+ All Categories
Home > Documents > .0 0 M R 7 .0IN 7 3W 3 0 2€¦ · 629.05 620.58 620.54 619.1401 619.12 618.14 615.07 610.08 606.79...

.0 0 M R 7 .0IN 7 3W 3 0 2€¦ · 629.05 620.58 620.54 619.1401 619.12 618.14 615.07 610.08 606.79...

Date post: 09-Jul-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
15
Transcript
Page 1: .0 0 M R 7 .0IN 7 3W 3 0 2€¦ · 629.05 620.58 620.54 619.1401 619.12 618.14 615.07 610.08 606.79 606.353 606.23 534.71 527.303 511.07 511.07 508.13 409.15 403.213 403.208 304.10
Page 2: .0 0 M R 7 .0IN 7 3W 3 0 2€¦ · 629.05 620.58 620.54 619.1401 619.12 618.14 615.07 610.08 606.79 606.353 606.23 534.71 527.303 511.07 511.07 508.13 409.15 403.213 403.208 304.10

DE

SIG

N-

DE

TAIL

ED

BY

DA

TE

PR

OJ.

MA

NA

GE

R

SHEET NUMBER

FIE

LD

CH

AN

GE

S

RE

VISIO

NS

1

RE

VISIO

NS

2

RE

VISIO

NS

3

RE

VISIO

NS

4

CH

EC

KE

D-

RE

VIE

WE

D

HIG

HW

AY

Divisio

n:

Filena

me:...\

MS

TA\

002

_GeneralN

otes.d

gn

Userna

me:

Date:4/2

7/2

015

nic

holas.w.h

artle

y

OF

DE

SIG

N2-

DE

TAIL

ED

2

DE

SIG

N3-

DE

TAIL

ED

3

WIN

HIG

HW

AY P

LA

NS

ST

AT

E O

F M

AIN

E

DE

PA

RT

ME

NT O

F T

RA

NSP

OR

TA

TIO

N

DA

TE

SIG

NA

TU

RE

P.E.

NU

MB

ER

GE

NE

RA

L

NO

TE

S/

ES

TI

MA

TE

__

__

_

215

20337.0

0

CLIN

TO

N

RIV

ER

RO

AD

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

N

HA

RT

LE

Y_

__

__

__

__

__

_

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

SH

AW

N

SMIT

H

CONSTRUCTION NOTESGENERAL NOTES

M.K

IRK

MA

NN

T.W

HIT

EA

PR

2014

ESTIMATED QUANTITIES

ITEM NO. QUANTITYDESCRIPTION UNIT

020337.0

0

TO ITEM 203.33 SPECIAL FILL.

PROVISION 203.33. THIS WORK SHALL BE INCIDENTAL

REMOVE VOIDS IN THE APRON. SEE SPECIAL

DREDGE MATERIAL AND/OR GRANULAR BORROW TO

RIPRAP IN APRONS SHALL BE MIXED WITH EXCAVATED

610.08 PLAIN RIPRAP

STA. 5+00.5 RT TO STA. 5+38 RT

STA. 3+69.5 LT TO STA. 4+07 LT

606.79 GUARDRAIL 350 FLARED TERMINAL

TOTAL: 6 EA

STA. 5+38 RT

STA. 5+00.5 RT

STA. 4+07 LT

STA. 3+69.5 LT

STA. 5+57 LT

STA. 3+38 RT

606.353 REFLECTORIZED FLEXIBLE GUARDRAIL MARKER

STA. 4+07 15’ LT TO STA. 5+19.5 15’ RT (9 PANELS)

STA 3+75.5 15’ RT TO STA. 5+00.5 15’ RT (10 PANELS)

606.23 GUARDRAIL TYPE 3C-SINGLE RAIL

EXCAVATION BELOW SUBGRADE INCIDENTAL TO THIS ITEM

PVC SLEEVES AND CEMENTIOUS MATERIAL INCIDENTAL TO THIS ITEM.

ANY NECESSARY CLEARING SHALL BE INCIDENTAL TO THIS ITEM.

AREAS AND STATIONS AS SHOWN ON PLANS.

531.71 PRECAST CONCRETE BOX CULVERT

STA. 5+19.5 15’ LT TO STA. 5+57 15’ LT

STA. 3+38 15’ RT TO STA. 3+75.5 15’ RT

527.303 ENERGY ABSORBING SYSTEM (ET-PLUS)

DOWNSTREAM: 1 LS

UPSTREAM: 1 LS

511.07 COFFERDAM

659.10

656.75

652.38

652.361

652.35

652.34

652.33

652.312

639.19

631.172

631.12

629.05

620.58

620.54

619.1401

619.12

618.14

615.07

610.08

606.79

606.353

606.23

534.71

527.303

511.07

511.07

508.13

409.15

403.213

403.208

304.10

206.07

203.35

203.33

203.25

203.20

MOBILIZATION

TEMPORARY SOIL EROSION AND WATER POLLUTION CONTROL

FLAGGER

MAINTENANCE OF TRAFFIC CONTROL DEVICES

CONSTRUCTION SIGN

CONE

DRUM

BARRICADE TYPE III

FIELD OFFICE TYPE B

TRUCK - LARGE (INCLUDING OPERATOR)

ALL PURPOSE EXCAVATOR (INCLUDING OPERATOR)

HAND LABOR, STRAIGHT TIME

EROSION CONTROL GEOTEXTILE

STABILIZATION GEOTEXTILE

EROSION CONTROL MIX

MULCH

SEEDING METHOD 2

LOAM

PLAIN RIPRAP

GUARDRAIL 350 FLARED TERMINAL

REFLECTORIZED FLEXIBLE GUARDRAIL MARKER

GUARDRAIL TYPE 3C - SINGLE RAIL

PRECAST CONCRETE BOX CULVERT

ENERGY ABSORBING SYSTEM (ET-PLUS)

COFFERDAM: DOWNSTREAM

COFFERDAM: UPSTREAM

MEMBRANE WATERPROOFING

BITUMINOUS TACK COAT - APPLIED

HOT MIX ASPHALT 12.5 MM BASE

HOT MIX ASPHALT 12.5 MM HMA SURFACE

AGGREGATE SUBBASE COURSE - GRAVEL

STR ROCK EXC - DR AND MINOR STR

CRUSHED STONE FILL

SPECIAL FILL

GRANULAR BORROW

COMMON EXCAVATION

LS

LS

HR

LS

SF

EA

EA

EA

EA

HR

HR

HR

SY

SY

CY

UN

UN

CY

CY

EA

EA

LF

LS

EA

LS

LS

SY

G

T

T

CY

CY

CY

CY

CY

CY

1

1

240

60

500

50

20

6

1

10

10

20

180

210

10

1

1

10

120

2

6

237.5

1

2

1

1

130

50

190

100

530

20

50

30

360

490

CONTROL, FEBRUARY, 2008.

TRANSPORTATION’S BEST MANAGEMENT PRACTICES FOR EROSION & SEDIMENTATION

24. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE MAINE DEPARTMENT OF

ACCEPTABLE TO THE RESIDENT.

FURNISHED BY MAINEDOT. ALL LAYOUT, STAKES, AND GRADES WILL BE CHECKED AND MUST BE

TO DETERMINE NEW CONSTRUCTION FINISH GRADES FROM DIFFERENTIAL ELEVATION SHEETS

THESE STAKES. THESE STAKES AND GRADES WILL BE USED TO LAYOUT CENTERLINE AND

THE CONSTRUCTION LIMITS AND THE EXISTING CENTERLINE GRADES SHALL BE TRANSFERRED TO

AS PER STANDARD SPECIFICATION 105.6.2. SIDE STAKES SHALL BE PLACED SAFELY OUTSIDE OF

23. THE CONTRACTOR IS RESPONSIBLE FOR THE CAREFUL SIDE STAKING OF EXISTING CENTERLINE

WILL BE MADE UNDER ITEM 620.58 EROSION CONTROL GEOTEXTILE.

22. EROSION CONTROL GEOTEXTILE SHALL BE PLACED AT ALL RIPRAP LOCATIONS. PAYMENT

21. STATIONS REFERENCED ARE APPROXIMATE.

COMMON EXCAVATION.

20. REMOVAL OF EXISTING DRAINAGE SHALL BE CONSIDERED INCIDENTAL TO ITEM 203.20

REPLACED AS DETERMINED BY THE RESIDENT AT THE CONTRACTOR’S EXPENSE.

CULVERT. ANY DAMAGE TO THE BOX CULVERT DURING CONSTRUCTION SHALL BE REPAIRED OR

19. RIPRAP ADJACENT TO THE BOX CULVERT SHALL BE PLACED SO AS TO NOT DAMAGE THE

INCIDENTAL TO THE RELATED DRAINAGE ITEMS.

BACKSLOPING REQUIREMENTS WILL NOT BE PAID FOR DIRECTLY BUT WILL BE CONSIDERED

18. ADDITIONAL EXCAVATION FOR THE CONTRACTOR’S CONVENIENCE OR TO COMPLY WITH

EXCAVATION, DITCH & INSLOPE, OR EQUIPMENT RENTAL AREAS.

17. AREAS REQUIRING FILL ON THE PROJECT WILL COME FROM SUITABLE EXCAVATION FROM

EXPENSE.

EQUIPMENT, AND MATERIALS REQUIRED TO MAKE REPAIRS SHALL BE AT THE CONTRACTOR’S

OR OPERATION SHALL BE REPAIRED TO THE SATISFACTION OF THE RESIDENT. ALL WORK,

16. ANY DAMAGE TO THE SLOPES CAUSED BY THE CONTRACTOR’S EQUIPMENT, PERSONNEL,

CONTRACT.

ENSURE THAT THE MAIL WILL BE DELIVERABLE. PAYMENT WILL BE INCIDENTAL TO THE

15. THE CONTRACTOR WILL BE RESPONSIBLE FOR MAINTAINING ALL EXISTING MAILBOXES TO

EACH SECTION OF BEAM GUARDRAIL.

14. GUARDRAIL END TREATMENTS SHALL BE INSTALLED CONCURRENTLY WITH THE PLACEMENT OF

APPROVAL OF THE RESIDENT.

13. NO EXISTING DRAINAGE SHALL BE ABANDONED, REMOVED OR PLUGGED WITHOUT PRIOR

TO THE RELATED PAVING ITEMS.

12. ANY NECESSARY CLEANING OF EXISTING PAVEMENT PRIOR TO PAVING SHALL BE INCIDENTAL

INCIDENTAL TO 656 ITEMS.

WASTE AREAS. GRADING, SEEDING, AND MULCHING OF WASTE AREAS TO BE CONSIDERED

11. ALL WASTE MATERIAL NOT USED ON THE PROJECT SHALL BE DISPOSED OF IN ACCEPTABLE

PAVEMENT.

FINAL COMPLETION OF THE PROJECT THERE IS NO DROP-OFF FROM THE EDGE OF SHOULDER

10. THE CONTRACTOR SHALL PLAN AND CONDUCT THEIR WORK ACCORDINGLY SO THAT UPON

DETERMINED BY THE RESIDENT.

A DEPTH OF 2 INCHES. EROSION CONTROL MIX MAY BE USED IN THESE AREAS AS

9. NEWLY CONSTRUCTED SIDESLOPES NOT RECEIVING RIPRAP SHALL HAVE LOAM PLACED TO

8. UNLESS OTHERWISE NOTED, SEEDING METHOD NO.1 SHALL BE USED.

BE PLACED TO A NOMINAL DEPTH OF 2 INCHES.

7. LOAM, SEED, AND MULCH ARE TO BE PLACED ON DISTURBED LAWN AREAS. LOAM SHALL

FLATTER, OR AS DIRECTED BY THE RESIDENT.

6. ALL INSLOPE AND DITCHES IN CUT AREAS SHALL BE GRADED AS SHOWN ON THE TYPICALS OR

SAW CUT. PAYMENT SHALL BE INCIDENTAL TO THE 403 ITEMS.

5. ALL JOINTS BETWEEN EXISTING AND PROPOSED HOT BITUMINOUS PAVEMENT SHALL BE

RESIDENT.

ACTUAL LIMITS SHALL BE DETERMINED BY THE CONTRACTOR AND APPROVED BY THE

4. CLEARING LIMIT LINES SHOWN ON THE PLANS ARE FOR ESTIMATING PURPOSES ONLY.

RIGHT OF WAY MAP.

3. FOR EASEMENTS, CONSTRUCTION LIMITS AND RIGHT OF WAY LINES, REFER TO THE

SPECIFIED IN THE SPECIAL PROVISIONS.

2. DURING CONSTRUCTION, THE ROAD WILL BE CLOSED TO TRAFFIC FOR A TIME PERIOD

OWNERS UNLESS OTHERWISE NOTED.

1. INVOLVED UTILITIES SHALL BE ADJUSTED AS NECESSARY BY THEIR RESPECTIVE

Page 3: .0 0 M R 7 .0IN 7 3W 3 0 2€¦ · 629.05 620.58 620.54 619.1401 619.12 618.14 615.07 610.08 606.79 606.353 606.23 534.71 527.303 511.07 511.07 508.13 409.15 403.213 403.208 304.10

REMOVE EXISTING TWIN 6’ CULVERTS

14" ASH

REMOVE TREE

-38.31

STA 3+22.78

38.23

STA 3+46.06

LIMIT WORK

STA 4+75

LIMIT WORK

STA 1+00

AND SLOPE PROTECTION (TYP>)

PLAIN RIPRAP APRON

UPSTREAM COFFERDAM

APPROX. LOCATION OF

DOWNSTREAM COFFERDAM

APPROX. LOCATION OF

3+00

4+00

5+00

6+00

7+00

8+00

8+348+34

PO

B

=

ST

A. 3

+00.00

PC

=

ST

A. 4

+07.07

PT

=

ST

A.

4+

84.7

4

PC

=

ST

A.

5+

44.0

4

PT

=

ST

A.

6+

06.8

5

PC

=

ST

A.

6+

52.1

6

PT =

ST

A.

7+

73.2

6

PO

E =

ST

A.

8+

34.3

7

E = 1.01’

T = 38.87’

L = 77.67’

R = 750.00’

PI = 4+45.94

CURVE DATA #1

E = 0.66’

T = 31.42’

L = 62.80’

R = 750.00’

PI = 5+75.46

CURVE DATA #2

E = 2.63’

T = 60.70’

L = 121.10’

R = 700.00’

PI = 7+12.86

CURVE DATA #3

New Pole

New Pole

DE

SIG

N-

DE

TAIL

ED

BY

DA

TE

PR

OJ.

MA

NA

GE

R

SHEET NUMBER

FIE

LD

CH

AN

GE

S

RE

VISIO

NS

1

RE

VISIO

NS

2

RE

VISIO

NS

3

RE

VISIO

NS

4

CH

EC

KE

D-

RE

VIE

WE

D

HIG

HW

AY

Divisio

n:

Filena

me:...\

HIG

HW

AY\

MS

TA\

003

_H

DPla

n1.d

gn

Userna

me:

Date:4/2

7/2

015

nic

holas.w.h

artle

y

OF

PL

AN

S

DE

SIG

N2-

DE

TAIL

ED

2

DE

SIG

N3-

DE

TAIL

ED

3

WIN

HIG

HW

AY P

LA

NS

ST

AT

E O

F M

AIN

E

DE

PA

RT

ME

NT O

F T

RA

NSP

OR

TA

TIO

N

DA

TE

SIG

NA

TU

RE

P.E.

NU

MB

ER

__

__

_

315

20337.0

0

CLIN

TO

N

RIV

ER

RO

AD

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

N

HA

RT

LE

Y_

__

__

__

__

__

_

M.K

IRK

MA

NN

T.W

HIT

E

__

__

__

__

__

__

__

__

__

__

__

__

AP

R

2014

__

__

__

SH

AW

N

SMIT

H

020337.0

0

72"

CMP

72"

CMP

14"

ASH

TOP

OF

PIP

E

TOP

OF

PIP

E

TOP

OF

PIP

E

JAC

KIN

S BR

OO

K SET

TLED

17

72

130/1

09

IPF

2"

DIA PIN STEEL

SPIK

E

18"

CMP

18"

IPF

2"

DIA PIN STEEL

SPIK

E

6" DIA W

OO

D15"

CMP

TOP

OF

PIP

E

24"

PCP

128

STB128/1

07

131/

1/110

Page 4: .0 0 M R 7 .0IN 7 3W 3 0 2€¦ · 629.05 620.58 620.54 619.1401 619.12 618.14 615.07 610.08 606.79 606.353 606.23 534.71 527.303 511.07 511.07 508.13 409.15 403.213 403.208 304.10

BY

DA

TE

SHEET NUMBER

OF

TY

PIC

AL

SE

CTIO

NS

NOT TO SCALE

NOTE:

HIG

HW

AY

Divisio

n:

Filena

me:...\

HIG

HW

AY\

MS

TA\

004

_T

ypic

al.dgn

Userna

me:

Date:4/2

7/2

015

nic

holas.w.h

artle

y

DE

SIG

N-

DE

TAIL

ED

PR

OJ.

MA

NA

GE

R

FIE

LD

CH

AN

GE

S

RE

VISIO

NS

1

RE

VISIO

NS

2

RE

VISIO

NS

3

RE

VISIO

NS

4

CH

EC

KE

D-

RE

VIE

WE

D

DE

SIG

N2-

DE

TAIL

ED

2

DE

SIG

N3-

DE

TAIL

ED

3

WIN

HIG

HW

AY P

LA

NS

ST

AT

E O

F M

AIN

E

DE

PA

RT

ME

NT O

F T

RA

NSP

OR

TA

TIO

N

DA

TE

SIG

NA

TU

RE

P.E.

NU

MB

ER

3.00 11.00 3.00CL

VARIES VARIESVARIESVARIES

3.003.00

TYPICAL APPROACH SECTION

TYPICAL LEFT GUARDRAIL APPROACH TYPICAL RIGHT GUARDRAIL APPROACH

VARIES VARIES

__

__

_

415

20337.0

0

CLIN

TO

N

RIV

ER

RO

AD

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

SH

AW

N

SMIT

H

N

HA

RT

LE

Y

VARIES VARIES

VARIESVARIES

18" AGGREGATE SUBBASE COURSE GRAVEL

M.K

IRK

MA

NN

T.W

HIT

EA

PR

2014

020337.0

0

6" HMA

2:1 OR

FLATT

ER 2:1 OR FLATTER

2:1 OR FLATTER2:1 O

R FLA

TTTE

R

4.00 11.00 4.00

4.00 4.00

TRAVEWAY CROSS SLOPES "ROLLOVER" SHALL NOT EXCEED 8%.

3. THE ALGEBRAIC DIFFERENCE BETWEEN THE SHOULDER AND

STRAIGHT.

FOR ALL COURSES OF SUBBASE AND PAVEMENT SHALL BE

2. CROWNS FOR BOTH NORMAL AND SUPERELEVATION SECTIONS

THE PLANS ARE INTENDED TO BE NOMINAL.

1. THE PAVEMENT, BASE AND SUBBASE DEPTHS AS SHOWN ON

18" AGGREGATE SUBBASE COURSE GRAVEL

6" HMA

18" AGGREGATE SUBBASE COURSE GRAVEL

6" HMA

Page 5: .0 0 M R 7 .0IN 7 3W 3 0 2€¦ · 629.05 620.58 620.54 619.1401 619.12 618.14 615.07 610.08 606.79 606.353 606.23 534.71 527.303 511.07 511.07 508.13 409.15 403.213 403.208 304.10

DE

SIG

N-

DE

TAIL

ED

BY

DA

TE

PR

OJ.

MA

NA

GE

R

SHEET NUMBER

FIE

LD

CH

AN

GE

S

RE

VISIO

NS

1

RE

VISIO

NS

2

RE

VISIO

NS

3

RE

VISIO

NS

4

CH

EC

KE

D-

RE

VIE

WE

D

HIG

HW

AY

Divisio

n:

Filena

me:...\

MS

TA\

005

_P

LA

NP

RO

FIL

E.D

GN

Userna

me:

Date:4/27/2

015

nic

holas.w.h

artle

y

OF

PL

AN

S

DE

SIG

N2-

DE

TAIL

ED

2

DE

SIG

N3-

DE

TAIL

ED

3

HIG

HW

AY P

LA

NS

ST

AT

E O

F M

AIN

E

DE

PA

RT

ME

NT O

F T

RA

NSP

OR

TA

TIO

N

DA

TE

SIG

NA

TU

RE

P.E.

NU

MB

ER

__

__

_

5

020337.0

0

15

20337.0

0

CLIN

TO

N

RIV

ER

RO

AD

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

N

HA

RT

LE

Y_

__

__

__

__

__

_

M.K

IRK

MA

NN

T.W

HIT

E

__

__

__

__

__

__

__

__

__

__

__

__

AP

R

2014

__

__

__

SH

AW

N

SMIT

H

WIN

3+00

4+00 5+00

6+00

PO

B

=

ST

A. 3

+00.00

PC

=

ST

A. 4

+07.07

PT

=

ST

A. 4

+84.74

PC

=

ST

A. 5

+44.04

PT

=

ST

A.

6+

06.8

5

PC

=

ST

A.

6+

52.1

6

E = 1.01’

T = 38.87’

L = 77.67’

R = 750.00’

PI = 4+45.94

CURVE DATA #1

E = 0.66’

T = 31.42’

L = 62.80’

R = 750.00’

PI = 5+75.46

CURVE DATA #2

New Pole

New Pole

100

105

110

115

120

125

130

135

140

145145

100

105

110

115

120

125

130

135

140

145145

3+00 4+00 5+00 6+00

3+00 4+00 5+00 6+00

PROFILE

PVI =

ST

A. 3

+00.0

0

ELE

V. =

131.58

PV

C =

ST

A. 3

+10.9

5

ELE

V. =

130.5

1

PVI =

ST

A. 4+3

7.18

ELE

V. =

118.2

5

LOW POINT = STA. 4+67.53

ELEV. = 122.91

PVT =

ST

A. 5+6

3.4

0

ELE

V. =

125.7

6

G = -9.72%

G = 5.

95%

E = 4.943’

SD = 113’

EL. 12

5.5

6

EL. 12

4.3

2

EL. 12

3.4

7

EL. 12

3.0

0

EL. 12

2.9

2

EL. 12

3.2

3

EL. 12

3.9

3

EL. 131.5

8

EL. 129.2

4

EL. 127.2

5

EL. 125.6

0

EL. 124.3

3

EL. 123.4

5

EL. 123.0

0

EL. 122.9

6

EL. 123.2

8

EL. 123.9

1

EL. 125.0

7

EL. 126.4

6

EL. 127.9

3

50.00’67.71’50.00’

CRUSHED STONE

GRANULAR BORROW

PAY LIMITS FOR

CONCRETE BOX CULVERT

BY 6’ RISE PRECAST

PROPOSED 10’ SPAN

BEGIN GRAVEL TAPER

MATCH EXISTING

STA 3+70

BEGIN PROJECT

END GRAVEL TAPER

STA 4+20 BEGIN GRAVEL TAPER

END PROJECT

STA 4+88

MATCH EXISTING

END GRAVEL TAPER

STA 5+38

72"

CMP

72"

CMP

14"

AS

H

TOP

OF PIP

E

TOP

OF PIP

E

TOP

OF PIP

E

JAC

KIN

S BR

OO

K SETTLED 17

72

130/10

9 IPF

2"

DIA PIN STEEL SPIK

E

18"

CMP

18"

IPF

2"

DIA PIN STEEL SPIK

E

6"

DIA

WO

OD

15"

CMP

Page 6: .0 0 M R 7 .0IN 7 3W 3 0 2€¦ · 629.05 620.58 620.54 619.1401 619.12 618.14 615.07 610.08 606.79 606.353 606.23 534.71 527.303 511.07 511.07 508.13 409.15 403.213 403.208 304.10

BY

DA

TE

SHEET NUMBER

OFNOT TO SCALE

HIG

HW

AY

Divisio

n:

Filena

me:...\

MS

TA\

006_

Culv

ertDetail.d

gn

Userna

me:

Date:4/2

7/2

015

nic

holas.w.h

artle

y

DE

SIG

N-

DE

TAIL

ED

PR

OJ.

MA

NA

GE

R

FIE

LD

CH

AN

GE

S

RE

VISIO

NS

1

RE

VISIO

NS

2

RE

VISIO

NS

3

RE

VISIO

NS

4

CH

EC

KE

D-

RE

VIE

WE

D

DE

SIG

N2-

DE

TAIL

ED

2

DE

SIG

N3-

DE

TAIL

ED

3

WIN

HIG

HW

AY P

LA

NS

ST

AT

E O

F M

AIN

E

DE

PA

RT

ME

NT O

F T

RA

NSP

OR

TA

TIO

N

DA

TE

SIG

NA

TU

RE

P.E.

NU

MB

ER

3’-0"

2’-0"

TYPICAL BOX SECTION

2’-0"

GEOTEXTILE OVERLAP MIN.

1’-0

"

CRUSHED STONE MIN.

STABILIZATION GEOTEXTILE

WATERPROOFING MEMBRANE

2"

MIN.

PRECAST CONCRETE TOE WALL DETAIL

1’ 0"

MIN.

TYPICAL LONGITUDINAL SECTION

Flow

GRADIENT: 1.18%

PRECAST CONCRETE BOX CULVERT

10’ SPAN BY 6’ RISE

2’-0"

1’-0

" 1’-0"

APRON (TYP.)

PLAIN RIPRAP

1’-0" CRUSHED STONE (MIN.)

CL CONSTRUCTION

C LC

UL

VE

RT

5’-0"

5’-0" 1’-0

" (T

YP.)

9- 2�

" P

VC S

LE

EV

ES

STA. 3+34.1

CONCRETE BOX PLAN

2’-0"

1’-0"

1’-6

"

A800

PRODUCT LIST

MAINEDOT QUALIFIED

CEMENTIOUS MATERIAL FROM

2�" PVC SLEEVE WITH

__

__

_

615

20337.0

0

CLIN

TO

N

RIV

ER

RO

AD

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

SH

AW

N

SMIT

H

BO

X

CU

LV

ER

T

DE

TAIL

S

(SEE TOE WALL DETAIL)

PRECAST CONCRETE TOE WALL

RIPRAP SLOPE PROTECTION (TYP.)

N

HA

RT

LE

Y

Flow

16°49’36" TO

E

WA

LL

WID

TH

RETENTION SILL DETAIL

6"

10’-0"

6"

8’-0"

40’-0" 40’-0"

CULVERT NOTES

FOR LIMITS OF GRANULAR BORROW

*REFER TO PROFILE SHEET #5

2:1

3’-0"

GRANULAR BORROWFOR LIMITS OF GRANULAR BORROW

*REFER TO PROFILE SHEET #5

2:1

M.K

IRK

MA

NN

T.W

HIT

EA

PR

2014

BACKFILL WITH EXCAVATED MATERIAL (TYP.)

IN ACCORDANCE WITH OSHA REQUIREMENTS.

CONTRACTOR’S METHOD OF EXCAVATION

ELEV. 109.52

INV. IN

ELE. 108.56

INV. IN

020337.0

0

1’-0

"

1’-3

"

6"

(SEE RETENTION SILL DETAIL)

RETENTION SILL

-SPECIAL FILL

-RETENTION SILLS

PROVIDE STREAM BED

3’-0" GEOTEXTILE (TYP.)

(SEE RETENTION SILL DETAIL)

RETENTION SILL

1’-0"

MA

TC

H

OU

TSID

E

WID

TH

LOW FLOW CHANNEL

APPROX. LOCATION OF

TO ITEM 203.33 SPECIAL FILL.

AS DIRECTED BY THE RESIDENT. THIS WORK SHALL BE INCIDENTAL

AND COINCIDE WITH THE LOW POINTS OF THE RETENTION SILLS

ALTERNATE FROM SIDE TO SIDE, FORMING ONE COMPLETE S-CURVE,

TO AN APPROXIMATE DEPTH OF 4 INCHES. THIS PATH SHALL

IN THE CONSTRUCTED SUBSTRATE APPROXIMATELY 3 FEET WIDE

3. THE CONTRACTOR SHALL CONSTRUCT A MEANDERING CHANNEL

SPECIFICATIONS AS APPLICABLE.

UNITS SHALL BE IN ACCORDANCE WITH THE MANUFACTURER’S

2. CONSTRUCTION, HANDLING, AND ASSEMBLY OF THE PRECAST

PRECAST UNITS.

AND TO AT LEAST 12 INCHES DOWN THE EXTERIOR SIDES OF

1. INSTALL STANDARD MEMBRANE WATERPROOFING OVER THE TOP

3’-0"

CHANNEL

LOW FLOW

Page 7: .0 0 M R 7 .0IN 7 3W 3 0 2€¦ · 629.05 620.58 620.54 619.1401 619.12 618.14 615.07 610.08 606.79 606.353 606.23 534.71 527.303 511.07 511.07 508.13 409.15 403.213 403.208 304.10

HIG

HW

AY

Divisio

n:

Filena

me:...\

MS

TA\

007

_X

SE

CT_

3+5

0_

002.d

gn

Userna

me:

Date:4/2

7/2

015

nic

holas.w.h

artle

y

DE

SIG

N-

DE

TAIL

ED

BY

DA

TE

PR

OJ.

MA

NA

GE

R

SHEET NUMBER

FIE

LD

CH

AN

GE

S

RE

VISIO

NS

1

RE

VISIO

NS

2

RE

VISIO

NS

3

RE

VISIO

NS

4

CH

EC

KE

D-

RE

VIE

WE

D

OF

DE

SIG

N2-

DE

TAIL

ED

2

DE

SIG

N3-

DE

TAIL

ED

3

DE

PA

RT

ME

NT O

F T

RA

NSP

OR

TA

TIO

N

ST

AT

E O

F M

AIN

E

DA

TE

SIG

NA

TU

RE

P.E.

NU

MB

ER

CR

OS

S

SE

CTIO

NS

110

115

120

125

130

135

140

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

3+50.00

110

115

120

125

130

135

140

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

110

115

120

125

130

135

140

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

3+75.00

110

115

120

125

130

135

140

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

Sta. 3+50.00 to Sta. 3+75.00

CL

CL

CL

125.56

-10.7%-2.8% -3.8%

-11.2%

EXIST. 128

STA. 3+49.84-0.66 RT.

EXIST.

STA. 3+50.00

-0.13 RT.

EXIST.

STA. 3+75.00

17.13 LT.

-25.86 FT

22.90 FT

WIDEN SHOULDER FOR 350 FLARE

INSTALL GR 350 FLARED TERM.

STA. 3+69.5 LT TO STA. 4+07 LT

INSTALL ET-PLUS

STA. 3+38 15’ RT TO STA. 3+75.5 15’ RT

__

__

_

7

020337.0

0

15

20337.0

0

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

N

HA

RT

LE

Y_

__

__

__

__

__

_

M.K

IRK

MA

NN

T.W

HIT

E

__

__

__

__

__

__

__

__

__

__

__

__

AP

R

2014

__

__

__

SH

AW

N

SMIT

H

WIN

Page 8: .0 0 M R 7 .0IN 7 3W 3 0 2€¦ · 629.05 620.58 620.54 619.1401 619.12 618.14 615.07 610.08 606.79 606.353 606.23 534.71 527.303 511.07 511.07 508.13 409.15 403.213 403.208 304.10

HIG

HW

AY

Divisio

n:

Filena

me:...\

MS

TA\

008

_X

SE

CT

_4

+00_

003.d

gn

Userna

me:

Date:4/2

7/2

015

nic

holas.w.h

artle

y

DE

SIG

N-

DE

TAIL

ED

BY

DA

TE

PR

OJ.

MA

NA

GE

R

SHEET NUMBER

FIE

LD

CH

AN

GE

S

RE

VISIO

NS

1

RE

VISIO

NS

2

RE

VISIO

NS

3

RE

VISIO

NS

4

CH

EC

KE

D-

RE

VIE

WE

D

OF

DE

SIG

N2-

DE

TAIL

ED

2

DE

SIG

N3-

DE

TAIL

ED

3

DE

PA

RT

ME

NT O

F T

RA

NSP

OR

TA

TIO

N

ST

AT

E O

F M

AIN

E

DA

TE

SIG

NA

TU

RE

P.E.

NU

MB

ER

CR

OS

S

SE

CTIO

NS

110

115

120

125

130

135

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

4+00.00

110

115

120

125

130

135

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

105

110

115

120

125

130

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

4+25.00

105

110

115

120

125

130

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

Sta. 4+00.00 to Sta. 4+25.00

CLCL

CL

CL

124.32

-11.8%-0.5% -3.5%

-11.2%

123.47

-2:1

-2:1

-14.5%0.8% -4.2%

-10.8%

-0.14 RT.

EXIST.

STA. 4+00.00

-0.46 RT.

EXIST.

STA. 4+25.00

INSTALL GR TYPE 3C (9 PANELS)

STA. 4+07 15’ LT TO STA. 5+19.5 15’ LT

INSTALL GR TYPE 3C (10 PANELS)

STA. 3+75.5 15’ RT TO STA. 5+00.5 15’ RT

__

__

_

8

020337.0

0

15

20337.0

0

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

N

HA

RT

LE

Y_

__

__

__

__

__

_

M.K

IRK

MA

NN

T.W

HIT

E

__

__

__

__

__

__

__

__

__

__

__

__

AP

R

2014

__

__

__

SH

AW

N

SMIT

H

WIN

Page 9: .0 0 M R 7 .0IN 7 3W 3 0 2€¦ · 629.05 620.58 620.54 619.1401 619.12 618.14 615.07 610.08 606.79 606.353 606.23 534.71 527.303 511.07 511.07 508.13 409.15 403.213 403.208 304.10

HIG

HW

AY

Divisio

n:

Filena

me:...\

MS

TA\

009_

XS

EC

T_

4+4

3_

004.d

gn

Userna

me:

Date:4/2

7/2

015

nic

holas.w.h

artle

y

DE

SIG

N-

DE

TAIL

ED

BY

DA

TE

PR

OJ.

MA

NA

GE

R

SHEET NUMBER

FIE

LD

CH

AN

GE

S

RE

VISIO

NS

1

RE

VISIO

NS

2

RE

VISIO

NS

3

RE

VISIO

NS

4

CH

EC

KE

D-

RE

VIE

WE

D

OF

DE

SIG

N2-

DE

TAIL

ED

2

DE

SIG

N3-

DE

TAIL

ED

3

DE

PA

RT

ME

NT O

F T

RA

NSP

OR

TA

TIO

N

ST

AT

E O

F M

AIN

E

DA

TE

SIG

NA

TU

RE

P.E.

NU

MB

ER

CR

OS

S

SE

CTIO

NS

100

105

110

115

120

125

130

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

4+43.00

100

105

110

115

120

125

130

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

100

105

110

115

120

125

130

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

4+50.00

100

105

110

115

120

125

130

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

Sta. 4+43.00 to Sta. 4+50.00

CL

CLCL

CL

123.09

-2:1

-6:11.2% -5.6%

-10.7%

-2:1

123.00

-2:1

-2:1

-6:12.0%

-5.8%-10.7%

-2:1

EXIST.

STA. 4+39.68

EXIST. 14" ASH

STA. 4+46.48

-0.39 RT.

EXIST.

STA. 4+43.00

EXIST.

STA. 4+48.44

EXIST.

STA. 4+39.68

EXIST. 14" ASH

STA. 4+46.48

-0.21 RT.

EXIST.

STA. 4+50.00

35.17 RT.

EXIST.

STA. 4+61.50

31.96 LT.

29.68 LT.

34.28 LT.

31.96 LT.

29.68 LT.

__

__

_

9

020337.0

0

15

20337.0

0

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

N

HA

RT

LE

Y_

__

__

__

__

__

_

M.K

IRK

MA

NN

T.W

HIT

E

__

__

__

__

__

__

__

__

__

__

__

__

AP

R

2014

__

__

__

SH

AW

N

SMIT

H

WIN

Page 10: .0 0 M R 7 .0IN 7 3W 3 0 2€¦ · 629.05 620.58 620.54 619.1401 619.12 618.14 615.07 610.08 606.79 606.353 606.23 534.71 527.303 511.07 511.07 508.13 409.15 403.213 403.208 304.10

HIG

HW

AY

Divisio

n:

Filena

me:...\

MS

TA\

010_

XS

EC

T_

4+67

_005.d

gn

Userna

me:

Date:4/2

7/2

015

nic

holas.w.h

artle

y

DE

SIG

N-

DE

TAIL

ED

BY

DA

TE

PR

OJ.

MA

NA

GE

R

SHEET NUMBER

FIE

LD

CH

AN

GE

S

RE

VISIO

NS

1

RE

VISIO

NS

2

RE

VISIO

NS

3

RE

VISIO

NS

4

CH

EC

KE

D-

RE

VIE

WE

D

OF

DE

SIG

N2-

DE

TAIL

ED

2

DE

SIG

N3-

DE

TAIL

ED

3

DE

PA

RT

ME

NT O

F T

RA

NSP

OR

TA

TIO

N

ST

AT

E O

F M

AIN

E

DA

TE

SIG

NA

TU

RE

P.E.

NU

MB

ER

CR

OS

S

SE

CTIO

NS

100

105

110

115

120

125

130

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

4+67.00

100

105

110

115

120

125

130

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

100

105

110

115

120

125

130

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

4+75.00

100

105

110

115

120

125

130

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

Sta. 4+67.00 to Sta. 4+75.00

CL

CL

CL

CL

122.91

-2:1

-6:12.7%

-7.6%-10.2%

-2:1

122.92

-2:1

-6:12.4%

-9.1%-8.3%

-2:1

0.29 RT.

EXIST.

STA. 4+67.00

31.48 RT.

EXIST.

STA. 4+68.32

0.43 RT.

EXIST.

STA. 4+75.00

31.48 RT.

EXIST.

STA. 4+68.32

__

__

_

10

020337.0

0

15

20337.0

0

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

N

HA

RT

LE

Y_

__

__

__

__

__

_

M.K

IRK

MA

NN

T.W

HIT

E

__

__

__

__

__

__

__

__

__

__

__

__

AP

R

2014

__

__

__

SH

AW

N

SMIT

H

WIN

Page 11: .0 0 M R 7 .0IN 7 3W 3 0 2€¦ · 629.05 620.58 620.54 619.1401 619.12 618.14 615.07 610.08 606.79 606.353 606.23 534.71 527.303 511.07 511.07 508.13 409.15 403.213 403.208 304.10

HIG

HW

AY

Divisio

n:

Filena

me:...\

MS

TA\

011_

XS

EC

T_

5+00_

006.d

gn

Userna

me:

Date:4/2

7/2

015

nic

holas.w.h

artle

y

DE

SIG

N-

DE

TAIL

ED

BY

DA

TE

PR

OJ.

MA

NA

GE

R

SHEET NUMBER

FIE

LD

CH

AN

GE

S

RE

VISIO

NS

1

RE

VISIO

NS

2

RE

VISIO

NS

3

RE

VISIO

NS

4

CH

EC

KE

D-

RE

VIE

WE

D

OF

DE

SIG

N2-

DE

TAIL

ED

2

DE

SIG

N3-

DE

TAIL

ED

3

DE

PA

RT

ME

NT O

F T

RA

NSP

OR

TA

TIO

N

ST

AT

E O

F M

AIN

E

DA

TE

SIG

NA

TU

RE

P.E.

NU

MB

ER

CR

OS

S

SE

CTIO

NS

105

110

115

120

125

130

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

5+00.00

105

110

115

120

125

130

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

105

110

115

120

125

130

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

5+25.00

105

110

115

120

125

130

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

110

115

120

125

130

135

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

5+50.00

110

115

120

125

130

135

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

Sta. 5+00.00 to Sta. 5+50.00

CL

CL

CL

CL

CL

123.23

-12.0% 2.1%-12.3%

-4.8%

123.93

-12.8% 3.0%

-11.2%

0.08 RT.

EXIST.

STA. 5+00.00

-0.34 RT.

EXIST.

STA. 5+25.00

-0.04 RT.

EXIST.

STA. 5+50.00

WIDER SHOULDER FOR 350 TERM

INSTALL GR 350 FLARED TERM

STA. 5+00.5 RT TO STA. 5+38 RT

INSTALL ET- PLUS

STA. 5+19.5 LT TO STA. 5+57 LT

__

__

_

11

020337.0

0

15

20337.0

0

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

N

HA

RT

LE

Y_

__

__

__

__

__

_

M.K

IRK

MA

NN

T.W

HIT

E

__

__

__

__

__

__

__

__

__

__

__

__

AP

R

2014

__

__

__

SH

AW

N

SMIT

H

WIN

Page 12: .0 0 M R 7 .0IN 7 3W 3 0 2€¦ · 629.05 620.58 620.54 619.1401 619.12 618.14 615.07 610.08 606.79 606.353 606.23 534.71 527.303 511.07 511.07 508.13 409.15 403.213 403.208 304.10

SHEET NUMBER

OF

DE

SIG

N-

DE

TAIL

ED

BY

DA

TE

PR

OJ.

MA

NA

GE

R

FIE

LD

CH

AN

GE

S

RE

VISIO

NS

1

RE

VISIO

NS

2

RE

VISIO

NS

3

RE

VISIO

NS

4

CH

EC

KE

D-

RE

VIE

WE

D

HIG

HW

AY

Divisio

n:

Filena

me:...\

HIG

HW

AY\

MS

TA\

012

_G

P&IS

P1.d

gn

Userna

me:

Date:4/2

7/2

015

nic

holas.w.h

artle

y

DE

SIG

N2-

DE

TAIL

ED

2

DE

SIG

N3-

DE

TAIL

ED

3

WIN

HIG

HW

AY P

LA

NS

ST

AT

E O

F M

AIN

E

DE

PA

RT

ME

NT O

F T

RA

NSP

OR

TA

TIO

N

DA

TE

SIG

NA

TU

RE

P.E.

NU

MB

ER

__

__

_

20337.0

0

CLIN

TO

N

RIV

ER

RO

AD

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

N

HA

RT

LE

Y_

__

__

__

__

__

_

M.K

IRK

MA

NN

T.W

HIT

E

__

__

__

__

__

__

__

__

__

__

__

__

AP

R

2014

__

__

__

SH

AW

N

SMIT

H

SU

BS

UR

FA

CE

PR

OFIL

E

GE

OP

LA

N

& IN

TE

RP

RE

TIV

EB

RID

GE N

O. 6485

1215

020337.0

0

115

120

125

130

135

140

145

150

115

120

125

130

135

140

145

150

2+00 3+00 4+00 5+00

2+00 3+00 4+00 5+00

110

105

100

110

105

100

50.00’75.50’

TRANSITION TRANSITIONPROJECT

STA 3+34.10

PRECAST CONCRETE BOX

10’ SPAN BY 6’ RISE

EXISTING GRADE

50.00’

PV

C =

ST

A. 2

+26.0

0

ELE

V. =

127.5

4

LOW POINT = STA. 3+48.06

ELEV. = 122.95

PVT =

ST

A. 4+4

4.0

0

ELE

V. =

125.7

9

V.C.L. = 218’

E = 3.667’

SD = 114’

Note:This generalized interpretive soil profile is intended to convey

trends in subsurface conditions. The boundaries between strata

are approximate and idealized, and have been developed by

interpretations of widely spaced explorations and samples.

Actual soil transitions may vary and are probably more erratic.

For more specific information refer to the exploration logs.

0

SCALE

5025

PROFILE

HORIZ 25

1050VERT 5

Boring No.

Strata Interface

for Rock Core SampleRock Quality Designation

RQD=

Offset, if sh

own

BOE= Bottom Of Exploration

Pavement Thickness if applicable

LEGEND

Boring

Top of Intack Bedrock

Weathered ROCK

BOE

SB-C

LIN-

101

RQD=6%BOE

SB-C

LIN-

102

RQD=17%

@ Station 3+48, ÉInterpolated Bedrock Elev. 105.6 ft

??

?

?

?

?

GRAVEL, some silt, (Fill).

Brown, damp, loose, fine to coarse

silt, (Fill).

medium GRAVEL, some sand, some

Brown, wet, medium dense, fine to

Rock Mass Quality = Very Poor

of core.

highly fractured PHYLLITE at bottom

to hard, stronger SILTSTONE at top,

R1:Bedrock: Dark grey, moderalely soft

GRAVEL, little silt.

Brown, moist, medium dense, sandy

SAND, some gravel, some silt.

Brown, wet, loose, fine to medium

SAND, some gravel, little silt, (Till).

Brown, wet, dense, fine to coarse

Rock Mass Quality = Very Poor

SILTSTONE at bottom.

PHYLLITE at top of core, stronger

soft to hard, highly fractured

R1:Bedrock: Dark grey, moderately

MA

G. 19

XX

Scale in Feet

PLAN

25 0 25 50

SB-CLIN-102

SB-CLIN-101

CASED WASH BORING

LEGEND

3+00

4+00 5+00

6+00

PO

B

=

ST

A. 3

+00.00

PC

=

ST

A. 4

+07.07

PT

=

ST

A. 4

+84.74

PC

=

ST

A. 5

+44.04

PT

=

ST

A.

6+

06.8

5

PC

=

ST

A.

6+

52.1

6

E = 1.01’

T = 38.87’

L = 77.67’

R = 750.00’

PI = 4+45.94

CURVE DATA #1

E = 0.66’

T = 31.42’

L = 62.80’

R = 750.00’

PI = 5+75.46

CURVE DATA #2 E = 2.63’

T = 60.70’

L = 121.10’

R = 700.00’

PI = 7+12.86

CURVE DATA #3110

72"

CMP

72"

CMP

14"

AS

H

115

115

115

TOP

OF PIP

E

TOP

OF PIP

E

TOP

OF PIP

E

120

120

120

120

120

120

JAC

KIN

S BR

OO

K SETTLED 17

72

125

125

125

125

130/10

9

IPF

2"

DIA PIN STEEL SPIK

E

18"

CMP

IPF

2"

DIA PIN STEEL SPIK

E

18"

6"

DIA

WO

OD

130

130

130

130

15"

CMP

Flo

wJ A C K I N S B R

O O K

135

135

145

Page 13: .0 0 M R 7 .0IN 7 3W 3 0 2€¦ · 629.05 620.58 620.54 619.1401 619.12 618.14 615.07 610.08 606.79 606.353 606.23 534.71 527.303 511.07 511.07 508.13 409.15 403.213 403.208 304.10

SHEET NUMBER

OF

DE

SIG

N-

DE

TAIL

ED

BY

DA

TE

PR

OJ.

MA

NA

GE

R

FIE

LD

CH

AN

GE

S

RE

VISIO

NS

1

RE

VISIO

NS

2

RE

VISIO

NS

3

RE

VISIO

NS

4

CH

EC

KE

D-

RE

VIE

WE

D

HIG

HW

AY

Divisio

n:

Filena

me:...\

MS

TA\

013

_B

ORIN

G

LO

GS

1.d

gn

Userna

me:

Date:4/2

7/2

015

nic

holas.w.h

artle

y

DE

SIG

N2-

DE

TAIL

ED

2

DE

SIG

N3-

DE

TAIL

ED

3

WIN

HIG

HW

AY P

LA

NS

ST

AT

E O

F M

AIN

E

DE

PA

RT

ME

NT O

F T

RA

NSP

OR

TA

TIO

N

DA

TE

SIG

NA

TU

RE

P.E.

NU

MB

ER

__

__

_

20337.0

0

CLIN

TO

N

RIV

ER

RO

AD

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

N

HA

RT

LE

Y_

__

__

__

__

__

_

M.K

IRK

MA

NN

T.W

HIT

E

__

__

__

__

__

__

__

__

__

__

__

__

AP

R

2014

__

__

__

SH

AW

N

SMIT

H

BRID

GE N

O. 6485

BO

RIN

G

LO

GS

1315

020337.0

0

0

5

10

15

20

25

1D

2D

3D

R1

24/15

24/19

21.6/18

60/60

5.00 -

7.00

10.00 -

12.00

15.00 -

16.80

16.90 -

21.90

28/11/12/11

2/3/2/2

14/12/28/50(3.6)

23

5

40

33

7

58

SSA

48

34

22

20

12

11

13

52

265

90

20

a50

NQ-2

112.70

109.20

105.30

100.30

Brown, moist, medium dense, sandy GRAVEL, little silt.

9.50

Grey, wet, loose, fine to medium SAND, some gravel,

some silt, trace clay, trace organics with wood.

13.00

Brown, wet, dense, fine to coarse SAND, some gravel,

little silt (Till). Weathered Rock in spoon tip.

a50 blows for 0.8 ft.

Roller Coned ahead to 16.9 ft bgs.

16.90

Top of Bedrock at Elev. 105.3 ft.

R1:Bedrock: Dark gray, white quartz veins. Moderately

soft to hard, minor rusty staining at top of core.

Highly fractured phyllite at top of core, stronger

R1:Core Times (min:sec)

16.9-17.9 ft (2:55)

17.9-18.9 ft (7:00)

18.9-19.9 ft (9:20)

19.9-20.9 ft (7:50)

21.90

Bottom of Exploration at 21.90 feet below ground

surface.

G#243126

A-1-a, GM

G#243127

A-2-4, SC-SM

G#243128

A-1-b, SM

Maine Department of Transportation Project: River Road Strut Replacement Boring No.: SB-CLIN-101

Soil/Rock Exploration LogLocation: Clinton, Maine

US CUSTOMARY UNITS WIN: 20337.00

Driller: MaineDOT Elevation (ft.) 122.2 Auger ID/OD: 5" Solid Stem

Operator: Giles/Daggett Datum: NAVD88 Sampler: Standard Split Spoon

Logged By: B. Wilder Rig Type: CME 45C Hammer Wt./Fall: 140#/30"

Date Start/Finish: 4/17/2014; 08:00-11:30 Drilling Method: Cased wash Boring Core Barrel: NQ-2"

Boring Location: 3+30.6, 12.7 ft Rt. Casing ID/OD: NW Water Level*: 9.0 ft bgs.

Hammer Efficiency Factor: 0.867 Hammer Type: Automatic Hydraulic Rope & Cathead

Definitions: R = Rock Core Sample Su = Insitu Field Vane Shear Strength (psf) Su(lab) = Lab Vane Shear Strength (psf)

D = Split Spoon Sample SSA = Solid Stem Auger Tv = Pocket Torvane Shear Strength (psf) WC = water content, percent

MD = Unsuccessful Split Spoon Sample attempt HSA = Hollow Stem Auger qp = Unconfined Compressive Strength (ksf) LL = Liquid Limit

U = Thin Wall Tube Sample RC = Roller Cone N-uncorrected = Raw field SPT N-value PL = Plastic Limit

MU = Unsuccessful Thin Wall Tube Sample attempt WOH = weight of 140lb. hammer Hammer Efficiency Factor = Annual Calibration Value PI = Plasticity Index

V = Insitu Vane Shear Test, PP = Pocket PenetrometerWOR/C = weight of rods or casing N60 = SPT N-uncorrected corrected for hammer efficiency G = Grain Size Analysis

MV = Unsuccessful Insitu Vane Shear Test attempt WO1P = Weight of one person N60 C = Consolidation Test

Remarks:

400# down pressure on Core Barrel.

Stratification lines represent approximate boundaries between soil types; transitions may be gradual. Page 1 of 1

* Water level readings have been made at times and under conditions stated. Groundwater fluctuations may occur due to conditions other

than those present at the time measurements were made. Boring No.: SB-CLIN-101

Depth (ft.)

Sa

mple

No.

Sample Information

Pen./

Rec. (in.)

Sa

mple

Depth

(ft.)

Blo

ws (/6 in.)

Shear

Strength

(psf)

N-uncorrected

N60

Casing

Blo

ws

Elevation

(ft.)

Graphic

Log

Visual Description and Remarks

Laboratory

Testing

Results/

AASHTO

and

Unified Class.

0

5

10

15

20

25

1D

1D/A

2D

R1

24/13

24/16

60/48

5.00 -

7.00

10.00 -

12.00

14.50 -

19.50

6/5/5/5

3/12/13/32

10

25

14

36

SSA

22

67

89

132

a175

NQ-2

122.87

117.70

108.50

103.70

4" PAVEMENT.

0.33

1D (5.0-5.5 ft) Brown, damp, loose, fine to coarse

GRAVEL, some sand, some silt, trace clay, occasional

cobbles, (Fill).

5.50

1D/A (5.5-7.0 ft) Brown, wet, loose, SILT, some clay,

some sand, trace gravel (Fill).

Brown, wet, medium dense, fine to medium GRAVEL, some

sand, some silt, trace clay, with brick pieces (Fill).

a175 blows for 0.5 ft.

Cobble from 14.5-14.7 ft bgs.

R1:Core Times (min:sec)

14.5-15.5 ft (4:09)

14.70

Top of Bedrock at Elev. 108.5 ft.

R1:Bedrock:Dark gray, white quartz veins. Moderately

soft to hard. No significant staining. Stronger

siltstone at top of core, highly fractured phyllite at

R1:Core Times cont. (min:sec)

15.5-16.5 ft (4:30)

16.5-17.5 ft (3:45)

17.5-18.5 ft (5:00)

No Water Return. Left 0.4 ft of core in hole.

19.50

Bottom of Exploration at 19.50 feet below ground

surface.

G#243129

A-1-b, GC-GM

G#243130

A-4, CL-ML

G#243131

A-4, GC-GM

Maine Department of Transportation Project: River Road Strut Replacement Boring No.: SB-CLIN-102

Soil/Rock Exploration LogLocation: Clinton, Maine

US CUSTOMARY UNITS WIN: 20337.00

Driller: MaineDOT Elevation (ft.) 123.2 Auger ID/OD: 5" Solid Stem

Operator: Giles/Daggett Datum: NAVD88 Sampler: Standard Split Spoon

Logged By: B. Wilder Rig Type: CME 45C Hammer Wt./Fall: 140#/30"

Date Start/Finish: 4/17/2014; 11:30-14:00 Drilling Method: Cased wash Boring Core Barrel: NQ-2"

Boring Location: 3+57.3, 7.0 ft Lt. Casing ID/OD: NW Water Level*: 9.0 ft bgs.

Hammer Efficiency Factor: 0.867 Hammer Type: Automatic Hydraulic Rope & Cathead

Definitions: R = Rock Core Sample Su = Insitu Field Vane Shear Strength (psf) Su(lab) = Lab Vane Shear Strength (psf)

D = Split Spoon Sample SSA = Solid Stem Auger Tv = Pocket Torvane Shear Strength (psf) WC = water content, percent

MD = Unsuccessful Split Spoon Sample attempt HSA = Hollow Stem Auger qp = Unconfined Compressive Strength (ksf) LL = Liquid Limit

U = Thin Wall Tube Sample RC = Roller Cone N-uncorrected = Raw field SPT N-value PL = Plastic Limit

MU = Unsuccessful Thin Wall Tube Sample attempt WOH = weight of 140lb. hammer Hammer Efficiency Factor = Annual Calibration Value PI = Plasticity Index

V = Insitu Vane Shear Test, PP = Pocket PenetrometerWOR/C = weight of rods or casing N60 = SPT N-uncorrected corrected for hammer efficiency G = Grain Size Analysis

MV = Unsuccessful Insitu Vane Shear Test attempt WO1P = Weight of one person N60 C = Consolidation Test

Remarks:

400# down pressure on Core Barrel.

Stratification lines represent approximate boundaries between soil types; transitions may be gradual. Page 1 of 1

* Water level readings have been made at times and under conditions stated. Groundwater fluctuations may occur due to conditions other

than those present at the time measurements were made. Boring No.: SB-CLIN-102

Depth (ft.)

Sa

mple

No.

Sample Information

Pen./

Rec. (in.)

Sa

mple

Depth

(ft.)

Blo

ws (/6 in.)

Shear

Strength

(psf)

N-uncorrected

N60

Casing

Blo

ws

Elevation

(ft.)

Graphic

Log

Visual Description and Remarks

Laboratory

Testing

Results/

AASHTO

and

Unified Class.

Page 14: .0 0 M R 7 .0IN 7 3W 3 0 2€¦ · 629.05 620.58 620.54 619.1401 619.12 618.14 615.07 610.08 606.79 606.353 606.23 534.71 527.303 511.07 511.07 508.13 409.15 403.213 403.208 304.10

3+00

4+005+00

6+00

7+00

8+00

8+348+34

PO

B

=

ST

A.

3+

00.0

0

PC

=

ST

A.

4+

07.0

7

PT

=

ST

A. 4

+84.74

PC

=

ST

A. 5

+44.04

PT

=

ST

A.

6+

06.8

5

PC

=

ST

A.

6+

52.1

6

PT

=

ST

A.

7+

73.2

6

PO

E

=

ST

A.

8+

34.3

7

ZO

NE

RIVER ROAD

LOT 4B

TAX MAP 2

JA

CKIN

S

BR

OO

K

FL

OW

JACKINS BROOK

LIMITS

LIMITS

LIMITS

OF

OF

OF

WROUGHT

WROUGHT

WROUGHT

PORTION

PORTION

PORTION

LIMITS

OFWROUGHT

PORTION

TO TARDIFF ROAD

TO BENTON

PO

WER POLE

LAURA E. FLOOD

TIMOTHY E. FLOOD

DANA P. FLOOD

SARAH C. FLOOD

P.L.

+25

40.0

0’

33.0

0’

33.0

0’

33.0

0’

+15+70+55

55’

65’

+85 +90

65’

60’

P.L.+30

40.0

0’

33.0

0’

33.0

0’3

3.0

0’

P.L.

+54*

END B.L.

45.31’

+69*

FLOOD FARM PROPERTIES, LLC

ERIN L. FLOOD

TIMOTHY E. FLOOD

FLOOD FARM PROPERTIES, LLC

DR

AIN.

EASEMENT

EASEMENT

LIM

ITS

LIM

ITS

DR

AIN

AG

E

BEGIN B.L.

+78*

+38*

107.07’

77.67’59.30’

E = 1.01’T = 38.87’L = 77.67’R = 750.00’

PI = 4+45.94CURVE DATA #1

E = 0.66’

T = 31.42’

L = 62.81’

R = 750.00’

PI = 5+75.46

CURVE DATA #2

E = 2.63’

T = 60.70’

L = 121.10’

R = 700.00’

PI = 7+12.86

CURVE DATA #3

62.81’

82.07’

81.09’

59.30’ 65.57’23.15’

+44*

39’*42’*

TE

MP.

CONSTRUCTION

+35+20

+85*

+31*

55’

LIM

ITS

+60

+50

ï »¿1065î��

ï »¿25î��ï »¿30î��

ï »¿1800î��

ï »¿80î��

CONSTRUCTION

LI

MITS

TE

MP

OR

AR

Y

ï »¿180î��

ï »¿350î��ï »¿925î��

ï »¿805î��

ï »¿680î��

ï »¿715î��

ï »¿305î��

ï »¿365î��

49’*

34’*

GRID

OUTLET DRAINAGE STRUCTURE

STA. 4+50 TO 4+90 RT.

STA. 4+15 TO 4+70 LT.INLET DRAINAGE STRUCTURE

45.0

0’

46.0

0’

40.0

0’45.0

0’

82.22’72.93’

59.32’ 59.44’ 23.15’59’*

14’*

STATE AID HIGHWAY NO. 2

MAINE D.O.T.’ S PROJECT.

WHICH IS NOT BEING IMPACTED BY

SUBJECT TO FERC LICENSE NO. 2322

JACKINS BROOK AND KENNEBEC RIVER

NOTE:

LO

T

LIN

E

TOTAL AREA = 54* AC. (TAX RECORDS)

TEMP. CONST. RIGHTS = 365* S.F. (1)

DRAINAGE EASE. = 680* S.F. (1)

LAND = 55* S.F. (EASE. FOR HIGHWAY PURPOSES) (2)

PARCEL NO. (2)

TOTAL AREA = 25* AC. (TAX RECORDS)

TEMP. CONST. RIGHTS = 805* S.F. (1)

DRAINAGE EASE. = 350* S.F. (1)

LAND = 1065* S.F. (EASE. FOR HIGHWAY PURPOSES)

PARCEL NO. (1)

TOTAL AREA = 8.4* AC. (DEED)

TEMP. CONST. RIGHTS = 925* S.F. (1)

DRAINAGE EASE. = 180* S.F. (1)

LAND = 1800* S.F. (EASE. FOR HIGHWAY PURPOSES)

PARCEL NO. (3)

TOTAL AREA = 167* AC. (TAX RECORDS)

TEMP. CONST. RIGHTS = 305* S.F. (1)

DRAINAGE EASE. = 715* S.F. (1)

LAND = 80* S.F. (EASE. FOR HIGHWAY PURPOSES)

PARCEL NO. (4)

New PoleNew Pole

NO. GRANTOR INSTRUMENT DATE BOOK PAGE

COUNTY RECORDSHEET NUMBER

OFDATE

COMMISSIONER

CHIEF ENGINEER

REVISIONS

NO. DATE DESCRIPTION BY

SY

MB

OLS

(SE

PTIC T

AN

K)

WA

TE

R LIN

E

GA

S LIN

E

ELE

CT

RIC LIN

E

TE

LE

PH

ON

E LIN

E

SE

WE

R LIN

E

PR

OP

ER

TY LIN

E

EXIS

TIN

G RIG

HT O

F W

AY

CO

NT

RO

L O

F A

CC

ES

S

NE

W RIG

HT O

F W

AY

RIG

HT O

F W

AY M

AP

ST

AT

E O

F M

AIN

E

DE

PA

RT

ME

NT O

F T

RA

NSP

OR

TA

TIO

N

16 S

TA

TE H

OU

SE ST

ATIO

N - A

UG

UST

A, M

E 0

4333-0

016

NE

W R

OW W

ITHIN E

XIS

T.

RO

W

BM

GR

ADIN

G LIM

IT LIN

E

CO

NS

TR

UC

TIO

N LIM

IT LIN

E PL

(WE

LL)

(RO

W M

ON

UM

EN

T)

(TR

AV

ER

SE P

OIN

T)

ITE

MT

EC

HC

HE

CK

ED

BA

SE

MA

P

EXIS

T.

R/

W

PR

OP.

LIN

ES

AR

EA

S

RIGHT-OF-WAY MAP

PIN

SHEET XX OF XXSCALE 1"= 25’

PLAN FILED IN PLAN BOOK PAGE

HIG

HW

AY

Divisio

n:

Filena

me:...\

HIG

HW

AY\

MS

TA\

014

_R

WP

LA

N1.d

gn

Userna

me:

Date:4/2

7/2

015

nic

holas.w.h

artle

y

S.T.

WW

GG

EE

TT

WE

LL

(IR

ON PIP

E or PIN F

OU

ND)

IPor

IPF

LIM

ITS O

F W

RO

UG

HT P

OR

TIO

N (

L.O.W.P.)

1415

20337.00

STATE PROJECT NO. 20337.00

CLINTON

CLIN

TO

N

RIVER ROAD

KENNEBEC COUNTY

STATE AID HIGHWAY NO. 2

D.W.B.

D.W.B.

D.W.B.

FEBRUARY 2015

D.O.T. FILE NO. 6-X

DAVID BERNHARDT

JOYCE NOEL TAYLOR

72"

CMP

72"

CMP

14"

AS

H

TOP

OF PIP

E

TOP

OF PIP

E

TOP

OF PIP

E

JAC

KIN

S BR

OO

K SETTLED 17

72

130/10

9

IPF

2"

DIA PIN STEEL SPIK

E

18"

CMP

18"

IPF

2"

DIA PIN STEEL SPIK

E

6"

DIA

WO

OD

15"

CMP

TOP

OF PIP

E

24"

PCP

128

WROUGHT PORTION (L.O.W.P.)HIGHWAY PURPOSES WITHIN LIMITS

OFNOTE: PRESCRIPTIVE EASEMENT FOR

STB128/10

7

131/

1/110

Page 15: .0 0 M R 7 .0IN 7 3W 3 0 2€¦ · 629.05 620.58 620.54 619.1401 619.12 618.14 615.07 610.08 606.79 606.353 606.23 534.71 527.303 511.07 511.07 508.13 409.15 403.213 403.208 304.10

Filena

me:

Userna

me:

Date:

ST

AT

E O

F M

AIN

E

DE

PA

RT

ME

NT O

F T

RA

NSP

OR

TA

TIO

N

RE

GIO

N 2

D.M.H

anks

DETOUR

AHEAD

DETOUR

ROAD

CLOSED

DETOUR

July 2

014

DETOUR

ROAD

CLOSED

500 FT.

ROAD

CLOSED

1000 FT.

1

ROAD

CLOSED

ROAD

CLOSED

2

3

4

5

6

7ROAD CLOSED

LOCAL TRAFFIC ONLY

DETOUR

DETOUR

END8

9

10

DETOUR11

ROAD

CLOSED

MILE21

OUTLET

NO

12

1 MILE

DETOUR

ROAD CLOSED

1 MILE EAST

13

ROAD CLOSED

X

14MILES AHEAD

ROAD CLOSED

3 MILES EAST

15

NOT TO SCALE

SHEET NUMBER

OF

DE

SIG

N-

DE

TAIL

ED

N

HA

RT

LE

Y

SH

AW

N

SMIT

HP

ROJ.

MA

NA

GE

R

DE

SIG

N2-

DE

TAIL

ED

2

15

16

X

ROAD CLOSED

LOCAL TRAFFIC ONLY

DETOUR

X

17

20337.0

020337.0

0

15

°

%

$

100

201

23

°

%

$

100

201

23

17

16

1

1

1

1

1

1

RIVER RD

RIVER RD

RIVER RD

RIVER RD

RIVER RDRIVER RD

RIVER RD

RIVER RD

RIVER RD

CLIN

TO

N

RIV

ER R

OA

D D

ET

OU

R

7

7

7

7

5

5 6

6

1010

4

4

MILES AHEAD

MILES AHEAD

3

3

8

8

22


Recommended