MIPAS-STR IMK-Seminar 7 Oktober 2005 1
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft
MIPAS aircraft : current activities (update 07.10.2005)POF: Topic 4: Changes in the Tropopause Region
Topic 5: The Stratosphere in a Changing Environment
Current group members : Thomas Gulde, Corneli Keim, Guangyuan Liu, Christof Piesch, Cornelis Blom, (Michael Höpfner, AME) Former group members : Dagmar Buggle, Esat Cetin, Norbert Glatthor, Michael Höpfner, Wolfgang Kimmig,
Katrin Lessenich, Peter Loes, Guillaume Piard, Christian Sartorius, Ralf Schlipper
MIPAS-STR : MIPAS on stratospheric aircraft (M55-Geophysica) http://www-imk.fzk.de/asf/mipas-str/
MIPAS-STR IMK-Seminar 7 Oktober 2005 2
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaftmain activities since 27 April 2005
HALO: GLORIA-AB and POLSTRACC
Demonstrator (Praktikum Elio König, Sept. 2005 )
Preparation for the SCOUT-O3 campaign (Nov/Dec 2005)
Telemetry: up- and downlink (cooperation with IPE)TC5 : Testcampaign from O‘hofen (July 2005)
Data retrieval of the Aracatuba campaign
MIPAS-STR IMK-Seminar 7 Oktober 2005 3
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft
Elio beim Montieren des GLORIA Demonstrators
Jetzige Version des Demonstrators
Laborstruktur mit:
Komplettes DPI (Rotor, Stator, Antrieb, Strahteilereinheit).
LMI-Zweig wurde getestet mit Bruker IFME
Nächste Ausbaustufe:
Detektorarray (AIM)
Quelle
MIPAS-STR IMK-Seminar 7 Oktober 2005 4
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaftmain activities since 27 April 2005
HALO: GLORIA-AB and POLSTRACC
Demonstrator (Sept. 2005, Elio König)
Preparation for the SCOUT-O3 campaign (Nov/Dec 2005)
Telemetry: up- and downlink (cooperation with IPE)TC5 : Testcampaign from O‘hofen (July 2005)
Data retrieval of the Aracatuba campaign
MIPAS-STR IMK-Seminar 7 Oktober 2005 5
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft
4.11.
4.11.
7.11.
8.11.
11.11.
11.11.
MIPAS-STR IMK-Seminar 7 Oktober 2005 6
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft
Preliminary conclusions (27 April 2005)• Zenith measurements successful
(improved deep-space calibration)• Telemetry: up- and downlink: successful, but improvement needed for SCOUT • Various other changes (heaters etc.) worked excellent (tropics !!)• Despite various ‘logistical’ problems (extremely short preparation phase in
Aracatuba) and inherent problems with clouds we have obtained good measurements at the time of the Envisat overpass.
2nd shutter for zenith measurements
MIPAS-STR IMK-Seminar 7 Oktober 2005 7
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft
System: IridiumDatenrate: 300 bytes/sec
= 1 Datenpaket / 2s
Successful tests in the two flights during TC5 (July 2005)
Telemetry
MIPAS-STR IMK-Seminar 7 Oktober 2005 8
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaftmain activities since 27 April 2005
HALO: GLORIA-AB and POLSTRACC
Demonstrator (Sept. 2005, Elio König)
Preparation for the SCOUT-O3 campaign (Nov/Dec 2005)
Telemetry: up- and downlink (cooperation with IPE)TC5 : Testcampaign from O‘hofen (July 2005)
Data processing of the Araçatuba campaign
MIPAS-STR IMK-Seminar 7 Oktober 2005 9
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft
raw spektra 17.2.2005 Aracatuba (only phase corrected)
0
50
100
150
200
250
300
350
750 800 850 900 950 1000
wavenumber [cm-1]
radi
ance
[arb
itrar
y un
its]
"deep" space (+10°)zenith (+90°)
MIPAS-STR IMK-Seminar 7 Oktober 2005 10
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft
raw spektra 17.2.2005 Aracatuba (only phase corrected)
0
20
40
60
80
100
120
140
860 865 870 875 880 885
wavenumber [cm-1]
radi
ance
[arb
itrar
y un
its]
"deep" space (+10°)zenith (+90°)
0
50
100
150
200
250
300
785 790 795 800 805 810
wavenumber [cm-1]
radi
ance
[arb
itrar
y un
its]
MIPAS-STR IMK-Seminar 7 Oktober 2005 11
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft17.02.2005 : MIPAS-STR tangent points
12:45 UTC 18.9 °S
13:20 UTC 22.6 °S
FalconGeophysica
MIPAS-STR IMK-Seminar 7 Oktober 2005 12
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft
Continuum from micro window #11 (952.03 – 953.50 cm-1 )
MIPAS-STR IMK-Seminar 7 Oktober 2005 13
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft15.02.2005 : MIPAS-STR tangent points
MIPAS-STR IMK-Seminar 7 Oktober 2005 14
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft17.02.2005 : MIPAS-STR tangent points
12:45 UTC 18.9 °S
13:20 UTC 22.6 °S
FalconGeophysica
MIPAS-STR IMK-Seminar 7 Oktober 2005 15
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft
8
9
10
11
12
13
14
15
16
17
18
19
20
21
195 200 205 210 215 220 225 230 235 240 245 250 255
Flight 20050217
H
eigh
t [km
]
MIPAS-STR ECMWF UCSE
T [k]
MIPAS-STR IMK-Seminar 7 Oktober 2005 16
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft
8
9
10
11
12
13
14
15
16
17
18
19
20
21
0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 2.0 2.2
Flight 20050217
VMR [ppb]
Hei
ght [
km]
MIPAS-STR (HNO3) SIOUX (NOy - NO) SIOUX (NOy)
HNO3
MIPAS-STR IMK-Seminar 7 Oktober 2005 17
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft
14
15
16
17
18
19
20
21
0 1 2 3 4 5 6 7 8 9 10
MIPAS-STR (T+2k) MIPAS-STR (T+1k) MIPAS-STR FLASH FISH
Flight 20050217
VMR [ppm]
Hei
ght [
km]
H2O
MIPAS-STR IMK-Seminar 7 Oktober 2005 18
Forschungszentrum Karlsruhe in der Helmholtz-GemeinschaftSummary (7 October 2005)
HALO: GLORIA-AB and POLSTRACC
Demonstrator : our contribution in-line with schedule
Preparation for the SCOUT-O3 campaign (Nov/Dec 2005)
Telemetry: up- and downlink : completed and testedTC5 (for CHRISTA-NF and MARSCHALLS)
2 successful test flights for MIPAS-STR
Data retrieval of the Aracatuba campaign
17.02.2005 flight : profiles for CH1, work on CH2 in progress15.02.2005 flight : level-1 processing in progress
Page 19 TROCCINOX Science Meeting, Aracatuba, 17 February 2005
Page 20 TROCCINOX Science Meeting, Aracatuba, 17 February 2005
ENVISAT Launch : 1 March 2002
Chemistry Payload on ENVISAT: MIPAS, SCIAMACHY and GOMOS
Validation of the ENVISAT measurements :
ESABC (ENVISAT Stratospheric Aircraft and Balloon Campaign)
Earlier validation activities : middle- and high latitudes
February 2005 : Validation in the tropics
Aircraft: Bandeirante, Falcon and the Geophysica
Page 21 TROCCINOX Science Meeting, Aracatuba, 17 February 2005
Motivation for validation in the tropics
Interesting region for science, thus accurate satellite data needed
Measurements from Satellite difficult because Low temperatures at the tropopause
Relatively high vertical resolution required
Page 22 TROCCINOX Science Meeting, Aracatuba, 17 February 2005
Why aircraft measurements for Envisat validation
Envisat is in a polar sun synchronous orbit
Equator crossing time : 10 and 22 hrs local time
Distance between two orbits about 3000 km
Aircraft can carry a large payload for - internal validation- measurement of complementary species
MIPAS-STR IMK-Seminar 7 Oktober 2005 23
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft
• Campaign base - Aracatuba - and approximate range of aircraft sorties. • The bold black lines show the area of operation.
MIPAS-STR IMK-Seminar 7 Oktober 2005 24
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft
MIPAS-STR IMK-Seminar 7 Oktober 2005 25
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft
MIPAS-STR IMK-Seminar 7 Oktober 2005 26
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft
MIPAS-STR IMK-Seminar 7 Oktober 2005 27
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft
Page 28 TROCCINOX Science Meeting, Aracatuba, 17 February 2005
Quick-look MIPAS-STR
Quick-looks for the 15.02.05 and 17.02.05 flights The quick-look contains:
Location of the tangent pointsCloud information from DC output of MIPAS-STR
Conclusions
Page 29 TROCCINOX Science Meeting, Aracatuba, 17 February 2005
Page 30 TROCCINOX Science Meeting, Aracatuba, 17 February 2005
10:00 11:00 12:00 13:00 14:00 15:00
1000
100
Pre
ssur
e [h
Pa]
Time UTC
Pstat
Page 31 TROCCINOX Science Meeting, Aracatuba, 17 February 2005
B
C
Page 32 TROCCINOX Science Meeting, Aracatuba, 17 February 2005
B
A
Page 33 TROCCINOX Science Meeting, Aracatuba, 17 February 2005
C
A
Page 34 TROCCINOX Science Meeting, Aracatuba, 17 February 2005
Flight 1, Aracatuba 15.2.05
2
2.5
3
3.5
4
10:30 10:45 11:00 11:15 11:30 11:45 12:00 12:15 12:30 12:45 13:00 13:15 13:30 13:45 14:00UTC
DC
Cha
nnel
#2
8
9
10
11
12
13
14
15
16
17
18
19
-0.72
0.1
1
3elev
atio
n an
gle
|
ta
ngen
t hei
gt
B C
Page 35 TROCCINOX Science Meeting, Aracatuba, 17 February 2005
Conclusions A – B : 28 limb scans (profiles); channel 1+2;
1st half with clouds below 13 km; 2nd half only clouds at the lower (8 and 9 km) tangent heights.
B – C: a few limb scans after the dive; channel 2 only; Thin clouds at the lower tangent heights (8 and 9 km);
C – A : 10 + 1 limb scans (in between non-linearity measurements) ; channel 2 only Thin clouds at the lower tangent heights (8 and 9 km)
Overpass 12:48 UTC at C “cloud free”
Page 36 TROCCINOX Science Meeting, Aracatuba, 17 February 2005
Page 37 TROCCINOX Science Meeting, Aracatuba, 17 February 2005
Page 38 TROCCINOX Science Meeting, Aracatuba, 17 February 2005
A
BC D
E
Page 39 TROCCINOX Science Meeting, Aracatuba, 17 February 2005
BC D
Page 40 TROCCINOX Science Meeting, Aracatuba, 17 February 2005
DC
Page 41 TROCCINOX Science Meeting, Aracatuba, 17 February 2005
D
E
Page 42 TROCCINOX Science Meeting, Aracatuba, 17 February 2005
Flight 2, Aracatuba 17.2.05
0.6
0.65
0.7
0.75
0.8
0.85
0.9
0.95
1
11:00 11:15 11:30 11:45 12:00 12:15 12:30 12:45 13:00 13:15 13:30UTC
DC C
hann
el#1
8
9
10
11
12
13
14
15
16
17
18
19
-0.72
0.1
1
3
elev
atio
n an
gle
|
ta
ngen
t hei
gt
B C D E
Page 43 TROCCINOX Science Meeting, Aracatuba, 17 February 2005
Conclusions
During the complete flight clouds were in the field of view of the MIPAS-STR instrument and of course also in that of MIPAS-Envisat, except in the last section
The last section was cloud free even at the 8 km tangent point and will be extremely useful for MIPAS-Envisat validation
MIPAS-STR IMK-Seminar 7 Oktober 2005 44
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft
Preliminary conclusions• Zenith measurements successful
(improved deep-space calibration)• Telemetry: up- and downlink: succesful, but improvement needed for SCOUT • Various other changes (heaters etc.) worked excellent (tropics !!)• Despite various ‘logistical’ problems (extremely short preparation phase in
Aracatuba) and inherent problems with clouds we have obtained good measurements at the time of the Envisat overpass.
2nd shutter for zenith measurements
MIPAS-STR IMK-Seminar 7 Oktober 2005 45
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft
MIPAS-STR Schedule in Aracatuba
• 05.02.2005: Arrival of the MIPAS-STR team• 11.02.2005: Arrival of the MIPAS dome and interface• 12.02.2005: Installation of MIPAS-ST• 13.02.2005: EMC and engine tests• 15.02.2005: First Envisat validation flight (7:18 LT !!)
Page 46 TROCCINOX Meeting, Aracatuba, 23 February 2005
Overview of the flights wrt coincidences
with MIPAS and SCIAMACHY OBSERVATIONS
(includes all TROCCINOX flights were accidentally good coincidences were obtained)
Aircraft: Geophysica (Falcon)
(prepared by A. Lengel and C.E. Blom)
Page 47 TROCCINOX Meeting, Aracatuba, 23 February 2005
01.02.2005SCIA: 13:12 UTC
M55: 15:20 – 19:30 UTC
Page 48 TROCCINOX Meeting, Aracatuba, 23 February 2005
04.02.2005SCIA: 13:18 UTC
M55: 17:00 – 21:20 UTC
Page 49 TROCCINOX Meeting, Aracatuba, 23 February 2005
05.02.2005SCIA: 12:46 UTC
M55: 17:00 – 21:30 UTC
Page 50 TROCCINOX Meeting, Aracatuba, 23 February 2005
08.02.2005SCIA: 12:53 UTC
M55: 13:00 – 17:30 UTC
Page 51 TROCCINOX Meeting, Aracatuba, 23 February 2005
12.02.2005MIPAS: 12:42 UTCSCIA: 13:12 UTC
M55: 15:20 – 19:30 UTC
Page 52 TROCCINOX Meeting, Aracatuba, 23 February 2005
15.02.2005MIPAS: 12:48 UTCSCIA: 12:32 UTC
M55: 10:18 – 15:05 UTC
Page 53 TROCCINOX Meeting, Aracatuba, 23 February 2005
17.02.2005MIPAS: 13:25 UTCSCIA: 13:09 UTC
M55: 09:40 – 14:05 UTC
Page 54 TROCCINOX Meeting, Aracatuba, 23 February 2005
18.02.2005MIPAS: 12:54 UTCSCIA: 12:38 UTC
M55: 17:55 – 21:45 UTC
Page 55 TROCCINOX Meeting, Aracatuba, 23 February 2005
Coincidences of TROCCINOX and ENVISAT measurements
Date M55 SCIA MIPAS Comments01.02.05 15:20-19:30 13:12 -- Close to SCIA (> 3 hrs late)
04.02.05 17:00-21:20 13:18 -- 5 hrs after SCIA
05.02.05 17:00-21:30 12:46 -- 5 hrs after SCIA
08.02.05 13:00-17:30 12:53 -- Good coincidence (time/loc)
12.02.05 09:00-13:40 12:27 12:42 1 hr after SCIA and MIPAS
15.02.05 10:18-15:05 12:32 12:48 Good coincidence (time/loc)
17.02.05 09:40-14:15 13:09 13:25 Good coincidence (time/loc)
18.02.05 17:55-21:45 12:38 12:54 5 hrs after SCIA and MIPAS
Page 56 TROCCINOX Meeting, Aracatuba, 23 February 2005
Conclusions
Excellent coincidences between satellite and the aircraft measurements have been obtained for 4 flights
High quality in-situ and remote sensing data have been obtained
The measurements made during the campaign will provide the most extensive data set for the validationof Envisat in the tropics.