KIB · PDF fileInsulation dimensioning ... Piping design . Seite 15 WWV/ KIP Overview drawing...

Post on 06-Feb-2018

237 views 1 download

transcript

Seite 1 WWV/ KIP

Presentation

KIB – GmbH

Seite 2 WWV/ KIP

KIB GmbH

Kirchenbauer Ingenieur Büro GmbH

Siemensstr. 1

D- 85716 Unterschleißheim

Markus Kirchenbauer, Dipl.-Ing. (FH)

Managing Director

Fon: +49(0)89-726310110

Fax: +49(0)89-726310163

Email: info@kib-gmbh.de

Web: www.kib-gmbh.de

Foundation: 1999

Seite 3 WWV/ KIP

The KIB- GmbH was founded in 1999.

In all areas of plant design all engineering services from basic to detail

engineering of site arrangement, pipe and steelwork engineering will be

provided.

Our experience from numerous national and international projects and the

various tasks, we can pass on to our customers in the form of individual

problem and customer-oriented solutions.

In the design and calculation as well as in site service, we assure you

targeted finding solutions and unrivalled expertise.

A powerful team combines innovative solutions with customer-specific

requirements.

Seite 4 WWV/ KIP

Seite 5 WWV/ KIP

Fields of activity

Conceptual design

Process engineering

Arrangement design

Pipe design

Air channel design

Calculation

Steel construction

Construction-design services

Seite 6 WWV/ KIP

Areas of activity

Power plant technology

Exhaust cleaning systems

Petrochemicals

Tank farms

Pipeline pumping stations

Seite 7 WWV/ KIP

Staff

Project/Team Manager 5

Calculator 7

CAD Designers 20

PDMS Administrative 5

Organization 2

Experience

Design and construction experience for more than 15 years

Seite 8 WWV/ KIP

Conceptual design

Implementation of requirement analysis

Development of sound design fundamentals

Creation of process flow sheets

Conceptual arrangement design

Fixing of routing areas

Seite 9 WWV/ KIP

Dimensioning of aggregates

Pipe dimensioning

Lost pressure calculation

Insulation dimensioning

Creation of equipment schemes

Process engineering

Seite 10 WWV/ KIP

3D Equipment arrangement,

2D Layout drawings

Arrangement design

Seite 11 WWV/ KIP

3D – Equipment arrangement

Seite 12 WWV/ KIP

2D - Arrangement drawings

Seite 13 WWV/ KIP

Focus 2D - Arrangement

Seite 14 WWV/ KIP

Basic design

Detail design

Support design

Pipe overview drawings

Detail isometrics

Piping design

Seite 15 WWV/ KIP

Overview drawing

Seite 16 WWV/ KIP

Excerpt pipe plan

Seite 17 WWV/ KIP

Fabrication detail isometric

Seite 18 WWV/ KIP

Air- and exhaust channel design

Detailed design in 3D - model

Output of 2D - fabrication

drawings

Seite 19 WWV/ KIP

Air channel production drawings

Seite 20 WWV/ KIP

3D Detailed platform design

3D Secundary support steel design

2D Fabrication drawings

Steel constructions

Seite 21 WWV/ KIP

3D detailed platform design

Seite 22 WWV/ KIP

Support structure design

Seite 23 WWV/ KIP

Detailed support design

Seite 24 WWV/ KIP

Support steel fabrication drawing

Seite 25 WWV/ KIP

Support steelwork fabrication drawing

Seite 26 WWV/ KIP

Steelwork fabrication drawing of platforms

Seite 27 WWV/ KIP

Steel construction fabrication drawing

Seite 28 WWV/ KIP

CAD/CAE-PROGRAMS

AVEVA PDMS 3D

AUTODESK ACAD 2/3D

BENTLEY Microstation

AUTODESK Inventor

BENTLEY Pro Steel

Seite 29 WWV/ KIP

Calculation

Pipe structure of HP, MP and LP systems

technical interpretation of HP, MP and LP

components FEM calculation

pressure test definition

dimensioning of components

creating pipe classes according to EN13480,

FDBR, ISO14692 and ASME

R-Stab calculation, structural analysis

program for planer and spatial frameworks

Seite 30 WWV/ KIP

Calculation programs

SIGMA Rohr2

ANSYS

DLUBAL R-Stab

Seite 31 WWV/ KIP

Site support

Construction and site support

As-Built-Documentation

3D Laserscanning

Seite 32 WWV/ KIP

Satisfied customers

Schmidt + Clemens

Seite 33 WWV/ KIP

Operator: Großkraftwerk Mannheim

Customer: WWV–Wärmeverwertung

Typ: Steam generators

Period: 2010-2013

Services:

• MP/LP design

• Basic Engineering

• Detail Engineering

• Pipe stress analysis

• 1.300 pipes

GKM 9

Seite 34 WWV/ KIP

Operator: ENBW

Customer: WWV – Wärmeverwertung

Typ: Steam generators

Period: 2009 - 2012

Services:

• HP design small pipes

• Pipe stress analysis

• Support steel work

RDK 8

Seite 35 WWV/ KIP

Operator: RWE Power

Customer: Kurotec

Typ: Steam generators

Period: 2009 - 2012

Services:

• Pipe design main cooling water pipes

• DN 200 – DN 3600

• GFK

• Pipe stress analysis

• FEM calculation

Eemshaven

Seite 36 WWV/ KIP

Operator: EVN

Customer: EVN Umwelt

Typ: Incineration plant

Period: 2004 - 2006

Services:

• Pipe design of all systems

• Arrangement design

• Pipe stress analysis HP, MP – and LP Systems

• Design coordination

MSZ3 Moskau

Seite 37 WWV/ KIP

Operator: Flachstahlwerke Salzgitter

Customer: VAM – Wels

Typ: Gaskraftwerk

Period: 2007 - 2009

Sevices:

• Pipe design of all systems

• Basic – und Detailengineering

• Arrangement design

• Pipe stress analysis HP, MP- and LP systems

• Support design

Salzgitter

Seite 38 WWV/ KIP

Operator: EON

Customer: FISIA Babcock Environment GmbH

Typ: Steam generators

Period: 2011

Services:

• Bracket- and support design

Maasvlakte

Seite 39 WWV/ KIP

Operator: Lenzing AG

Customer: Lenzing AG

Typ: Fiber production plant

Period: 2012 - 2013

Services:

• Pipe design of all systems 2.700 pieces

• Basic – and Detailengineering

• FEM-Calculation

• Pipe stress analysis

• Support design

LENZING AG

67KT