7/23/2019 LCT One Dornbirn
1/4
1436 2012 12
Mit 26 m Hhe und schimmernder Alumini-
umfassade ist der LifeCycle Tower One in
Dornbirn schon auf den ersten Blick kein ty-pischer Holzbau. Der achtgeschossige Holz-
Hybrid-Bau ist der Prototyp einer in interdis-
ziplinrer Forschungsarbeit entwickelten
Systembauweise, die bis zu 20 Etagen er-
mglicht. Vorgefertigte Fassadenelemente
und Verbundgeschossdecken bilden das
modulare System, ergnzt um den ausstei-
fenden Treppenhauskern aus Ortbeton. Als
hybride Konstruktion optimiert die neuartige
Verbundrippendecke aus Holz und Beton
den Materialeinsatz. Die 2,70 8,10 m gro-
en Elemente bestehen aus einer 8 cm di-
cken Stahlbetonauflage als Druckplatte, die
Verwaltungsgebude in Dornbirn
Administrat ive Building in Dornbirn
Architekten:
Hermann Kaufmann Architekten,Schwarzach
Mitarbeiter:
Christoph Dnser (Projektleiter), Benjamin
Baumgartl, Guillaume E. Weiss, Stefan
Hiebeler, Michael Laubender
Tragwerksplaner:
Merz Kley Partner, Dornbirn
zugleich dem Schall- und Brandschutz dient,
und Brettschichtholzbalken (24 28 cm) als
Unterzge. Synergien nutzen auch die Fas-sadenelemente, die ausgenommen der
Alu-Verkleidung komplett mit Verglasung
und Sttzen vorgefertigt wurden und die
Montagezeit wesentlich verkrzten. Alle
Sttzen haben einheitlichen Querschnitt
(24 24 cm). Als Doppelsttzen nehmen sie
in Fassadenebene an den Modulsten je-
weils ein Deckenelement auf. Stahldorne am
Sttzenkopf verbinden die Module. Das Ge-
bude wird zusammengesteckt und die
Fugen anschlieend mit Beton verfllt. Die
Deckenelemente werden so zur aussteifen-
den Scheibe, die als nicht brennbare Schicht
die Geschosse trennt. Der LCT One ist
das derzeit hchste Gebude, bei dem Holz
in tragenden Bauteilen ungekapselt, d. h.nicht brandschutzverkleidet ist. So strukturie-
ren die Sttzen und Trger die lichtdurchflu-
teten Rume, die unbehandelten Holzober-
flchen kontrastieren mit den Deckenpanee-
len aus Stahlblech. Passgenau zwischen den
Holzbalken eingesetzt, verbergen sie die Ins-
tallationen und dienen als Heiz- bzw. Khlde-
cken. Nicht zuletzt ist auch die Nutzung des
Gebudes hybrid: Dank des Fassadenras-
ters von 2,70 m und groer Spannweite sind
die Etagen frei unterteilbar und eignen sich
fr Groraum- oder Zellenbros ebenso wie
fr Wohnungen und Hotelzimmer.
Fotos:Cree GmbH
7/23/2019 LCT One Dornbirn
2/4
2012 12 Dokumentation 1437
6
5
3
3
2 1
4
bb
a
a
1 Eingang2 Foyer3 Technik4 Versorgungs- schacht5 Ausstellung6 Broflche
LageplanMastab 1:3000Grundrisse Schnitte
Mastab 1:400
Site planscale 1:3000Floor plans Sections
scale 1:400
Regelgeschoss /Standard floor
bbaa
1. Obergeschoss /First floor
Erdgeschoss /Ground floor
With a height of 26 metres and a shimmering
aluminium facade, the Lifecycle Tower in
Dornbirn does not have the typical appear-ance of a wooden structure. This eight-storey
timber hybrid building is the prototype of a
form of construction created in interdiscipli-
nary research work. The modular system can
be employed for developments up to 20 sto-
reys in height and consists of prefabricated
facade elements and composite intermediate
floors, complemented by an insitu concrete
staircase core with a bracing function.
The use of materials is optimized by the hybrid
form of construction of the new composite
ribbed floors in timber and concrete. The 2.70
8.10 m elements consist of an 8 cm com-
pression topping layer in reinforced concrete
(which also serves the needs of sound insula-
tion and fire protection) and 24 28 cm lami-nated timber downstand beams.
Synergetic concepts are also exploited in the
facade elements, which (apart from the alu-
minium cladding) were prefabricated com-
plete with glazing and columns, thereby con-
siderably reducing the assembly time.
All columns have a uniform 24 24 cm cross-
section and occur in pairs at the junctions be-
tween modules in the facade plane, each one
bearing a floor element. The modules are con-
nected by steel pins at the heads of the col-
umns, and the joints were ultimately filled with
concrete. The floor elements function as brac-
ing slabs that form non-combustible layers
separating the individual storeys.
The Lifecycle Tower is at present the tallestbuilding in which exposed timber is used as a
load-bearing part of the construction; i.e. not
clad to provide fire protection. The columns
and beams articulate the light-filled rooms,
their untreated wooden surfaces forming an
attractive contrast to the sheet-steel ceiling
panels, which conceal the service installations
and act as heating/cooling soffits. The build-
ing also has a potentially hybrid use: thanks to
the 2.70-metre facade grid and the large
spans, the storeys are freely divisible and can
be used for open-plan and cellular office lay-
outs, as well as for dwellings and hotel rooms.
1 Entrance2 Foyer3 Mechanical
services4 Services shaft5 Exhibition6 Office area
7/23/2019 LCT One Dornbirn
3/4
1438 Verwaltungsgebude in Dornbirn 2012 12
1
2
25
6
3
7
cc
4 d
d
1 Kies 50 mm, Vlies, Abdichtung Kunststoffbahn,Geflledmmung 500 580 mm, Bitumenbahn
2 Holz-Beton-Hybriddecke Fertigteil 2,70/8,10 m: Druckgurt Stahlbetonplatte 80 mm, Unterzug
Brettschichtholz 240/280 mm Hohlraum fr Installation, Deckenpaneel Stahl- blech perforiert 2 mm mit Heiz-/Khlrohren 3 Wrmeschutzverglasung ESG 4 + SZR 18 +
ESG 4 + 18 + ESG 4 mm in Holz-Alu-Rahmen4 Sonnenschutz Raffstore Aluminium
5 Teppichboden 10 mm, Doppelboden 36 mm Aufstnderung 64 mm Trittschalldmmung 30 mm6 Befestigung Deckenelement auf Sttze:
Bolzen Stahl 40 mm, Fuge vergossenmit Beton
7 Fassadenelement vorgefertigt 10,80/3,30 m:Aluminiumblech gebrstet 3 mm
Unterkonstruktion/Hinterlftung 86 mmSpanplatte zementgebunden 18 mmWrmedmmung Mineralwolle 320 mmOSB-Platte 18 mm, Dampfsperre
Vorsatzschale 33 mm, Gipskartonplatte 15 mmbzw. Sttze Brettschichtholz Fichte2 240/240 mm
8 Brandschutzverkleidung Gipskarton 2 12,5 mm 9 Brandschutzverkleidung10 Auflager Stahlprofil 40 mm
mit Flansch und Stahldorn11 Hllrohr um Stahlbolzen, nach Montage mit
Beton vergossen12 Silikonharzputz 2 mm, Armiermrtel WDVS 5 mm Mineralwolle 300 mm, Stahlbeton 300 mm
dd
1 50 mm gravel; fibre mat; plastic sealing layer500 580 mm insulation to falls
bituminous sealing layer 2 2.70/8.10 m timber-concrete hybrid floor unit: 80 mm reinf. concrete compression chord
240/280 mm lam. timber downstand beamspace for services; 2 mm perforated sheet-
steel soffit panel with heating/cooling pipes3 low-E triple glazing in oiled softwood frame:
3 4 mm toughened glass + 2 18 mm cavity 4 aluminium Venetian blind5 10 mm carpet flooring; 36 mm double floor
64 mm raising structure 30 mm impact-sound insulation6 fixing of floor element to column:
40 mm steel bolt, joint filled with concrete7 10.80/3.30 m prefabricated facade element:
3 mm brushed sheet aluminium86 mm supporting structure/rear ventilation18 mm cement-bonded chipboard
320 mm mineral-wool thermal insulation18 mm oriented-strand board; vapour barrier33 mm dry lining; 15 mm gypsum plasterboard
2 240/240 mm lam. softwood columns8 2 12.5 mm gypsum plasterboard
9 fire-resistant cladding10 40 mm steel angle bearer with flange and
steel pin11 sheathing tube around steel pin, filled with
concrete after assembly12 2 mm silicone resin; 5 mm composite mortar
thermal insulation system; 300 mm mineral wool300 mm reinforced concrete
7/23/2019 LCT One Dornbirn
4/4
2012 12 Dokumentation 1439
11
89 10
12
77
Schema Montage Fassaden-tafeln auf Deckenelementenohne MastabSchnitte Mastab 1:20
Diagram: assembly of facadepanels on floor elements(not to scale)Sections scale 1:20
cc