARJEELING RAYENG 78 B/5 RAYENG TISTA R. 49.12 8.83 27.56 2435 200 88-22-30 26-57-30 RF 60 0.392 0.693 1.383 176.58 311.95 622.32
35 W.B. DARJEELING RILLI 78 A/12 RILLI RILLI 24.3 10.8 23.7 2371 789 88 34 30 27 04 10 SF 40 0.196 0.346 0.689 58.68 103.67 206.81
36 W.B. DARJEELING RISHI 78A/8 & A/4 RISHI RISHI 44.9 14.8 32.8 2700 400 88 10 30 27 11 00 SF 160 0.359 0.634 1.265 430.85 761.15 1518.42
37 W.B. DARJEELING RITHU KHOLA 78 A/4 RITHU KHOLA RITHU KHOLA 9.7 10.3 12.5 3288 1800 88 01 00 27 04 00 SF 340 0.079 0.139 0.278 201.09 355.26 708.70
38 W.B. DARJEELING RONGDONG 78A/8,B/5 RONGDONG RONGDONG 65.1 16.9 35.5 2600 240 88 15 20 26 59 50 SF 40 0.518 0.916 1.827 155.55 274.79 548.18
39 W.B. DARJEELING ROTO KHOLA 78 A/4 ROTO KHOLA ROTO KHOLA 18.8 6.5 17.9 3596 2880 88 10 00 27 10 00 SF 120 0.152 0.268 0.535 136.58 241.28 481.34
40 W.B. DARJEELING SANGMA 78 B/1 PULUNGDUNG PLUNGDUNG 13.7 5.5 15.5 2300 800 88 09 30 26 57 00 SF 160 0.111 0.196 0.391 133.16 235.24 469.28
41 W.B. DARJEELING SHIRI KHOLA 78 A/4 SHIRI SHIRI 59.3 14.1 32.8 3631 1440 87 59 40 27 05 10 SF 360 0.473 0.835 1.666 1276.48 2255.05 4498.60
42 W.B. DARJEELING SINDE BONG 78 A/12 RILLI RILLI 14.2 5.3 16 2106 789 88 33 00 27 04 20 SF 40 0.115 0.203 0.405 34.49 60.93 121.56
43 W.B. DARJEELING SITONG 78 B/5 JHOLI KHOLA JHOLI KHOLA 7.9 4.3 11 1964 400 88 23 00 26 53 00 RF 60 0.064 0.114 0.227 28.97 51.17 102.08
44 W.B. DARJEELING TAKLING 78 A/8 GIEL KHOLA TISTA R. 21.56 7.54 19.05 1977 220 88-25-00 27-01-30 RF 120 0.174 0.307 0.612 156.40 276.30 551.18
45 W.B. DARJEELING TANGLU 78 A/4 SHIRI KHOLA SHIRI KHOLA 15.3 6.5 15.9 3063 1420 88 05 00 26 55 50 SF 360 0.124 0.219 0.436 334.20 590.40 1177.79
46 W.B. DARJEELING TINDHARIA G.B. 78 B/5 SIVA KHOLA SIVA KHOLA 21.8 8.8 21.8 2000 300 88 18 00 26 50 00 RF 80 0.176 0.310 0.619 105.41 186.23 371.50
47 W.B. DARJEELING TIRPAI BAZAR 78 A/4 TIRPAI BAZAR TIRPAI BAZAR 4.5 3.7 9.4 1320 400 88 27 00 27 03 00 RF 320 0.037 0.065 0.130 88.53 156.41 312.02
Annexure 1 : Cluster Maps of SHP Potential Sites
"'....
cD,§Q)'"'".0Q)m.~05-a.'"
i
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS& NIH, India
Name of State Sheet NO.
1. Jammu& Kashmir 1
2. HimachalPradesh 2
3. UttarPradesh!Uttaranchal 3
4. Bihar! Jharkhand 4
5. ArunachalPradesh 5
6. Assam 6
7. Manipur 7 ....-
8. Meghalaya 8
9. Mizoram 9
10. Nagaland 10
11. Sikkim 11
12. Tripura 12
13. West Bengal 13 1--!':-
N
L E G E N D
Potential SmallHydro SitesCity and TownsInternational BoundaryState BoundaryDistrict BoundaryDrainageRoad
JAMMU AND KASHMIR
0 85 kmS C A L E
94°22°
UNDP-GEF Hilly HydroProject, MNES
JAMMU AND KASHMIR STATE
Zonal Plan -Identified Potential Sites
National Consultants :Alternate Hydro Energy CentreUniversity of Roorkeewith
Department of Earth SciencesCentre for Remote Sensing(Deptt. of Civil Engineering)andNational Institute of Hydrology,Roorkee
File : C-101 July 2001 Roorkee
Yasin
Gupis
Barsat Gakuch
Atabad
Gilgit
ChilasGurikota
Kushumul
Dou
Muzaffarabad
Baramula
Kaksar
Biagdang
Donlkhar
Diskit
Kataklik
SaspolLeh
Chushot
Jarapa
GyaBardangompa
Numa
Kyangtam
Kathua
Jammu
Udhampur
Riasi
Mirpur
Punch
SRINAGAR
Anantnag
Barma
Burtsa Tang
73° 74° 75° 76° 77° 78° 79° 80° 81°
33°
33°
34°
34°
35°
35°
36°
37°37°
73° 74° 75° 76° 77° 78° 79° 80° 81°
C H I N A
C H I N A
P A K I S T A N
H I M A C H A L P R A D E S H
N
Satluj R.
Chenab
R.
Pabar
76° 77° 78° 79°
33°
32°
31°
79°78°77°76°
31°
32°
33°
Chamba
Dharamshala
Jogindernagar
HamirpurMandi
Kullu
Kaja
Kalpa
SanglaRampur
SHIMLA
KarsogBilaspur
Una
Kyelang
Khoksar
Solan
Nahan
0 25 km
S C A L E
L E G E N D
Potential Small Hydro SitesCity and TownsInternational BoundaryState BoundaryDistrict BoundaryDrainageRoadRailway Line
94°22°
UNDP-GEF Hilly HydroProject, MNES
HIMACHAL PRADESH
Zonal Plan -Identified Potential Sites
National Consultants :Alternate Hydro Energy CentreUniversity of RoorkeewithDepartment of Earth SciencesCentre for Remote Sensing(Deptt. of Civil Engineering)andNational Institute of Hydrology,Roorkee
File : C-101 July 2001 Roorkee
HIMACHAL PRADESH J A M MU & K A S H M I R
C H I N A
U T T A R A N C H A L
P U N J A B
Supin R.
Tons
R.
Yam
una
R.
Bhagirath
iR
.
Ala
knanda
R.
Dhaulig
anga
R.
Gorig
anga
R.
Ramganga
R.
Dhauli.g
anga
R.
Dehradun
Rishikesh
Roorkee
N
80°79°78°77°
80° 81°
81°
79°77°
29°
30°
31°
29°
30°
31°
Yamunotri
Gangotri
UttarkashiTrijugi
Badrinath
Joshimath
Gopeshwar
Dehradun
NarendranagarPauri
Hardwar
Roorkee
Ranikhet
Rishikesh
Muzzafarnagar
Meerut
Bijnor
Moradabad
Rampur
Nainital
AlmoraPithoragarh
Saharanpur
UTTARANCHALANDUTTAR PRADESH
0 30 60 kmS C A L E
L E G E N D
Potential SmallHydro SitesCity and TownsInternational boundaryState BoundaryDistrict BoundaryDrainageRoadRailway Line
81°
U T T A R P R A D E S H
U T T A R A N C H A L
C H I N A
N E P A L
H I M A C H A LP R A D E S H
H A R Y A N A
UNDP-GEF Hilly HydroProject, MNES
Zonal Plan -Identified Potential Sites
National Consultants :Alternate Hydro Energy CentreUniversity of RoorkeewithDepartment of Earth SciencesCentre for Remote Sensing(Deptt. of Civil Engineering)andNational Institute of Hydrology,Roorkee
File : C-101 July2001 Roorkee
UTTARANCHAL & UTTAR PRADESH
84° 85°
25°
Bettiah
Supaul
Gaya
Ara
Hazaribad
RANCHI
Dumka
Chaibasa
Gopalganj
Siwan
Motihari
Muzaffarpur
Madhubani
Dharbhanga
Samastipur Saharsa
BegusaraiMunger
Bihar Sharif
Hajipur
PATNA
Chhapra
Sasaram
Aurangabad
Nawada
Dhanbad
Bhagalpur
DaltenganjGiridih
Kishanganj
Purnia
Katihar
J H A R K H A N D
B I H A R
N
84° 85°
86°
86°
87°
87°
88°
88°
27°
26° 26°
25°
24° 24°
23°
22°
23°
22°S C A L E
0 25 50 km
L E G E N D
Potential SmallHydro SitesCity and TownsInternational BoundaryState BoundaryDistrict BoundaryDrainageRoadRailway Line
BIHARANDJHARKHAND
95°
L E G E N D
Potential SmallHydro SitesCity and TownsState BoundaryDistrict BoundaryDrainageRoad
UNDP-GEF Hilly HydroProject, MNES
BIHAR STATE & JHARKHAND
Zonal Plan -Identified Potential Sites
National Consultants :Alternate Hydro Energy CentreUniversity of RoorkeewithDepartment of Earth SciencesCentre for Remote Sensing(Deptt. of Civil Engineering)andNational Institute of Hydrology,Roorkee
File : C-101 July 2001 Roorkee
N E P A L
W E S T B E N G A L
W E S TB E N G A L
U T T A RP R A D E S H
M A D H Y AP R A D E S H
O R I S S A
N
92° 93° 94° 95° 97°
93°92° 94° 95° 96° 97°
29°29°
28°
27° 27°
S C A L E0 25 km
L E G E N D
Potential SmallHydro SitesCity and TownsInternational BoundaryState BoundaryDistrict BoundaryDrainageRoad
ARUNACHAL PRADESH
UNDP-GEF Hilly HydroProject, MNES
ARUNACHAL PRADESH
Zonal Plan -Identified Potential Sites
National Consultants :Alternate Hydro Energy CentreUniversity of RoorkeewithDepartment of Earth SciencesCentre for Remote Sensing(Deptt. of Civil Engineering)andNational Institute of Hydrology,Roorkee
File : C-101 July 2001 Roorkee
Bomdila
Seppa
ITANAGAR
Ziro
Daporiji
Khonsa
Karimgaon Tezu
Pasighat
Anini
A S S A M
N A G A L A N D
M Y A N M A R
C H I N A
C H I N A
B H U T A N
Tinsukia
Jorhat
Marigaor
Haflong
Karimganj
Barpeta
NH
52
NH 36
NH
39
NH 52
NH 37
BrahamaputraR.
BurhiDihing R.
Kokrajhar Nalbari
GUWAHATIGoalpara Dispur
Mangaldai
Nagaon
TezpurGolaghat
Sibsagar
NorthLakhimpur
Dibrugarh
Dhemaji
Chapakhowa
Diphu
Silchar
Hailakandi
Dhuburi
N
S C A L E0 45 km
25°
26°
27°
28°
96°95°94°93°92°91°90°
28°
27°
26°
90° 91° 92° 93° 94° 95° 96°
25°
L E G E N D
Potential SmallHydro SitesCity and TownsInternational BoundaryState BoundaryDistrict BoundaryDrainageRoad
UNDP-GEF Hilly HydroProject, MNES
ASSAM STATE
Zonal Plan -Identified Potential Sites
National Consultants :Alternate Hydro Energy CentreUniversity of RoorkeewithDepartment of Earth SciencesCentre for Remote Sensing(Deptt. of Civil Engineering)andNational Institute of Hydrology,Roorkee
File : C-101 July 2001 Roorkee
ASSAM
B H U T A N
A R U N A C H A L P R A D E S H
N A G A L A N D
M A N I P U R
M I Z O R A MT R I P U R A
B A N G L A D E S H
M E G H A L A Y A
WESTBENGAL
24°
25°
NH
39
NH 53
NH39
Ther
R.
Laniy
eR
.
Iril R
.
Makr
uR
.
Irvi
ngR
.
Bun
akR
.
Tuivai R.
ImphalR
.
TuyungbiR
.
N
Moirang
0 25 km
S C A L E
95°
L E G E N D
Potential SmallHydro SitesCity and TownsState BoundaryDistrict BoundaryDrainageRoad
UNDP-GEF Hilly HydroProject, MNES
MANIPUR STATE
Zonal Plan -Identified Potential Sites
National Consultants :Alternate Hydro Energy CentreUniversity of RoorkeewithDepartment of Earth SciencesCentre for Remote Sensing(Deptt. of Civil Engineering)andNational Institute of Hydrology,Roorkee
File : C-101 July 2001 Roorkee
L E G E N D
Potential SmallHydro SitesCity and TownsInternational BoundaryState BoundaryDistrict BoundaryDrainageRoad
Tadubi
Chingai
Karong
Tamei
Kangpokpi Ukhrul
SaikulTamenglong
IMPHAL
NungbaBishnupur
Thoubal
Henglep Kakehing
Tengnoupal
KasomKhullen
Phungyar
Kamjong
Tousem
Jiribam
Thanlon
Hmongzungkai
Thinghat
ChuraChandpur
Chakpikarong
Chandel
24°
94°
94°
93°
93°
24°
MANIPUR
M A Y A N M A R
M A Y A N M A R
N A G A L A N D
A S S A M
M I Z O R A M
TURA
WILLIAM NAGAR
NONGSTOIN
SHILLONG
JOWAI
NH
51 KRIS
HNAI N
H40
NH
40
JADUKATA
B A N G L A D E S H
N90° 91° 92°
92°91°90°
26°26°
25°25°
0 25 km
S C A L E
MEGHALAYA
95°
L E G E N D
Potential SmallHydro SitesCity and TownsState BoundaryDistrict BoundaryDrainageRoad
UNDP-GEF Hilly HydroProject, MNES
MEGHALAYA STATE
Zonal Plan -Identified Potential Sites
National Consultants :Alternate Hydro Energy CentreUniversity of RoorkeewithDepartment of Earth SciencesCentre for Remote Sensing(Deptt. of Civil Engineering)andNational Institute of Hydrology,Roorkee
File : C-101 July 2001 Roorkee
B A N G L A D E S H
A S S A M
M A N I P U R
L E G E N D
Potential SmallHydro SitesCity and TownsInternational BoundaryState BoundaryDistrict BoundaryDrainageRoad
Dhale
sw
ari
Cu
tur
Phaira
ng
NH
54
Lunglei
AIZAWL
Tu
wa
wi
Champhai
NH 54
Lawnglai
Saiha
Tlabung
Kolasib
Mamit
N
24°
23°
22° 22°
92° 93°
23°
24°
92°
MIZORAM
94°22°
UNDP-GEF Hilly HydroProject, MNES
MIZORAM STATE
Zonal Plan -Identified Potential Sites
National Consultants :Alternate Hydro Energy CentreUniversity of RoorkeewithDepartment of Earth SciencesCentre for Remote Sensing(Deptt. of Civil Engineering)andNational Institute of Hydrology,Roorkee
File : C-101 July 2001 Roorkee
S C A L E0 16 32 km
L E G E N D
Potential SmallHydro SitesCity and TownsInternational BoundaryState BoundaryDistrict BoundaryDrainageRoad
M A N I P U R
T R I P U R A
M Y A N A M A R
B A N G L A D E S H
Diy
ung
R.
N
27°27°
26°26°
94°
94° 95°
95°
NAGALAND
S C A L E0 25 km
L E G E N D
Potential SmallHydro SitesCity and TownsInternational BoundaryState BoundaryDistrict BoundaryDrainageRoad
Mon
Mokochung
Tuensang
Wokha
Zunheboto
KOHIMA
Phek
M Y A N M A R(BURMA)
A R U N A C H A LP R A D E S H
A S S A M
M A N I P U R
93°
93°
95°
L E G E N D
Potential SmallHydro SitesCity and TownsState BoundaryDistrict BoundaryDrainageRoad
UNDP-GEF Hilly HydroProject, MNES
NAGALAND STATE
Zonal Plan -Identified Potential Sites
National Consultants :Alternate Hydro Energy CentreUniversity of RoorkeewithDepartment of Earth SciencesCentre for Remote Sensing(Deptt. of Civil Engineering)andNational Institute of Hydrology,Roorkee
File : C-101 July 2001 Roorkee
Kunchenjunga LachenMonastery
KodyongMangan
Dikchu
Lingi
Dhupidanda
Yaksam
Gezing
DentamUttare
Bhareng
Mayong
Soreng Namchi
Sombare
NayaBazar
Manjhitar Sumbuk
Melli Bazar
Namthang
TemiDamthang
RabangMangkha
Yagang
GANGTOK
Pakyong
Bhasme
Bara Pathing
Machong
Rangli
Pademchen
Lungthung
Kupup
Chhanggu Natula
Shampung
Chhombo Chhu
TistaR
.
Tista
R.
Tis
taR
.
Great Rancit R.
Dongky
aC
hhu
Rangit
R.
Rhenok
88° 10'
88° 10'
88° 20'
88° 20'
88° 30'
88° 30'
88° 40'
88° 40'
88° 50'
88° 50'
27°27°
27° 27°
27° 27°
27° 27°
27°
27°
27°
27°
60' 60'
50' 50'
40' 40'
20'
10'
00'
30' 30'
10'
S C A L E0 4.25 8.5 km
SIKKIM
L E G E N D
Potential SmallHydro SitesCity and TownsInternational BoundriesState BoundaryDrainageRoad
94°
22°
UNDP-GEF Hilly HydroProject, MNES
SIKKIM STATE
Zonal Plan -Identified Potential Sites
National Consultants :Alternate Hydro Energy CentreUniversity of Roorkeewith
Department of Earth SciencesCentre for Remote Sensing(Deptt. of Civil Engineering)andNational Institute of Hydrology,Roorkee
File : C-101 July 2001 Roorkee
C H I N A
C H I N A
N E P A L
W E S T B E N G A L
AGARTALA
Khowai
NH 44
NH
44
Gumti R.
Deo
R.
N
Sabruin
Belonia
Amarpur
Sonamura
Udaipur
Gunamanipara
Kamalpur
Kumarghat
Kailashahar
Dharmanagar
S C A L E0 15 km
L E G E N D
Potential SmallHydro SitesCity and TownsInternational BoundaryState BoundaryDistrict BoundaryDrainageRoad
23°
24°
91°92°
92°91°
23°
24°
TRIPURA
UNDP-GEF Hilly HydroProject, MNES
TRIPURA STATE
Zonal Plan -Identified Potential Sites
National Consultants :Alternate Hydro Energy CentreUniversity of RoorkeewithDepartment of Earth SciencesCentre for Remote Sensing(Deptt. of Civil Engineering)andNational Institute of Hydrology,Roorkee
File : C-101 July 2001 Roorkee
M I Z O R A M
B A N G L A D E S H
B A N G L A D E S H
B A N G L A D E S H
Darjiling
TufanGanj
Raiganj
Balurghat
Jangipur
Lalbag
Baharampur
Siuri
Asansol
Puruliya
Bishnupur
Arambag
Bankura
JhargramHawrah
Kolkata
Kanthi
TistaR.
GangaR.
Ganga R.
Hugli R
.
Kalimpong
Siliguri
Jalpaiguri Alipur Duar
Matabhanga
Koch Bihar
DinhataMekhliganj
Islampur
IngrajBazar
RampurHat
Kandi
Katoya
Krishnanagar
BardmanRanaghat
Bangaon
ChunchuraChandannagar
Barakpur
AlipurUlubariyaTamluk
Medinipur
Ghatal
DiamondHarbour
87°86° 89°88° 90°
87° 88° 89° 90°
27°
24°
25°
26°
22°
23° 23°
22°
24°
25°
26°
27°
WEST BENGAL
0 50 kmS C A L E
N
UNDP-GEF Hilly HydroProject, MNES
WEST BENGAL STATE
Zonal Plan -Identified Potential Sites
National Consultants :Alternate Hydro Energy CentreUniversity of RoorkeewithDepartment of Earth SciencesCentre for Remote Sensing(Deptt. of Civil Engineering)andNational Institute of Hydrology,Roorkee
File : C-101 July 2001 Roorkee
L E G E N D
Potential SmallHydro SitesCity and TownsInternational BoundaryCoast LineState BoundaryDistrict BoundaryDrainageRoadRailway Line
Special ReferenceKoch Bihar (W.B)Rangpur(bangladesh)
S I K K I M
B H U T A N
ASSAM
B A N G L A D E S H
B A N G L A D E S H
B I H A R
J H A R K H A N D
BAY OF BENGAL
Team
Alternate Hydro Energy Centre
1.2.3.4.5.
Dr. J.D. Sharma
Mr. Arun Kumar (Coordinator)Mr. S.N. SinghDr. S.P. SinghMr. M.K. Singhal
Department of Earth Sciences
1.2.3.4.5.
Dr. A.K. Jain
Dr. H. Sinvhal (Convener)Dr. V.N. SinghDr. A.K. SarafDr. S. Singh
Civil Engineering Department
1.2.3.
Dr. PK PandeDr. RS. Tiwari (Convener)Dr. PK Garg
National Institute of Hydrology
1.2.3.
Shri RD. SinghShri Hemant ChaudharyDr. S.K. Mishra
Supported with
1.2.3.4.5.
Dr. Tarun K. RaghuvanshiShri Naveen KanwarShri RK. BhatiaShri RK. SinghalShri Sanjay K. Sharma
UNDP-GEF Hilly Hydro Project-Zonal Plan AHEC, DES, CRS& NIH, India